Each water well drilled, constructed, repaired, capped or plugged, each water well pump installed or repaired, and any facilities connected to or associated with a water well or pump constructed or altered shall be done so in conformance with all relevant city code provisions, including but not limited to section
94-2; building, plumbing and electrical codes adopted by the city in article V of chapter
14 of the Code of Ordinances. Any plan review, approval, permit and inspection requirements under these relevant code provisions are applicable to each water well or water well pump related project.
(Ordinance O-2019-002, sec. 4(exh. A), adopted 1/8/19)