(Ordinance 2007-106, App. B, adopted 3/20/07)
Contractor has sole responsibility for providing an adequate excavation safety system. The Contractor agrees that neither the City of Magnolia, the Engineer, or the designated representative of the Engineer has such responsibility for providing or verifying an adequate excavation safety system. The Contractor shall not rely on the City of Magnolia nor any of their representatives for inspection, design, supervision, construction or any other aspect of excavation safety.