(a)
New construction fees.
Permit Classification | Review Fee | Permit Fee | Minimum Permit Fee |
|---|---|---|---|
New work residential | $300.00 nonrefundable plan review fee | $1.86/sq. ft. under roof | NA |
New work nonresidential | $200.00 nonrefundable plan review fee | 1.1% of valuation | $500.00 |
(b)
Additions, alterations, and remodel and accessory structures fees.
Permit Classification | Review Fee | Permit Fee | Minimum Permit Fee |
|---|---|---|---|
Residential addition/remodel and accessory structures | $200.00 nonrefundable plan review fee | $1.21/sq. ft. under roof area affected | $500.00 |
Nonresidential addition/remodel and accessory structures | $200.00 nonrefundable plan review fee | 0.75% of valuation | $500.00 |
(c)
Demolition fees.
Permit Classification | Review Fee | Permit Fee | Minimum Permit Fee |
|---|---|---|---|
Residential demolition | N/A | $250.00 | $250.00 |
Nonresidential demolition | N/A | $500.00 | $500.00 |
(d)
Plan review fee.
The fee to perform plan review shall be as listed in the table unless a third-party consultant is engaged for plan review services. Applicant shall pay the cost of the consultant’s fee for plan review services.
(e)
Plan review addendum fees.
(1)
Application fee for permit addendum: The fee to addend a submitted plan application shall be $50.00 (fifty dollars), which shall include the first 30 minutes of staff review time.
(2)
For staff plan review time in excess of 30 minutes, $50.00 (fifty dollars) per hour shall be charged. The charge may be prorated in 30-minute increments.
(f)
Miscellaneous fees.
Permit Classification | Review Fee | Permit Fee | Minimum Permit Fee |
|---|---|---|---|
Addition, remodel, repair nonresidential | N/A | 2% of valuation | $300.00 |
Re-roof residential | N/A | $200.00 | $200.00 |
Re-roof commercial | N/A | 2% of valuation | $300.00 |
ROW/concrete flatwork | N/A | $200.00 | $200.00 |
Stop-work fee | N/A | $300.00 | $300.00 |
Temporary trailer/box | N/A | $200.00 | $200.00 |
Special event permit | N/A | $200.00 | $200.00 |
Miscellaneous | N/A | $200.00 | $200.00 |
(g)
New permit required.
A new permit must be obtained for any construction which is not completed in the allowable time period or extended. A new fee shall be required in connection with issuance of a new permit. The new fee shall be one-half the amount required for the original permit for such work, provided no changes have been made or will be made in the original plans and specifications for such work. A new permit must be obtained for any construction which has been suspended or abandoned for a period of more than 60 days. The permittee shall make a new application, resubmit plans for review, and pay a new full permit fee to resume work.
(h)
Work without a permit - investigation fee.
An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is subsequently issued. The investigation fee in fee schedule shall be equal to the amount of the permit fee required by the master fee resolution as applicable.
(Resolution 17/002 adopted 2/7/17; Resolution 19/005 adopted 6/4/19; Resolution 20-002 adopted 2/18/20; Resolution 21-015 adopted 9/21/21; Resolution 23-002 adopted 2/7/2023; Ordinance 25-024 adopted 9/16/2025)