Hydromulching shall consist of preparing the ground, furnishing and applying the fertilizer, seed, mulch cover, emulsified asphalt and water on all areas indicated on the plans or as designated by the City of Magnolia Engineer or the designated representative of the Engineer. The mulch, fertilizer, and seed may be incorporated into one (1) operation, or if the Contractor so elects, the fertilizer may be applied during preparation of the seed bed at the rate of four hundred (400) pounds per acre.
(Ordinance 2007-106, App. B, adopted 3/20/07)
The cost for performing the hydromulch seeding requirements set forth herein shall be included in related items of work unless specifically shown otherwise on the Bid Form.
(Ordinance 2007-106, App. B, adopted 3/20/07)