(a) Temporary use permits: $300.00.
(b) Zoning change: $750.00 up to 5 acres. $100.00 for each additional
5 acres.
(c) Planned unit developments (PUD): $2,750.00 up to 20 acres. 20 acres
or more $4,000.00 plus $100.00 for each additional acre or portion
thereof. *Max of $6,000.00.
(d) Planned unit development (PUD) amendment: 75% of regular planned
unit development (PUD) fee.
(e) Zoning variance: $400.00.
(f) Development agreements: $3,000.00. This development agreement fee
does not include the PID or MUD fee or the pass-through cost of the
legal review fees.
(g) Development agreement amendment: $1,500.00. The amendment fee does
not include the pass-through cost of the legal review fee.
(h) Form based code submittal: $500.00 up to 80 acres. $100.00 for each
additional 5 acres.
(i) Form based code amendment: 75% of regular form-based code submittal
fee.
(j) Annexation (voluntary): $500.00.
(k) Specific use permit: $500.00.
(l) Zoning verification letter: $50.00.**
(m) Minor Modification (historic district only): $500.00.
(n) Traffic impact analysis: $400.00 plus professional recovery fee (amount
invoiced by the traffic consultant hired by the city).**
(o) Technology fee: $25.00 except where indicated by.**
(p) Notices:
(1)
Published: $150.00. If the applicant requests postponement,
the applicant shall incur the costs of a new published notice(s).
(2)
Mailed: $1.00 per mailed notice.
(A)
For residential variances, the first fifty (50) notices are
included in the initial application fee. Any notices over fifty (50)
shall be $1.00 per notice.
(3)
On-site public hearing notification sign: $25.00 per sign.
(4)
Written notice of each public hearing before the planning and
zoning commission and/or city council shall adhere to the following
chart:
Procedure
|
Published
|
Mailed
|
Notification Distance
|
On-site Public Hearing Notification Signs Placed
|
Notice Posted on the City Website
|
---|
Planning Policy
|
Comprehensive plan text amendment
|
*
|
|
|
|
*
|
Comprehensive plan map amendment
|
*
|
|
|
|
*
|
Code amendment
|
*
|
|
|
|
*
|
Annexation
|
Voluntary
|
•
|
•
|
200 feet
|
|
•
|
Involuntary
|
•
|
•
|
200 feet
|
|
•
|
Zoning
|
Zoning application
|
•
|
•
|
600 feet*
|
•
|
•
|
PUD development plan/rezoning•
|
•
|
600 feet*
|
•
|
•
|
|
Specific use permit
|
•
|
•
|
600 feet*
|
•
|
•
|
Platting
|
Preliminary plat
|
•
|
•
|
200 feet
|
|
•
|
Replat
|
•
|
•
|
200 feet
|
|
•
|
Variances
|
Residential variance***
|
•
|
•
|
200 feet
|
•
|
•
|
Commercial variance
|
•
|
•
|
600 feet*
|
•
|
•
|
Historic preservation
|
Certificate of appropriateness
|
|
|
|
|
•
|
*
|
Any proposed building over four-stories shall require an additional
100 ft. distance per floor up to a maximum 1,000 ft. notification
distance.
|
(Ordinance O-2022-018 adopted 5/19/22; Ordinance O-2023-014 adopted 4/6/2023; Ordinance
O-2023-066 adopted 9/28/2023; Ordinance O-2023-079 adopted 12/14/2023; Ordinance
O-2024-005 adopted 2/15/2024)
(a) Administrative appeal (zoning board of adjustment): $500.00.**
(b) All other appeals (city council): $150.00.**
(Ordinance O-2022-018 adopted 5/19/22; Ordinance O-2023-014 adopted 4/6/2023; Ordinance
O-2023-066 adopted 9/28/2023; Ordinance O-2023-079 adopted 12/14/2023; Ordinance
O-2024-005 adopted 2/15/2024)
(a) Development assessment review: $1,100.00.
(b) Preliminary plat: $1,550.00 plus $25.00 per lot; plus $20.00 per
acre of right-of-way.
(c) Preliminary plat revision: 75% of regular major subdivision preliminary
plat fee.
(d) Final plat: $1,000.00 plus $25.00 per lot; plus $20.00 per acre of
right-of-way.
(f) Amended plat of subdivision: $500.00 plus $25.00 per lot.
(g) Plat recordation processing fee: $50.00 plus Williamson County plat
recordation fees.**
(h) Minor/short form final plat: $500.00.
(i) Right-of-way vacation/abandonment/license to encroach (public utility,
right-of-way and drainage easement): $250.00**. Requires amendment
plat.
(j) GIS fee: $25.00 per application unless otherwise stated herein. $25.00
per lot for preliminary plats, amended plats, and short form plats.**
(k) Subdivision public improvements/right-of-way construction inspection
fee:
(1)
First 100 acres: $1,500.00 per acre.
