Provider shall, at its own cost and expense, install the network nodes and node support poles in a good and workmanlike manner and in accordance with the requirements promulgated by the wireless services design manual, “right-of-way management” ordinance, the public right-of-way permitting and construction manual and all other applicable laws, ordinances, codes, rules and regulations of the town, the state, and the United States (“laws”), as such may be amended from time to time. Provider’s work shall be subject to the regulation, control and direction of the town. All work done in connection with the installation, operation, maintenance, repair, modification, and/or replacement of the network nodes and node support poles shall be in compliance with all applicable laws.
(Ordinance 18-832 adopted 11/12/18)