A.
General.
Mix concrete only in quantities for immediate use and discard any concrete that has set or is not completely discharged at the site within the maximum time allowed for placement. Retempering of any set concrete is strictly prohibited. When concrete arrived at the project with a slump below that specified, water may be added only if neither the maximum permissible water-cement ratio or the maximum slump is exceeded. The water shall be incorporated by additional mixing equal to at least half of the total mixing required.
B.
Notification.
The placement of concrete without the prior approval of the Engineer or designated representative of the Engineer is strictly prohibited. The Contractor shall notify the Engineer or designated representative of the Engineer a minimum of twenty-four (24) hours before placing concrete.
C.
Protection from Adverse Weather.
Unless adequate protection is provided, or approval is obtained, do not place concrete during rain, sleet, snow or freezing weather. Do not permit rainwater to increase the amount of mixing water or to damage the surface finish. If rainfall occurs after placing operations begin, provide adequate covering to protect the work from any adverse damage.
D.
Placing Temperatures.
All concrete shall be placed in accordance with the following provisions:
1.
Cold Weather Placement.
Unless special provisions are made for heating the concrete mix and the concrete in forms, do not place any concrete when the air temperature is below 40° F or is predicted to be below 40° F within forty-eight (48) hours of placement.
2.
Hot Weather Placement.
When the air temperature is above 85°F, use an approved retarding agent in all concrete. Concrete temperature prior to placement shall not exceed 95° F.
E.
Maximum Time to Placement.
Any concrete that has attained its initial set or has contained its mixing water or cement for more than forty-five (45) minutes shall not be placed in the work. The addition of an approved retarding agent may be proposed by the Contractor to increase the maximum time to placement. The increase of time to placement shall be proposed the Contractor and approved by the Engineer or designated representative of the Engineer when the design mix is submitted for approval.
(Ordinance 2007-106, App. B, adopted 3/20/07)