(2)
Next 150 acres: $750.00 per acre.
(3)
All additional acres over 250 acres: $325.00 per acre.
(4)
Off-site infrastructure: $7.50 per linear foot per infrastructure
item (i.e., streets, drainage, water, wastewater, etc.)
(l) Plan extension request (1-year extension): $250.00.**
(m) Subdivision public improvements/construction plan review:
(1)
Initial submittal:
(A)
First 100 acres: $500.00 per acre.
(B)
Next 150 acres: $250.00 per acre.
(C)
All additional acres over 250 acres: $125.00 per acre.
(D)
Off-site infrastructure: $2.50 per linear foot per infrastructure
item (i.e., streets, drainage, water, wastewater, etc.)
(2)
Resubmittal (each resubmittal): $500.00 or 10% of initial submittal
fee whichever is greater.
(n) Legal lot determination: $50.00.**
(o) Subdivision variance: $300.00.
(p) Traffic impact analysis: $400.00 plus professional recovery fee (amount
invoiced by the traffic consultant hired by the city).**
(q) Technology fee: $25.00 except where indicated by **.
(r) Service extension request application fees:
(1)
Request not requiring city participation: $200.00.
(2)
Request requiring city participation: $500.00.
(Ordinance O-2022-018 adopted 5/19/22; Ordinance O-2023-014 adopted 4/6/2023; Ordinance O-2023-079 adopted 12/14/2023; Ordinance O-2024-005 adopted 2/15/2024)
(a) Parkland fee-in-lieu of land dedication fees:
(1)
Residential: $2,300.00 per unit.
(2)
Nonresidential: $975.00 (minimum); $975.00 per acre for 3 or
more acres.
(b) SER review of water and wastewater fee:
(1)
Administration fee for SER review of water and wastewater: $300.00.
(2)
Water:
Tier
|
LUE Range
|
Corresponding Peak Hour Flow
|
Fee per SER
|
---|
Tier 1
|
0–149 LUE's
|
326 gpm (0.47 mgd)
|
$1,600.00
|
Tier 2
|
150–299 LUE's
|
654 gpm (0.94 mgd)
|
$2,460.00
|
Tier 3
|
300–899 LUE's
|
1,967 gpm (2.83 mgd)
|
$3,630.00
|
Tier 4
|
900–1,499 LUE's
|
3,297 gpm (4.72 mgd)
|
$5,320.00
|
Any development submitted to the city with a proposed LUE count
of 1,500 or above will require a separate project-specific SER review
fee negotiation
|
(3)
Wastewater:
Tier
|
LUE Range
|
Corresponding Peak Flow in Gravity Line*
|
Fee per SER
|
---|
Tier 1
|
0–149 LUE's
|
Up to 15% of 15-inch gravity line at minimum slope flowing full
|
$2,340.00
|
Tier 2
|
150–299 LUE's
|
Up to 15% of 21-inch gravity line at minimum slope flowing full
|
$3,690.00
|
Tier 3
|
300–899 LUE's
|
Up to 15% of 36-inch gravity line at minimum slope flowing full
|
$5,130.00
|
Tier 4
|
900–1,499 LUE's
|
N/A
|
$9,690.00
|
*Full pipe capacity calculated minimum slope as per the city
utility criteria manual (UCM). Peak flow calculated using peak wet
weather flow per the city UCM.
|
Any development submitted to the city with a proposed LUE count
of 1,500 or above will require a separate project-specific SER review
fee negotiation.
|
(4) Water LUE reservation: $70.00 per LUE per year.
(Ordinance O-2022-018 adopted 5/19/22; Ordinance O-2023-014 adopted 4/6/2023; Ordinance
O-2023-066 adopted 9/28/2023; Ordinance O-2023-079 adopted 12/14/2023; Ordinance
O-2024-003 adopted 1/18/2024; Ordinance O-2024-005 adopted 2/15/2024)
(a) Site plan review fee: $1,000.00 plus $100.00 per acre. A resubmittal
fee of 25% of the original fee is due at the third submittal for the
project, 33% of the original fee at the fourth submittal, and 50%
of the original fee for any review after the fourth submittal.
(1)
Site plan revision:
Half of the original site
plan fee for the project.
(b) Site inspection fee: $200.00 plus $0.05/sq. ft. for impervious cover.
(c) Site inspection fee (public improvements only): $7.50 per linear
foot per infrastructure items (i.e., streets, drainage, water, wastewater,
etc.)
(d) Minor deviations/design modifications: $200.00 plus $0.05/sq. ft.
for impervious cover.
(e)
Fire review fees:
Fire review fees shall be established
by the Williamson County Emergency Services District No. 3.
(f) Clearing and grading permit fees:
(1)
Application fee: $100.00.
