(a)
New water service.
New water service at a location where there is an existing metering device requires a deposit of ninety dollars ($90.00) plus a processing fee of ten dollars ($10.00). New water service where there is no existing service tap shall have a minimum charge of one hundred fifty dollars ($150.00) for three-quarter inch (3/4") line and three hundred dollars ($300.00) for one inch (1") line.
(b)
New sewer service.
Minimum charge of two hundred dollars ($200.00). If a “street cut” is required, an additional charge of two hundred dollars ($200.00) will be added to the connection service.
(Ordinance 20-11-09-b, sec. 3, adopted 11/16/20)