[Ord. No. 4-2022, 9/19/2022]
1.
Approval of an SWM site plan is required for any of the activities regulated by this Part. Following approval by the Township, the SWM site plan and stormwater management BMP operations and maintenance agreement shall be recorded in accordance with § 26-247 prior to the issuance of any zoning or building permits or commencement of any land disturbance activity.
2.
Preliminary or final approval of subdivision and/or land development plans shall be contingent upon approval of the SWM site plan unless an SWM site plan is specifically exempted.
3.
All SWM site plans shall be designed and certified by individuals registered in the Commonwealth of Pennsylvania and qualified to perform such duties based on education and training.
4.
Plans which require access to, propose construction of and/or connection to stormwater management facilities or in any other way require the approval for activities within any street or highway under the jurisdiction of the PA Department of Transportation shall include two copies of the plans prepared to support the application for a highway occupancy permit.
5.
Following approval, the SWM site plan shall be submitted in portable document format (PDF) and a GIS-compatible format that is acceptable to the Township.