(A)
Intent & Purpose.
The intent and purpose of this Division 4 is to provide an equitable charge for water and wastewater connections as a proportionate distribution of the capital cost of water and wastewater main extensions to serve property in the City on a front-foot basis.
(B)
Director of Engineering Determination.
If a tract of land is so situated or shaped that the front-foot rule creates an inequitable basis between the tract and other land in the City, then the Director of Engineering shall determine the proper charges in accord with the intent and purpose of this Division 4.
(Ordinance 6773 adopted 5/19/15)