The following criteria shall be used to determine whether the application for a Final Plat shall be approved or denied:
(A) Final Plat with Prior Approved Preliminary Plat:
(1) The Final Plat conforms to the approved Preliminary Plat (as may have been amended);
(2) The Site Engineering Drawings conform to the requirements of Article 6, Division
1 of this Chapter
3, specifically, and Articles 3, 4 and 5 [Articles 4, 5 and 6] of this Chapter
3, generally, and have been approved by the Director of Engineering;
(3) Where public improvements have been installed, the improvements conform to the approved Site Engineering Drawings and have been approved for acceptance by the Director of Engineering;
(4) Where public improvements have been deferred, a Subdivision Improvement Agreement has been executed in conformity with Article 6, Division 3 of this Chapter
3;
(5) The final layout of the development meets all standards for adequacy of public facilities contained in this GDC;
(6) All required easements, the design of all lots, and the provision of required monumentation are in accordance with Article 5, Division
12 of this Chapter
3;
(7) The Final Plat meets all applicable county standards, when the proposed development is located in whole or in part in the extraterritorial jurisdiction of the City and in the county;
(8) The Final Plat conforms to design requirements and construction standards as set forth in the Technical Standards, as amended;
(9) The Final Plat conforms with applicable criteria and checklist(s) in the City’s Development Application Packet, as amended, and as may have been provided to the applicant through the Planning Department; and
(10) The first phase, and each subsequent phase, of a phased development is capable of being developed and fully functional independent of any other phase and in full conformance with the City’s Technical Standards.
(B) Final Plat with no Prior Approved Preliminary Plat:
(1) The Final Plat conforms to all criteria for approval of a Preliminary Plat (as if one had been required, see Section
3.10 of this Chapter
3); and
(2) The Subdivision Improvement Agreement, if applicable, has been approved by the Director of Engineering and executed in conformity with Article 6, Division 3 of this Chapter.
(Ordinance 6773 adopted 5/19/15; Ordinance 7107, sec. 41, adopted 12/3/19)