This specification describes the requirements for providing and planting St. Augustine grass or other acceptable sod along or across such areas as designated on the plans and in accordance with specification requirements herein outlined.
(Ordinance 2007-106, App. B, adopted 3/20/07)
The cost for performing the sodding requirements set forth herein shall be included in related items of work unless specifically shown otherwise on the Bid Form. Provide all materials, equipment, tools, labor, superintendence, maintenance, and incidentals as required to complete the work.
(Ordinance 2007-106, App. B, adopted 3/20/07)
Care shall be taken at all times to retain the native soil on the roots of the sod during the process of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug until planted. When so directed by the City of Magnolia, Engineer or the designated representative of the Engineer, the sod existing at the sources shall be watered to the extent required prior to excavating.
(Ordinance 2007-106, App. B, adopted 3/20/07)