Subgrade stabilization must be six inches thick with hydrated lime. This shall be spread uniformly and sprinkled to the proper moisture content. The soil, lime and water shall be mixed until a homogenous product is obtained that is free of clods and lumps. The mixture shall be immediately rolled and compacted to 95 percent of standard proctor density.
(Ordinance 91-1, sec. 2, adopted 1/13/92; 2007 Code, sec. 66-42)