(a) 
Security deposit: $150.00.
(b) 
Commercial electrical deposit: 2 x estimated monthly bill.
(c) 
Connect/transfer fee: $20.00.
(d) 
New account charges: $20.00.
(e) 
New service charge: $30.00.
(f) 
Nonpay reconnect charge: $20.00 during regular business hours (7:30 a.m. to 4:00 p.m., Monday through Friday).
(g) 
Reconnecting on weekends, holidays and after hours: $40.00.
(h) 
Temporary overhead connection charge: $20.00 plus consumption.
(i) 
Short-term service charge (Mon–Fri): $20.00.
(j) 
Request meter test: $50.00.
(k) 
Delinquent bill collection charge: 10% of outstanding bill.
(l) 
Theft of service: $200.00.
(m) 
Returned check or bank draft charge: $35.00.
(n) 
Emergency call out fee: $150.00.
(o) 
New transformer charge: Total cost incurred.
(p) 
Fused cut-out: $150.00.
(q) 
Utility pole plus 300' of line extension: $750.00.
(Ordinance 2022-01 adopted 5/10/22; Ordinance 2023-04 adopted 4/11/2023; Ordinance 2023-08 adopted 8/22/2023; Ordinance 2023-16 adopted 11/14/2023; Ordinance 2024-02 adopted 3/12/2024)
(a) 
Residential.
(1) 
Customer charge: $17.55.
(2) 
Distribution energy charge per kWh: $0.0455/per kWh.
(3) 
Plus power cost recovery factor.
(b) 
Small general service.
(1) 
Customer charge: $18.05.
(2) 
Distribution energy charge per kWh: $0.0417.
(3) 
Plus power cost recovery factor.
(c) 
Medium general service.
(1) 
Customer charge: $50.55.
(2) 
Plus a demand charge: $6.76.
(3) 
Plus an energy charge: $0.028.
(4) 
Plus power cost recovery factor.
(d) 
Large general service.
(1) 
Customer charge: $86.55.
(2) 
Plus a demand charge: $8.06.
(3) 
Plus an energy charge: $0.022.
(4) 
Plus power cost recovery factor.
(e) 
Park service.
(1) 
Replacement charge: Bulbs as used.
(2) 
Customer charge: $7.50.
(3) 
Energy charge: $0.03230.
(4) 
Plus power cost recovery factor.
(f) 
Municipal pumping service.
(1) 
Energy charge: $0.05304.
(2) 
Plus power cost recovery factor.
(g) 
Irrigation service.
(1) 
Customer charge: $14.55.
(2) 
Energy charge: $0.03419.
(3) 
Plus power cost recovery factor.
(h) 
Area lighting.
(1) 
Power under this schedule is available for service to one hundred seventy-five (175) watt maximum security light installed and maintained by the city for customers at their request.
(2) 
Monthly rate: Customer charge: 100-watt mercury vapor: $5.86.
(i) 
Street lighting and traffic signals.
Lamp Type and Wattage
Nominal Lumen Output
Estimated KWH per Lamp per Month
Unmetered Charge per Lamp per Month
High pressure sodium vapor
 
 
 
400 and 1,000 watt
 
180
$13.50
100 watt
9,500
40
$7.50
250 watt
22,500
102
N/A
Incandescent (existing)
 
 
 
All
N/A
100
$5.34
Traffic signals
 
 
 
All
0.04718 per KWH for all energy used
(Ordinance 2022-01 adopted 5/10/22; Ordinance 2023-04 adopted 4/11/2023; Ordinance 2023-08 adopted 8/22/2023; Ordinance 2023-16 adopted 11/14/2023; Ordinance 2024-02 adopted 3/12/2024)