This specification describes the requirements for the seeding, application of fertilizer, and other management practices to establish ground cover in areas as shown on the plans and as designated in the specifications.
(Ordinance 2007-106, App. B, adopted 3/20/07)
The cost for performing the seeding requirements set forth herein shall be included in related items of work unless specifically shown otherwise on the Bid Form. Provide all materials, equipment, tools, labor, superintendence, maintenance, and incidentals as required to complete the work.
(Ordinance 2007-106, App. B, adopted 3/20/07)
A tag with written certification of guaranteed product content shall be attached to the product bags or containers, or a separate written certification of guaranteed product content shall be provided by the product supplier or manufacturer.
(Ordinance 2007-106, App. B, adopted 3/20/07)
All materials shall be transported, stored, and handled according to the written recommendation of the manufacturer or supplier.
(Ordinance 2007-106, App. B, adopted 3/20/07)