(A)
Type, Size, and Location.
If not otherwise specified within this GDC, the type, size, and location of easements shall be determined by the City’s Technical Standards Manual and the Director of Engineering. The location of utility easements shall be in accordance with Division 3 of this Article 5.
(B)
Maintenance.
Any easements established shall be maintained by the property owner unless otherwise stated on the plat or in the specified language on a separate instrument.
(C)
Designated on Plat.
For new development and redevelopment, all necessary on-site easements shall be established on the Preliminary Plat, Final Plat or Replat, and not by separate instrument except as permitted by the City’s Technical Standards Manual. Easements that were previously established and recorded as separate instruments shall be shown on the Plat with correct filing information before Plan Commission’s consideration of the plat. Easements shall be labeled on the plat and labeled for the specific purpose for which they are being provided. Examples include a City Utility Easement (CUE) (not simply a “utility” easement which would allow franchise utilities in City easements), or a drainage easement, or an access easement.
(D)
Lot Area in Relation to Easements.
The area of a lot shall be computed inclusive of all required public and utility easements.
(E)
Easements for Utility Providers.
The applicant is responsible for contacting all utility providers prior to submission of a plat application or Site Engineering Drawings, whichever occurs first, and for securing all necessary easements for same prior to Final Plat approval and recordation. The applicant shall provide the Director of Engineering with written certification that all necessary utility providers have been notified, and such secured easements shall be shown on the Final Plat with the recording information for each.
(F)
Off-Site Easements.
All necessary off-site easements required for installation of required off-site public improvements to serve the development shall be acquired by the applicant prior to approval and recordation of the Final Plat. Off-site easements shall be conveyed and recorded at the applicable county by an instrument approved by the City, and shall be shown on the Final Plat along with the recording information for each.
(Ordinance 6773 adopted 5/19/15; Ordinance 7055, sec. 29, adopted 5/7/19)