Add not less than 1-1/2 sacks of Portland cement to stabilize one cubic yard (1 cu.yd.) of sand mixture. Mix thoroughly in an approved pug-mill type mixer or by another method specifically approved by the Engineer or the designated representative of the Engineer. Batch tickets shall be stamped with the time of loading.
(Ordinance 2007-106, App. B, adopted 3/20/07)