The legislature of the state has, in the Flood Control Insurance Act, Texas Water Code, section 16.315, delegated the responsibility to local governmental units to adopt regulations designed to minimize flood losses. Therefore, the city council does ordain as follows. This article shall be known and may be cited as the flood prevention ordinance of the city and shall apply to all special flood hazard areas within the city’s jurisdiction.
(Ordinance 11-3544, sec. I (19-51), adopted 2/17/11)
(a) 
The flood hazard areas of the city are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, and extraordinary public expenditures for flood protection and relief, all of which adversely affect the public health, safety and general welfare.
(b) 
These flood losses are created by the cumulative effect of obstructions in floodplains which cause an increase in flood heights and velocities, and by the occupancy of flood hazard areas by uses vulnerable to flood and hazardous to other lands because they are inadequately elevated, floodproofed or otherwise protected from flood damage.
(Ordinance 11-3544, sec. I (19-52), adopted 2/17/11)
(a) 
It is the purpose of this article to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in special flood hazard areas. This article is designed to regulate restrict uses of land that cause increases in flood heights or velocities and to prevent the construction of barriers which will divert floodwaters and subject other lands to greater flood hazards. Provisions of this article are designed to do the following:
(1) 
Protect human life and health;
(2) 
Minimize expenditure of public money for costly flood-control projects;
(3) 
Minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
(4) 
Minimize prolonged business interruptions;
(5) 
Minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains;
(6) 
Help maintain a stable tax base by providing for the sound use and development of floodprone areas in such a manner as to minimize future flood blight areas; and
(7) 
Ensure that potential buyers are notified that property is in a flood area.
(b) 
In order to accomplish its purposes, this article uses the following methods:
(1) 
Restrict or prohibit uses that are dangerous to health, safety or property in times of flood, or cause excessive increases in flood heights or velocities;
(2) 
Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;
(3) 
Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters;
(4) 
Control filling, grading, dredging and other development which may increase flood damage;
(5) 
Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands.
(Ordinance 11-3544, sec. I (19-53), adopted 2/17/11)
This article is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this article and another ordinance, easement, covenant, or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
(Ordinance 11-3544, sec. I (19-54), adopted 2/17/11)
Unless specifically defined below, words or phrases used in this article shall be interpreted to give them the meaning they have in common usage and to give this article its most reasonable application.
Alluvial fan flooding.
Flooding occurring on the surface of an alluvial fan or similar landform which originates at the apex and is characterized by high-velocity flows; active processes of erosion, sediment transport, and deposition; and unpredictable flow paths.
Apex.
A point on an alluvial fan or similar landform below which the flow path of the major stream that formed the fan becomes unpredictable and alluvial fan flooding can occur.
Appeal.
A request for review of the floodplain administrator’s interpretation of any provision of this article or a request for a variance.
Appeals board.
The city building trades and fire code board of appeals.
Appurtenant structure.
A structure which is on the same parcel of property as the principal structure to be insured and the use of which is incidental to the use of the principal structure.
Area of future conditions flood hazard.
The land area that would be inundated by the 1-percent annual chance (100-year) flood based on future conditions hydrology.
Area of shallow flooding.
A designated AO, AH, AR/AO, AR/AH, or VO zone on a community’s flood insurance rate map (FIRM) with a one-percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
Area of special flood hazard.
The land in the floodplain within a community subject to a one-percent or greater chance of flooding in any given year. The area may be designated as zone A on the flood hazard boundary map (FHBM). After detailed ratemaking has been completed in preparation for publication of the FIRM, zone A usually is refined into zones A, AO, AH, A1-30, AE, A99, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A, VO, V1-30, VE or V.
Base flood.
The flood having a one-percent chance of being equaled or exceeded in any given year.
Base flood elevation (BFE).
The elevation shown on the flood insurance rate map (FIRM) and found in the accompanying flood insurance study (FIS) for zones A, AE, AH, A1-A30, AR, V1-V30, or VE that indicates the water surface elevation resulting from the flood that has a one-percent chance of equaling or exceeding that level in any given year - also called the base flood.
Basement.
Any area of the building having its floor subgrade (below ground level) on all sides.
Breakaway wall.
A wall that is not part of the structural support of the building and is intended through its design and construction to collapse under specific lateral loading forces, without causing damage to the elevated portion of the building or supporting foundation system.
Critical feature.
An integral and readily identifiable part of a flood protection system, without which the flood protection provided by the entire system would be compromised.
Development.
Any manmade change to improved and unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials.
Elevated building.
For insurance purposes, a nonbasement building which has its lowest elevated floor, raised above ground level by foundation walls, shear walls, posts, piers, pilings, or columns.
Existing construction.
