For the purposes of this article the following words, terms and phrases shall have the meaning given herein.
The City of Lavon, Texas.
The residents and/or businesses utilizing and paying the city for wastewater services.
The person, business, partnership, corporation or association responsible for the development of a subdivision or lot and includes the property owner or subdivider.
Any manmade change to improved or unimproved real estate, including but not limited to construction of buildings or other structures, which results in demand for wastewater facilities and which requires connection to the city’s wastewater system.
The design specifications designated by the city as standards for construction on all public infrastructure constructed in the city including the city standard construction details and NCTCOG “standard specifications for public works construction.”
A tract, plot or portion of a subdivision, addition or other parcel of land intended as a unit for the purpose, whether immediate or future, of transfer of ownership or possession, or for development.
A wastewater main required to interconnect property being developed with the existing wastewater system which exceeds the standard size pipeline required for the developed property.
A charge made against an existing lot abutting a wastewater main that is the average per foot cost of the line, multiplied by the front footage of the land, and that is imposed to reimburse the original developer his cost of installing or paying for the main. means a charge made to a lot or tract requesting sanitary sewer service in an existing wastewater main that is a proportional amount of the actual costs of construction of said wastewater main that is payable to the original developer that funded said wastewater main.
The portion, in percent, of the wastewater main total design capacity utilized by the development requesting sanitary sewer service.
The record titleholder of a premises connected to the city’s wastewater system.
Has the meaning given that term in the city’s subdivision regulations.
Has the meaning given that term in the city’s subdivision regulations.
The total amount of anticipated wastewater to be conveyed by a wastewater main (pressure or non-pressure) used in design of said wastewater main. This is used in determination of proportional amount.
The calculated capacity of a pipeline. This is not used in determination of proportional amount.