Plan review and inspection companies shall submit an application
in order to be evaluated and possibly added to the approved third
party plan reviewers and inspectors. The initial application fee is
one hundred dollars ($100.00) and the annual renewal fee is fifty
dollars ($50.00).
(Ordinance 2010-023, sec. 2, adopted 6/28/10; 1988 Code, sec. 7-3)
(a)
Building department fees.
(1)
Residential.
(A)
New single-family home or duplex: $0.50 sq. ft.
(B)
Remodel, alteration or addition: $0.25 sq. ft. $500.00 max.
(C)
Residential reroof: $50.00.
(D)
Concrete/driveway: $50.00.
(E)
Accessory building - without MEP: $100.00.
(F)
Accessory building - with MEP: $150.00.
(J)
General electrical work: $50.00.
(N)
Miscellaneous plumbing repair: $50.00.
(R)
Swimming pool - above ground: $75.00.
(S)
Swimming pool - below ground: $200.00.
(T)
Swimming pool - repair/correction: $75.00.
(W)
Foundation repair: $50.00.
(X)
EV charging system: $50.00.
(Y)
Generator installation: $50.00.
(2)
Commercial.
(A)
Commercial new: Value based.
(B)
Commercial remodel: Value based.
(C)
Commercial reroof: Value based.
(D)
Commercial mechanical: Value based.
(E)
Commercial electrical: Value based.
(F)
Commercial plumbing: Value based.
(G)
Parking lot/paving: Value based.
(H)
Retaining wall over 32": $100.00.
(J)
Solar system: Value based.
(K)
Accessory building: Value based.
(M)
Swimming pool: Value based.
(N)
Plan review: 25% of permit fee.
(3)
Certificate of occupancy.
(A)
Certificate of occupancy: $100.00.
(B)
CO - Name change only: $25.00.
(D)
Temporary certificate of occupancy: $150.00.
(4)
Signs.
(A)
<50 sq. ft. (single sided or re-face): $50.00.
(B)
<50 sq. ft. (double sided): $75.00.
(C)
>50 sq. ft. (single sided or re-face): $100.00.
(D)
>50 sq. ft. (double sided): $150.00.
(F)
Flags and banners (temp signs): $75.00.
(H)
Billboard annual registration: $100.00.
(5)
Miscellaneous building department permits.
(B)
Moving (building): $100.00 per building.
(C)
Construction trailer: $100.00.
(E)
Temp pole electric: $50.00.
(b)
Engineering department fees.
(1)
Site plan review: $120.00 an hour.
(3)
Engineering inspections: $120.00 an hour.
(5)
Clearing permit (tree removal): $200.00.
(6)
Right-of-way (ROW) - working in right-of-way: $100.00.
(7)
Third-party consultation, review or inspections: Actual cost.
(8)
Platting.
(A)
Preliminary plat.
Will be a gradual increasing
scale as follows:
(i) 1 lot: $300.00 per plat plus one dollar ($1.00)
per lot.
(ii) 2—4 lots: $300.00 per plat plus one dollar
($1.00) per lot.
(iii) 5—10 lots: $500.00 per plat plus ten dollars
($10.00) per lot.
(iv) 11—15 lots: $750.00 per plat plus ten dollars
($10.00) per lot.
(v) 16—20 lots: $1,000.00 per plat plus fifteen
dollars ($15.00) per lot.
(vi) 21—50 lots: $1,500.00 per plat plus fifteen
dollars ($15.00) per lot.
(vii) 51—over lots: $2,000.00 per plat plus twenty
dollars ($20.00) per lot.
(B)
Final plat.
(i) 1 lot: $300.00 per plat plus one dollar ($1.00)
per lot.
(ii) 2—4 lots: $300.00 per plat plus one dollar
($1.00) per lot.
(iii) 5—10 lots: $500.00 per plat plus ten dollars
($10.00) per lot.
(iv) 11—15 lots: $750.00 per plat plus ten dollars
($10.00) per lot.
(v) 16—20 lots: $1,000.00 per plat plus fifteen
dollars ($15.00) per lot.
