(a)
Unless exempted by the director, users required to complete a wastewater discharge application and others determined necessary because of special conditions specified by the director shall provide sampling facilities of types and at locations approved by the director.
(b)
The sampling facilities must be designed to allow inspection, sampling, and flow measurement, if required, of the user’s specific discharges and must be provided and maintained in a safe and operational condition at the user’s expense. The sampling facilities must allow collection in accordance with the requirements of 40 CFR part 136 as amended.
(c)
Except in cases where the location is impractical or would cause undo hardship to the user, the sampling facilities shall be located on the user’s premises. In such cases, the city may allow the facility to be constructed on the sidewalk or public street provided that the location will not be obstructed in any manner.
(d)
Adequate room must be provided at or near the facility to allow accurate sampling and preparation of samples.
(e)
All sampling facilities shall be constructed in accordance with applicable local construction standards.
(f)
Construction of sampling facilities shall be completed within a time period designated by the director.
(g)
Failure to provide proper sampling facilities shall be grounds for denial of a permit and/or enforcement action, including denial of the right to discharge to the POTW(s).
(Ordinance 2011-01, sec. 1, adopted 1/11/11)