For the purposes of determining rates, structures for which the “start of construction” commenced before the effective date of the FIRM or before January 1, 1975, for FIRMs effective before that date. “Existing construction” may also be referred to as “existing structures.”
Existing manufactured home park or subdivision.
A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by a community.
Existing structures.
For the purpose of determining rates, structures for which the “start of construction” commenced before the effective date of the FIRM being February 18, 2011.
Expansion to an existing manufactured home park or subdivision.
The preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
Federal Emergency Management Agency (FEMA).
The parent organization for the Federal Insurance Administration.
Fill or filling.
The increase of elevation in any area by the addition of material to the surface of such area.
Flood elevation study.
An examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation and determination of mudslide (i.e., mudflow) and/or flood-related erosion hazards.
Flood insurance rate map (FIRM).
An official map of a community on which the Federal Emergency Management Agency has delineated both the areas of special flood hazards and the risk premium zones applicable to the community.
Flood insurance study (FIS).
See flood elevation study.
Flood management regulations.
Zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances, (such as floodplain ordinance, grading ordinance and erosion control ordinance) and other applications of police power. The term describes such state or local regulations, in any combination thereof, which provide standards for the purpose of flood damage prevention and reduction.
Flood or flooding.
A general and temporary condition of partial or complete inundation of normally dry land areas from:
(1) 
The overflow of inland or tidal waters.
(2) 
The unusual and rapid accumulation or runoff of surface waters from any source.
Floodplain management.
The operation of an overall program of corrective and preventive measures for reducing flood damage, including but not limited to emergency preparedness plans, flood-control works, and floodplain management regulations.
Floodplain or floodprone area.
Any land area susceptible to being inundated by water from any source (see definition of flooding).
Floodproofing.
Any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.
Flood protection system.
Those physical structural works for which funds have been authorized, appropriated, and expended and which have been constructed specifically to modify flooding in order to reduce the extent of the areas within a community subject to a “special flood hazard” and the extent of the depths of associated flooding. Such a system typically includes hurricane tidal barriers, dams, reservoirs, levees or dikes. These specialized flood modifying works are those constructed in conformance with sound engineering standards.
Floodway.
See regulatory floodway.
Floodway fringe.
The portion of the regulatory floodplain lying outside the floodway.
Functionally dependent use.
A use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and shipbuilding and ship repair facilities, but does not include long-term storage or related manufacturing facilities.
Highest adjacent grade.
The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.
Historic structure.
Any structure that is:
(1) 
Listed individually in the National Register of Historic Places (a listing maintained by the Department of the Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
(2) 
Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary of the Interior to qualify as a registered historic district;
(3) 
Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or
(4) 
Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either:
(A) 
By an approved state program as determined by the Secretary of the Interior; or
(B) 
Directly by the Secretary of the Interior in states without approved programs.
Levee.
A manmade structure, usually an earthen embankment, designed and constructed in accordance with sound engineering practices to contain, control or divert the flow of water so as to provide protection from temporary flooding.
Levee system.
A flood protection system which consists of a levee, or levees, and associated structures, such as closure and drainage devices, which are constructed and operated in accordance with sound engineering practices.
Lowest floor.
The lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, useable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building’s lowest floor provided that such enclosure is not built so as to render the structure in violation of the applicable nonelevation design requirement of section 60.3 of the National Flood Insurance Program regulations.
Manufactured home.
A structure transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. The term “manufactured home” does not include a “recreational vehicle.”
Manufactured home park or subdivision.
A parcel (or contiguous parcel) of land divided into two (2) or more manufactured home lots for rent or sale.
Master drainage plan.
The plan adopted and approved by the city council that established an estimated peak water surface elevation for playa lakes and rates of overflow between lakes for certain areas studied within the corporate city limits and its extraterritorial jurisdiction.
Mean sea level.
For purposes of the National Flood Insurance Program, the North American Vertical Datum (NAVD) of 1988 or other datum, to which base flood elevations shown on a community’s flood insurance rate map are referenced.
New construction.
For the purpose of determining insurance rates, structures for which the “start of construction” commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, “new construction” means structures for which the “start of construction” commenced on or after the effective date of a floodplain management regulation adopted by a community and includes any subsequent improvements to such structures.
New manufactured home park or subdivision.
A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of floodplain management regulations adopted by a community.
Recreational vehicle.
A vehicle which is:
(1) 
Built on a single chassis;
(2) 
400 square feet or less when measured at the largest horizontal projections;
(3) 
Designed to be self-propelled or permanently towable by a light duty truck; and
(4) 
Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
Regulatory floodway.
The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
Riverine.
Relating to, formed by, or resembling a river (including tributaries), stream, brook, etc.
Special flood hazard area.
See area of special flood hazard.
Start of construction.
