Expose all underground utilities which may be in conflict with proposed sanitary sewer lines prior to installing new lines. If faults, caverns or subsidence are discovered during construction, halt work to allow features to be inspected by the Engineer or the designated representative of the Engineer. Construction may only be resumed with approval of Engineer or the designated representative of the Engineer.
(Ordinance 2007-106, App. B, adopted 3/20/07)