(a)
No significant industrial user shall discharge wastewater to the POTW(s) without first obtaining a wastewater discharge permit from the director, except that a significant industrial user who has filed a timely application as required by section 13-2-191 of this division may continue to discharge for the time period specified therein.
(b)
The director may require a user to obtain a wastewater discharge permit if necessary to carry out the purposes and objectives of this division.
(c)
Any violation of the terms and conditions of an individual wastewater discharge permit shall be deemed a violation of this division and subjects the permittee to the sanctions contained in this division.
(Ordinance 2011-01, sec. 1, adopted 1/11/11)