(a)
Applicant responsibilities.
(1)
Basic submittal requirements.
The applicant shall submit to the city no later than 30 days prior to the commission meeting at which the plat is to be considered:
(A)
Full filing fee;
(C)
Letter of transmittal, stating briefly the type of street surfacing, drainage, sanitary facilities, and water supply proposed;
(D)
The name and address of the owner or agent, engineer, and surveyor; and
(E)
Supplementary materials as applicable in other sections of this chapter.
(2)
Plat specifications.
The preliminary plat shall contain the following information:
(A)
Scale.
Drawn to not smaller than 200 feet.
(B)
Existing features inside subdivision.
(i)
Boundary lines.
The existing boundary lines (accurate in scale) of the land to be subdivided. Boundary lines shall be drawn in heavy lines for easy identification.
(ii)
Legal description.
A metes and bounds description of the property.
(iii)
Drainage.
The location of existing watercourses, railroads, and other similar drainage and transportation features.
(iv)
Location and width.
The location and width of existing streets, alleys, easements, buildings, structures, sewers, water mains, culverts or other underground structures within or adjacent to the tract.
(v)
Survey.
All of the survey requirements of section 10.02.009(a), Information Required, shall be met.
(D)
New features inside of subdivision.
(i)
The proposed name of the subdivision.
(ii)
The location, right-of-way width, and names of proposed streets.
(iii)
The approximate width and depth of all lots. If the side lines are not parallel, the approximate distance between them at the building line and at the narrowest point should be given.
(iv)
The location of building lines, alleys and easements.
(v)
The location and approximate size of sites for any educational services, place of public assembly, park and recreation facility or center, and/or any land use that is required to be approved as a special use pursuant to either table 14.03.003, Residential Uses by Zoning District, or table 14.03.004, Nonresidential Uses by Zoning District.
(vi)
The approximate acreage of the property to be subdivided.
(vii)
Key map. A key map showing the relationship of the subdivision to major thoroughfares in all directions within a distance of at least one mile.
(viii)
Title, date, scale, and north arrow. The date, scale, north arrow and title under which the plat is to be recorded, with the name, address, and phone number of the owner and surveyor platting the tract.
(b)
Planning and zoning commission.
The planning and zoning commission shall:
(d)
Effect of no decision.
If no decision is rendered by the planning and zoning commission within 30 days after the preliminary plat has been filed and the requirements of section 10.05.004, Application Completeness Review, have been satisfied, the preliminary plat, as submitted, shall be deemed to be approved.
(e)
Effect of approval.
(f)
Expiration and extension.
Preliminary approval will expire six months after the approval by the planning commission of the preliminary plat or of sections thereof. The applicant may apply in writing for an extension prior to the end of such six-month period. This period may be extended six months, but not beyond a total of one year.
(2000 Code, sec. 23-5; Ordinance adopting Code)