For a project where a SWP3 is required to be prepared and implemented by the Contractor, all methods, materials and equipment used to prevent storm water pollution shall be the sole responsibility of the Contractor. Typical drawings and notes may be shown on the plans and/or in this specification and may include locations or types of typical structural controls such as silt fencing, sedimentation basins, straw bales, rock berms, and other methods for preventing storm water pollution prevention. The typical drawings and notes that may be shown shall be considered as methods that may be selected for use by the Contractor. Nothing shown on drawings or described in the specifications for this project relieves the Contractor from sole responsibility for preventing storm water pollution in accordance with the applicable laws and regulations. Alternate or additional methods, materials and equipment may be developed and used by Contractor to prevent storm water pollution. Any alternate or additional methods, materials and equipment shall be detailed in the SWP3 that is to be prepared by the Contractor and submitted to the City of Magnolia and Engineer.
(Ordinance 2007-106, App. B, adopted 3/20/07)