The Contractor shall maintain the cement stabilized material in good condition until all work has been completed and accepted. Maintenance shall include immediate repairs of any defects that may occur. This work shall be repeated as often as necessary and at the expense of the Contractor. Faulty work shall be replaced for the full depth of treatment. The Contractor shall construct the plan depth of cement stabilization in one homogeneous mass, so the addition of thin stabilized layers will not be permitted in order to provide the minimum specified depth.
(Ordinance 2007-106, App. B, adopted 3/20/07)