(g) Regional stormwater management fees:
(1)
Single-family: $1,600.00 per acre.
(2)
Multifamily: $3,200.00 per acre.
(3)
Commercial/industrial: $4,800.00 per acre.
(Ordinance O-2022-018 adopted 5/19/22; Ordinance O-2023-014 adopted 4/6/2023; Ordinance
O-2023-046 adopted 8/17/2023; Ordinance O-2023-057 adopted 9/7/2023; Ordinance O-2023-066 adopted 9/28/2023; Ordinance
O-2023-079 adopted 12/14/2023; Ordinance O-2024-005 adopted 2/15/2024)
Building plan review fees:
(1) New residential building permit fee: $1,600.00 flat fee.
(2) Residential addition/remodel building permit fee: $75.00.
(3) Commercial: 65% of commercial permit fee. Required for all new commercial
construction and commercial addition permits.
(4)
Building permit revisions:
Professional recovery
fee (amount invoiced by the third-party consultant).
(5) Certificate of appropriateness (historic district only):
(B)
Major projects (i.e., new construction): $250.00.
(6) Master plan submittal: $500.00 per new home plan compliance review.
(Ordinance O-2022-018 adopted 5/19/22; Ordinance O-2023-014 adopted 4/6/2023; Ordinance O-2023-066 adopted 9/28/2023; Ordinance O-2023-079 adopted 12/14/2023; Ordinance O-2024-005 adopted 2/15/2024)
(a)
Payment.
Fees for building permits double if work
on the project begins prior to issuance of the permit. All permit
fees are to be paid in advance by the licensed party who applies for
the permit. Building valuation is determined by the International
Code Council (ICC) Building Valuation Data Table (BVD). This calculation
takes the total square feet of a structure multiplied by the amount
found on the BVD table for the building group and construction type.
(b)
New commercial/residential addition/commercial addition/commercial
remodel permit fees:
Includes required inspections. Reinspection
are an additional fee. All fees are based on the most recent ICC valuation
table.
(1)
Inspection/reinspection: $85.00 residential and $100.00 commercial/multifamily
(each inspection). After 3rd failed inspection, must wait 2 business
days for reinspection.
(A)
MedGas inspection: $250.00 per inspection.
(2)
Technology fee:
(A)
Residential building permit: $10.00.
(B)
Commercial building permit: $20.00.
(c)
Miscellaneous permits/inspections by type:
(1)
Technology fee: $7.00 for all miscellaneous permits, except
where indicated by.**
(2)
Move-in permit fee (modular structure): $150.00.
(4)
Storage building permit: $50.00 review fee, if over 200 square
feet $100.00, plus required inspection(s). Reinspection are an additional
fee.
(5)
Water softener, water heater, irrigation, spa, hot tub, HVAC,
solar panel, and wind turbine permits: $50.00, plus required inspection(s)
fees. Reinspection are an additional fee.
(6)
Pool permit (in ground): $25.00 review fee, plus $0.10 per square
foot if over 200 square feet, plus required inspection(s) fees. Reinspection
are an additional fee.
(7)
Pool permit (above ground, over 24" tall): $25.00 review fee,
plus $0.10 per square foot if over 200 square feet, plus required
inspection(s) fees. Reinspection are an additional fee.
(8)
Patio/deck permit: $50.00 review fee, if over 200 square feet
$100.00, plus required inspection(s) fees. Reinspection are an additional
fee.
(9)
Fire safety inspection:
Fire safety inspection
for commercial buildings is set by Williamson County Emergency Services
District No. 3.
(10)
Tree removal permit:**
(A)
Undeveloped or redevelopment site:
(i) Trees with a DBH of at least 6", regardless of
health: Permit required; no fee.
(ii) Nuisance, diseased, dangerous or dead trees: No
permit required; no fee.
(B)
Developed site:
(i) Trees with a DBH of at least 2.5", regardless of
health: Permit required; no fee.
(ii) Nuisance, diseased, dangerous or dead trees: No
permit required; no fee.
(11)
HUD-code manufactured home fees:
(A)
Permit application fee: $100.00.
(B)
License application or renewal fees: $50.00.
(C)
License transfer fee: $50.00.
(12)
Sign permits:
(A)
Regular signs (on buildings or freestanding):
(i) Signs meeting code requirements, fee due upon application:
$5.00 per square foot of facing.
(ii) Sign master plan application fee: $100.00.
(B)
Signs requiring variances:
(ii) If variance approved: $15.00 per square foot of
facing.
(iii) If variance approved for sign master plan: $10.00
per square foot of facing.
(C)
Temporary signs:
(i) Temporary commercial signage, per sign: $50.00.
(ii) A-frame sign: $30.00 (1 year).
(iii) Public information sign: Permit required; no
fee.**
(iv) Political sign: No permit required; no fee.**
(13) Certificate of occupancy (change of commercial tenant or ownership):
$50.00 plus inspection fee.
