(a) 
Preliminary plat: $400.00 + $5.00/lot + cost of professional fees.
(b) 
Final plat: $500.00 + $5.00/lot + cost of professional fees.
(c) 
Replat: $500.00 + $5.00/lot + cost of professional fees.
(d) 
Amended/minor/concept plat: $150.00 + cost of professional fees.
(e) 
Vacating plat: $75.00 + cost of professional fees.
(f) 
Zoning change: $500.00 + cost of professional fees.
(g) 
Zoning variance: $250.00 + cost of professional fees.
(h) 
Zoning board of appeal: $150.00.
(i) 
Conditional use permit: $300.00 + cost of professional fees.
(j) 
Appeal to city council: $100.00.
(k) 
Development plat: $500.00 + $5.00/lot + cost of professional fees.
(l) 
Annexation: $400.00 + cost of professional fees.
(m) 
Development agreement: $150.00 + cost of professional fees.
(n) 
Development plan: $150.00 + cost of professional fees.
(o) 
Site plan: $150.00 + cost of professional fees.
(p) 
Tree removal: $50.00.
(1) 
Tree replacement: $100.00/diameter-inch for each protected tree removed.
(2) 
Penalty for removing/damaging protected trees without a permit: $200.00/diameter inch.
(q) 
Wind turbines (requires CUP): $300.00 + cost of professional fees.
(r) 
Cell towers/antennas (requires CUP): $300.00 + cost of professional fees.
(s) 
Heritage overlay district application: $500.00.
(t) 
Vacation of easement, street or alley: $100.00.
(u) 
New uses requests: $300.00.
(v) 
Cost of professional fees: Deposit: $2,500.00. Actual fees shall be invoiced to applicant or property owner for incurred consultant fees for a project review including but not limited to city attorney, planning consultant, engineering consultant, plan review, and building inspections. Fees shall be charged anytime a project document is forwarded to said consultant(s) and/or anytime city incurs fees for project. The deposit will be subtracted from the final consultant fee invoice and any remainder shall be refunded to applicant/property owner from deposit or applicant/property owner shall be billed in excess of deposit.
(Ordinance 691-2017 adopted 9/7/17; Ordinance 758-2019, sec. 4, adopted 6/20/19; Ordinance 855-2023 adopted 2/16/2023)
(a) 
Construction plan review: 10% (residential) or 20% (commercial and industrial) of the following paid at submittal plus progressive monthly payments and balance due before the notice to proceed for public improvements.
(1) 
Residential: $500.00 + $87.98 per hour x 4.28 hours x number of lots.
(2) 
Commercial: $500.00 + $87.98 per hour x 3.44 hours x number of acres (up to 15 acres).
(3) 
Industrial (new): $1,000.00 + $87.98 per hour.
(b) 
Construction inspection ($500.00 + the following cost):
(1) 
Storm sewer: $1.32 per linear foot.
(2) 
Roadway paving (public and private): $1.14 per square yard.
(3) 
Sidewalk/trail: $2.79 per square yard.
(4) 
Handicap ramps: $28.39 each.
(5) 
Storm manholes/inlets: $37.26 each.
(6) 
Public infrastructure not listed (includes private storm infrastructure associated with roadway): $49.68 per hour (estimated prior to notice to proceed for public improvements)
(7) 
Final inspections: $49.68 per hour (2 hour minimum)
(8) 
Construction materials testing: Applicant pays directly to city approved vendor.
(c) 
Inspection overtime rate: $74.52 per hour (2 hour minimum)
(d) 
Closing/abandoning of:
(1) 
Right-of-way: $550.00.
(2) 
Easement: $250.00.
(e) 
Sign installation: $250.00 per sign.
(f) 
Easement/right-of-way use agreement: $125.00.
(g) 
Traffic study fee: $1,400.00.
(h) 
Flood study reviews (includes detention/retention analysis): $1.00 per foot of reach length ($2,000.00 minimum).
(Ordinance 879-2024 adopted 1/18/2024)