For other than new construction or substantial improvements under the Coastal Barrier Resources Act (Pub. L. 97-348), includes substantial improvement and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, additional placement, or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Structure.
For floodplain management purposes, a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home.
Substantial damage.
Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty percent (50%) of the market value of the structure before the damage occurred.
Substantial improvement.
Any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds fifty percent (50%) of the market value of the structure before “start of construction” of the improvement. This term includes structures which have incurred “substantial damage,” regardless of the actual repair work performed. The term does not, however, include either:
(1) 
Any project for improvement of a structure to correct existing violations of state or local health, sanitary or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions; or
(2) 
Any alteration of a “historic structure,” provided that the alteration will not preclude the structure’s continued designation as a “historic structure.”
Variance.
A grant of relief by a community from the terms of a floodplain management regulation. (For full requirement see section 60.6 of the National Flood Insurance Program regulations.)
Violation.
The failure of a structure or other development to be fully compliant with the community’s floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in section 60.3(b)(5), (c)(4), (c)(10), (d)(3), (e)(2), (e)(4), or (e)(5) of 44 CFR, National Flood Insurance Program regulations, is presumed to be in violation until such time as that documentation is provided.
Water surface elevation.
The height, in relation to the North American Vertical Datum (NAVD) of 1988 (or other datum, where specified), of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.
(Ordinance 11-3544, sec. I (19-55), adopted 2/17/11)
This article shall apply to all areas of special flood hazard within the jurisdiction of the city.
(Ordinance 11-3544, sec. I (19-56), adopted 2/17/11)
The areas of special flood hazard identified by the Federal Emergency Management Agency in a current scientific and engineering report entitled, “The Flood Insurance Study (FIS) for Hale County, Texas and Incorporated Areas,” dated February 18, 2011, with accompanying flood insurance rate maps and/or flood boundary-floodway maps (FIRM and/or FBFM) dated February 18, 2011, and any revisions thereto are hereby adopted by reference and declared to be incorporated as a part of this article. The chief building official shall obtain, review, and utilize other base flood elevations and floodway data which might become available from federal, state, local, or private sources as criteria for requiring that new construction, substantial improvements, or other development within the city’s jurisdiction complies with this article. The studies shall be maintained on file in the office of public works and used as a basis for changes in requirements of this article recommended by the city council.
(Ordinance 11-3544, sec. I (19-57), adopted 2/17/11)
A floodplain development permit shall be required to ensure conformance with the provisions of this article.
(Ordinance 11-3544, sec. I (19-58), adopted 2/17/11)
No structure or land shall hereafter be located, altered, or have its use changed without full compliance with the terms of this article and other applicable regulations.
(Ordinance 11-3544, sec. I (19-59), adopted 2/17/11)
In the interpretation and application of this article, all provisions shall be:
(1) 
Considered as minimum requirements;
(2) 
Liberally construed in favor of the governing body; and
(3) 
Deemed neither to limit nor repeal any other powers granted under state statutes.
(Ordinance 11-3544, sec. I (19-60), adopted 2/17/11)
The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. On rare occasions greater floods can and will occur and flood heights may be increased by manmade or natural causes. This article does not imply that land outside the areas of special flood hazards or uses permitted within such areas will be free from flooding or flood damages. This article shall not create liability on the part of the community or any official or employee thereof for any flood damages that result from reliance on this article or any administrative decision lawfully made hereunder.
(Ordinance 11-3544, sec. I (19-61), adopted 2/17/11)
No structure or land shall hereafter be constructed, located, extended, converted, or altered without full compliance with the terms of this article and other applicable regulations. Violation of the provisions of this article by failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with conditions) shall constitute a misdemeanor punishable in accordance with section 1.01.009 of this code. Each day on which a violation shall occur or continue shall be deemed a separate and distinct offense. Nothing herein contained shall prevent the city from taking such other lawful action as is necessary to prevent or remedy any violation of this article.
(Ordinance 11-3544, sec. I (19-73), adopted 2/17/11)
(a) 
When available, there shall be furnished to persons requesting same, a copy of the city flood hazard boundary map.
(b) 
To cover the city’s cost, there shall be charged for each said map a sum of five and no/100 dollars ($5.00) payable to the city.
(Ordinance 11-3544, sec. I (19-74), adopted 2/17/11)
Severability is intended throughout and within this article. If any provision, including any section, paragraph, sentence, clause, phrase or word or the application thereof to any person or circumstance is held invalid, unconstitutional, or unenforceable by a court of law or administrative agency with jurisdiction over the matter, such action shall not be construed to affect any other valid portion of this article. A constitutional construction hereof is intended and shall be given. There is not intent herein to violate either of the Texas Constitution or the Constitution of the United States.