(vi) 21—50 lots: $1,500.00 per plat plus fifteen
dollars ($15.00) per lot.
(vii) 51—over lots: $2,000.00 per plat plus twenty
dollars ($20.00) per lot.
(C)
Replats.
(i) 1 lot: $300.00 per plat plus one dollar ($1.00)
per lot.
(ii) 2—4 lots: $300.00 per plat plus one dollar
($1.00) per lot.
(iii) 5—10 lots: $500.00 per plat plus ten dollars
($10.00) per lot.
(iv) 11—15 lots: $750.00 per plat plus ten dollars
($10.00) per lot.
(v) 16—20 lots: $1,000.00 per plat plus fifteen
dollars ($15.00) per lot.
(vi) 21—50 lots: $1,500.00 per plat plus fifteen
dollars ($15.00) per lot.
(vii) 51—over lots: $2,000.00 per plat plus twenty
dollars ($20.00) per lot.
(D)
Master plats.
When submitted with a preliminary
plat the fee shall be an additional ten dollars ($10.00) per lot.
When submitted separately the fees will be as follows:
(i) 1 lot: $300.00 per plat plus one dollar ($1.00)
per lot.
(ii) 2—4 lots: $300.00 per plat plus one dollar
($1.00) per lot.
(iii) 5—10 lots: $500.00 per plat plus ten dollars
($10.00) per lot.
(iv) 11—15 lots: $750.00 per plat plus ten dollars
($10.00) per lot.
(v) 16—20 lots: $1,000.00 per plat plus fifteen
dollars ($15.00) per lot.
(vi) 21—50 lots: $1,500.00 per plat plus fifteen
dollars ($15.00) per lot.
(vii) 51—over lots: $2,000.00 per plat plus twenty
dollars ($20.00) per lot.
(E)
Minor plats.
Three hundred dollars ($300.00) per
minor plat.
In addition to these fees, an additional thirty nine dollar
check (or current filing fee) shall be submitted with all final plats,
replats and minor plats for county filing expense. The check shall
be made to the county clerk for filing fees.
|
(c)
Public work fees — water and sewer taps.
(1)
Water.
(A)
Standard 1" - in pavement: $1,790.00.
(B)
Standard 1" - in soil (same side): $890.00.
(C)
Standard 2" - in pavement: $2,610.00.
(D)
Standard 2" - soil (same side): $1,900.00.
(E)
Split service - in pavement: $2,610.00.
(F)
Split service - soil (same side): $1,100.00.
(G)
5 & 5 program: See policy.
(H)
Deposit for construction water meter: $2,500.00.
(I)
Construction water meter rate: See section
A10.003 for commercial water rates.
(2)
Sewer.
(A)
Standard 4" - in pavement: $2,260.00.
(B)
Standard 4" - in soil (same side): $800.00.
(C)
Standard 6" - in pavement: $2,500.00.
(D)
Standard 6" - soil (same side): $1,000.00.
(E)
Split Service - in pavement: $2,210.00.
(F)
Split service - soil (same side): $1,000.00.
(G)
5 & 5 program: See policy.
(d)
Fire department and fire marshal fees.
(1)
Fire construction permit.
(A)
Underground fire main: $200.00.
(B)
Above-ground fire sprinkler system: $1.00 per fire sprinkler
head, $200.00 min - $1,200.00 max.
(C)
Fire alarm system: $1.00 per fire alarm device, $200.00 min
- $1,200.00 max.
(D)
Fixed fire extinguishing system: $150.00 per system.
(E)
Flammable and combustible liquids tanks: $100.00 per tank.
(G)
Spraying or dipping: $150.00.
(H)
Standpipe system: $150.00.
(I)
Electronic access doors and gates: $150.00.
(2)
Fire operational permit.
(B)
Fire works and pyrotechnics: $100.00.
(C)
Fire hydrants and valves: $50.00.
(D)
Hot work operations: $25.00.
(E)
Open burn - standard (residential): $50.00.
(F)
Open burn - standard (commercial): $250.00.
(G)
Open burn - recreational: $50.00.
