(a) Permit required.
A temporary use permit is required per section
14.12.007 for the approval of a temporary use.
(b) Standards.
The standards set out in table 14.04.004,
Temporary Use Standards, apply to all temporary uses set out in section
14.03.004,
Nonresidential Uses.Table 14.04.004. Temporary Use Standards |
|---|
Use | Location | Hours | Operational Requirements | Duration |
|---|
Asphalt/concrete batching plant (temporary) | Not less than 500 feet from any residential property. | 8:00 a.m. to 8:00 p.m. if within 1,000 feet of residential property; or 6:00 a.m. to 10:00 p.m. in all other locations. | The facility shall be used only for a project within the city limits. | Established by approval to coincide with the use of the facility for a specified construction project. Shall be removed immediately upon project completion. |
Construction buildings (temporary) | On lot or parcel proposed for development set back at least 10 feet from all lot lines. | Not limited, however, the building may not be used as a residence. | May be used by construction superintendent, construction workers, contractors, and other personnel on a construction team or as a security office. | Shall be removed prior to the issuance of a certificate of occupancy for the last building as detailed on the site plan. |
Construction dumpsters (temporary) | On lot or parcel using dumpster, set back at least 10 feet from the lot line, and placed on an improved hard surface. In nonresidential and mixed-use districts, dumpsters shall be located behind buildings (where possible) and shall not obstruct required parking lot requirements. | Not limited. | Refuse shall be contained within the dumpster, and shall be secured to prevent it from being removed from the dumpster by wind or wildlife. | If used for construction or renovation, may remain in place for one week after project completion. If used for another purpose, 10 days. |
Construction yard (temporary) | Only on a property zoned Light Industrial (LI) or Heavy Industrial (HI) | 7:00 a.m. to 10:00 p.m. | The facility shall be used only for a construction site within the city limits. | Established to coincide with the use of the facility for a specified construction project |
Model homes and on-site real estate offices | On lot or parcel proposed for development. | Not limited. | Sales limited to units located on the lot or parcel proposed for development; sales offices within model homes shall meet applicable building code criteria. | On-site real estate offices shall be removed upon completion of model home or suitable permanent floor area on-site; shall be removed by issuance of last certificate of occupancy for development. |
Public special events | The size of the site shall be large enough to accommodate the expected attendance in a manner that is safe for the site, neighborhood, street, or other infrastructure | 7:00 a.m. to 10:00 p.m. | A review of electric and lighting facilities for electrical code compliance and compliance with the standards for lighting prior to issuing a temporary use permit for the special event. | Shall not be held on a lot or parcel more than four times per calendar year, and shall be limited to no more than five consecutive days, not including set-up and tear-down. |
(Ordinance 19-3690 adopted 4/23/19)