(14)
Temporary certificate of occupancy: $250.00 per issuance.
(15)
Occupation of a structure prior to issuance of a certificate
of occupancy: $100.00 per day of occupancy prior to issuance of a
certificate of occupancy.
(16)
Temporary job/construction trailer: $30.00.
(17)
Remodel-residential: $50.00 plus required inspection(s) fees.
Reinspection are an additional fee.
(18)
Inspection for habitable dwelling. Building or home 5 years
or older: $100.00.
(19)
All inspections and reinspection not listed above: $85.00 each
residential and $100.00 each commercial.** After 3rd failed inspection,
must wait 2 business days for reinspection and reinspection is $100.00
for residential and $125.00 for commercial.
(20)
Building and standards application: $500.00 plus professional
recovery fee (amount invoiced by the building consultant if required
and hired by the city).
(Ordinance O-2022-018 adopted 5/19/22; Ordinance O-2023-014 adopted 4/6/2023; Ordinance O-2023-066 adopted 9/28/2023; Ordinance O-2023-079 adopted 12/14/2023; Ordinance O-2024-005 adopted 2/15/2024)
(a)
Printed map products:
(1)
Black and white or color map:
(3)
Postage: $4.00 depending on additional postage fees.
(5)
As-built plans (24" x 36"): $10.00.
(b)
GIS/CD/e-mail products:
(5)
Postage: $4.00 depending on additional postage fees.
(7)
Aerial:
(A)
Individual panels (per panel): $35.00.
(8)
As-built plans (electronic): $25.00.
(c)
GIS custom maps:
GIS is not authorized to prepare
custom maps. However, should the preparation of a custom map be authorized
by the planning director, the customer will be charged on a per-hour
basis. $75.00 for the first hour, $35.00 for each additional hour.
(Ordinance O-2022-018 adopted 5/19/22; Ordinance O-2023-014 adopted 4/6/2023; Ordinance O-2023-066 adopted 9/28/2023; Ordinance O-2023-079 adopted 12/14/2023; Ordinance O-2024-005 adopted 2/15/2024)
(a)
Application fees:
The application fees shall be
assessed on the number of node support poles and/or network nodes
contained in an application for installation at the following rates:
(1)
Five hundred dollars ($500.00) per application. This amount
will cover applications covering up to five network nodes;
(2)
For applications with more than five network nodes, there shall
be an additional two hundred and fifty dollars ($250.00) fee for each
additional network node (limit of 30 nodes total); and
(3)
One thousand dollars ($1,000.00) per application for each node
support pole.
(b)
Rent from network providers:
(1)
Network nodes:
The annual network node site rental
rate as set in chapter 284 sec. 284.053, Tex. Loc. Gov. Code, shall
be $250.00 per network node, with annual CPI adjustment as provided
for in chapter 284, section 284.054.
(2)
Poles:
Chapter 284, section 284.053 does not provide
a separate rate for poles.
(3)
Transport facility:
The annual transport facility
rental rate as set in chapter 284 section 284.055 shall be $28.00
monthly for each network node, unless an equal or greater amount is
paid the city, e.g., under chapter 283, Tex. Loc. Gov. Code or chapter
66, Tex. Util. Code.
(c)
Annual collocation on service pole attachment fee:
Twenty dollars ($20.00) per network node permitted to be collocated
on a city service pole.
(Ordinance O-2022-018 adopted 5/19/22; Ordinance O-2023-014 adopted 4/6/2023; Ordinance O-2023-066 adopted 9/28/2023; Ordinance O-2023-079 adopted 12/14/2023; Ordinance O-2024-005 adopted 2/15/2024)
(a) Right-of-way license and use agreement: The fees listed below are
in effect once entering into the use agreement with the city per the
right-of-way fee ordinance: Fees for plan review and construction
plans submitted by company determined by the public works director
or pursuant to the city right-of-way fee ordinance.
(b) Initial submittal off-site infrastructure: $2.50 per linear foot
per infrastructure item (i.e., streets, drainage, water, wastewater,
fiberoptic, etc.).
(c) Resubmittal (each resubmittal): $500.00 or 10% of initial submittal
fee whichever is greater.
(d) Five percent (5%) of the gross revenues for the related facility
in the public right-of-way area ("use fee").
(e) Deposit cash or post bond in lieu thereof with the city the sum of
fifty thousand dollars ($50,000.00) to be used in the event company
fails to close said street within a reasonable time to a condition
satisfactory to the public works director's office within the
time specified.
(1)
Public service provider/right-of-way contractor registration
fee.
(2)
One-year registration: $100.00.
(3)
Two-year registration: $175.00.
(Ordinance O-2023-079 adopted 12/14/2023; Ordinance O-2024-005 adopted 2/15/2024)