(H)
Open burn - agriculture (annual): $50.00.
(I)
Temporary fuel dispensing and storage: $50.00 per tank.
(3)
Fire annual inspection.
(B)
Daycare (adult or child): $35.00.
(E)
Commercial building: $50.00.
(4)
Miscellaneous fire department fees.
(B)
Flow test: $50.00 per test.
(C)
False alarm fee - commercial 4 to 6 alarms: $50.00 per alarm
in a 12 month period.
(D)
False alarm fee - commercial 7 and more alarms: $75.00 per alarm
in a 12 month period.
(E)
Hotel or motel: $25.00 plus $5.00 a room.
(F)
Failed inspections over 3: Permit cost.
(G)
Licensed foster or adoption home <7 children (biannual):
$0.00.
(H)
Licensed foster home >7 children (annual): $100.00.
(I)
Requested general commercial fire inspections: $50.00 plus $0.10
a square foot.
(J)
Industrial or buildings over 50,000 sq. ft.: $200.00.
(K)
Miscellaneous fire inspection fee: $50.00 per hour.
(e)
Planning department fees.
(1)
Planning and zoning.
(A)
Zoning verification letter: $50.00.
(B)
Variance - board of adjustment: $300.00.
(D)
Minor com plan amendment: $400.00.
(E)
Specific use permit: $400.00.
(F)
Vacation of easement or alley: $200.00.
(G)
Annexations - disannexation: $350.00.
(H)
Planned development: $500.00.
(I)
Pre-dev meetings:
(i) Initial meeting and any additional city requested
meetings: No charge.
(ii) Additional meeting(s) requested by developer:
$200.00 per meeting.
(f)
Registration fees.
(1)
Contractor.
(B)
Sign contractor renewal: $35.00.
(2)
Other.
(A)
Historic districts vacant building - commercial: $500.00 (1st
year + $500.00 increase each year thereafter).
(B)
Historic districts vacant building - residential: $250.00 (1st
year + $25.00 increase each year thereafter).
(g)
Miscellaneous fees.
(1)
Inspection fee.
(A)
After hours: $100.00 hour (minimum 2 hours).
(C)
Historic district rental property reinspection: $25.00.
(D)
Stormwater: $50.00 a day.
(E)
Miscellaneous inspection fee: $50.00 per hour.
(2)
Other fees.
(B)
Work without permit: $50.00 per day plus double applicable permit
fee.
(E)
Miscellaneous permit: $50.00.
(F)
Third-party consultation, review or inspections: Actual cost.
(G)
Deconstruction permit: $25.00.
(h)
Commercial building valuation table.
Total Valuation
|
Fee
|
---|
$1.00 to $500.00
|
$35.00
|
$501.00 to $2,000.00
|
$35.00 for the first $500.00 plus $3.05 for each additional
$100.00, or fraction thereof, to and including $2,000.00
|
$2,001.00 to $25,000.00
|
$80.75 for the first $2,000.00 plus $14.00 for each additional
$1,000.00, or fraction thereof, to and including the $25,000.00
|
$25,001.00 to $50,000.00
|
$402.75 for the first $25,000.00 plus $10.10 for each additional
$1,000.00, or fraction thereof, to and including $50,000.00
|
$50,001.00 to $100,000.00
|
$655.25 for the first $50,000.00 plus $7.00 for each additional
$1,000.00, or fraction thereof, to and including $100,000.00
|
$100,001.00 to $500,000.00
|
$1,005.25 for the first $100,000.00 plus $5.60 for each additional
$1,000.00, or fraction thereof, to and including $500,000.00
|
$500,001.00 to $1,000,000.00
|
$3,245.25 for the first $500,000.00 plus $4.75 for each additional
$1,000.00, or fraction thereof, to and including $1,000,000.00
|
$1,000,001.00 and up
|
$5,620.25 for the first $1,000,000.00 plus $3.65 for each additional
$1,000.00, or fraction thereof
|
(Ordinance 2022-089 adopted 12/12/2022; Ordinance 2023-019 adopted 4/24/2023; Ordinance
2024-016 adopted 4/22/2024)