Prior to placing any pavement, manhole frames and covers, valve boxes, and other such utility access structures shall be adjusted in elevation by the Contractor if needed to match the surface of the new pavement. For overlaying existing pavement, cast iron or ductile iron extensions rated for not less than H-20 loading of a manufacturer and model approved by the Engineer or the designated representative of the Engineer may be used. For other than overlaying of existing pavement, the Contractor shall adjust the height of manhole frames and covers, valve boxes, and other such utility access in a manner acceptable to the Engineer or the designated representative of the Engineer to the grades required for the new pavement.
The area to be treated shall be cleaned by sweeping or other methods approved by the Engineer or the designated representative of the Engineer. Edges of existing pavement to be surfaced shall be bladed to remove vegetation. Pot holes shall be filled with hot mix/cold laid asphalt at the direction of the Engineer or the designated representative of the Engineer. All rate of application and pressure gauges will be inspected and calibrated prior to applying the asphalt cement.
(Ordinance 2007-106, App. B, adopted 3/20/07)