(A)
Purpose.
The purpose of a Conveyance Plat is to provide a mechanism for land to be divided into lots or to dedicate public right-of-way, when such subdivision of the land is for conveyance (sale or inheritance) purposes only. This type of plat is appropriate when no immediate development is contemplated; when or if development does occur, then the land shall be properly platted in the form of a Final Plat (with or without approval of a Preliminary Plat, as applicable) prior to any type of development, construction activities, or further subdivision of the land.
(B)
Applicability.
A Conveyance Plat may be used in lieu of a Final Plat to record the subdivision of property in the following instances:
(1)
To record the remainder of a tract that is created by a Final Plat of a portion of the property, provided that the remainder is not intended for immediate development.
(2)
To record the subdivision of property into lots, all of which are not intended for immediate development, provided minimum frontage requirements for all lots (as applicable) are met, and provided all lots have access in accordance with Section 3.33 of this Chapter 3. All public rights-of-way required by the City under this GDC (if any) shall be shown on, and dedicated by, a Conveyance Plat in accordance with Section 3.33, but the actual improvement of existing streets, and construction of any required new streets, may be deferred until development and further platting of the property shown on a Conveyance Plat.
(C)
Subsequent Filing of a Final Plat.
No Final Plat processed and approved in association with a Conveyance Plat shall be approved or filed for record at the applicable county without the concurrent (or prior) approval and recording of the associated Conveyance Plat for the remainder of the subject property. Both plats shall be submitted, reviewed, considered for approval, and filed for record at the county as separate plat drawings (that is, not combined into a single plat drawing).
(D)
Final Plat Required for Permits & Services.
No Site Permit or Building Permit shall be issued, nor permanent utility service provided, for land that has only received approval as a Conveyance Plat. A Final Plat shall be approved and recorded with the applicable county, in accordance with Division 3 of Article 2 of this Chapter 3, prior to issuance of any Site Permit, Building Permit or initiation of utility service.
(Ordinance 6773 adopted 5/19/15; Ordinance 7107, sec. 43, adopted 12/3/19; Ordinance 7573 adopted 3/4/2025)