A.
General.
In addition to any instructions specified herein, the preparations detailed in Section 03300, Cast-In-Place Concrete, paragraph 3.01, shall also apply here as if written in their entirety. This includes, but is not limited to, the minimum twenty-four (24) hour notification that shall be given to the Engineer or the designated representative of the Engineer before any concrete is placed.
B.
Subgrade Preparation and Protection.
Excavate, prepare, shape, and compact the subgrade to the grades and densities shown on the plans and in accordance with Section 02223, Excavating, Backfilling, and Compacting for Pavement. Subgrade shall be wetted sufficiently to minimize moisture loss from the concrete to the subgrade. Water puddles or muddy areas will not be allowed. Maintain the subgrade in a smooth, compacted condition at the proper grades until the concrete has been placed. No ready mix trucks or other equipment shall be allowed to operate within the forms unless clearance or other job conditions will not allow operation from outside the forms. If trucks must operate between the forms, the subgrade shall be protected from damage by use of runways. Any ruts or irregularities in the subgrade caused by equipment or by trucking material shall be corrected by second rolling or hand tamping.
(Ordinance 2007-106, App. B, adopted 3/20/07)