(a) Preliminary
plat: $400.00 + $5.00/lot + cost of professional fees.
(b) Final
plat: $500.00 + $5.00/lot + cost of professional fees.
(c) Replat:
$500.00 + $5.00/lot + cost of professional fees.
(d) Amended/minor/concept
plat: $150.00 + cost of professional fees.
(e) Vacating
plat: $75.00 + cost of professional fees.
(f) Zoning
change: $500.00 + cost of professional fees.
(g) Zoning
variance: $250.00 + cost of professional fees.
(h) Zoning
board of appeal: $150.00.
(i) Conditional
use permit: $300.00 + cost of professional fees.
(j) Appeal
to city council: $100.00.
(k) Development
plat: $500.00 + $5.00/lot + cost of professional fees.
(l) Annexation:
$400.00 + cost of professional fees.
(m) Development
agreement: $150.00 + cost of professional fees.
(n) Development
plan: $150.00 + cost of professional fees.
(o) Site
plan: $150.00 + cost of professional fees.
(p) Tree
removal: $50.00.
(1) Tree
replacement: $100.00/diameter-inch for each protected tree removed.
(2) Penalty
for removing/damaging protected trees without a permit: $200.00/diameter
inch.
(q) Wind
turbines (requires CUP): $300.00 + cost of professional fees.
(r) Cell
towers/antennas (requires CUP): $300.00 + cost of professional fees.
(s) Heritage
overlay district application: $500.00.
(t) Vacation
of easement, street or alley: $100.00.
(u) New
uses requests: $300.00.
(v) Cost
of professional fees: Deposit: $2,500.00. Actual fees shall be invoiced
to applicant or property owner for incurred consultant fees for a
project review including but not limited to city attorney, planning
consultant, engineering consultant, plan review, and building inspections.
Fees shall be charged anytime a project document is forwarded to said
consultant(s) and/or anytime city incurs fees for project. The deposit
will be subtracted from the final consultant fee invoice and any remainder
shall be refunded to applicant/property owner from deposit or applicant/property
owner shall be billed in excess of deposit.
(Ordinance 691-2017 adopted 9/7/17; Ordinance 758-2019, sec. 4, adopted 6/20/19; Ordinance 855-2023 adopted 2/16/2023)
(a) Construction plan review: 10% (residential) or 20% (commercial and
industrial) of the following paid at submittal plus progressive monthly
payments and balance due before the notice to proceed for public improvements.
(1)
Residential: $500.00 + $87.98 per hour x 4.28 hours x number
of lots.
(2)
Commercial: $500.00 + $87.98 per hour x 3.44 hours x number
of acres (up to 15 acres).
(3)
Industrial (new): $1,000.00 + $87.98 per hour.
(b) Construction inspection ($500.00 + the following cost):
(1)
Storm sewer: $1.32 per linear foot.
(2)
Roadway paving (public and private): $1.14 per square yard.
(3)
Sidewalk/trail: $2.79 per square yard.
(4)
Handicap ramps: $28.39 each.
(5)
Storm manholes/inlets: $37.26 each.
(6)
Public infrastructure not listed (includes private storm infrastructure
associated with roadway): $49.68 per hour (estimated prior to notice
to proceed for public improvements)
(7)
Final inspections: $49.68 per hour (2 hour minimum)
(8)
Construction materials testing: Applicant pays directly to city
approved vendor.
(c) Inspection overtime rate: $74.52 per hour (2 hour minimum)
(e) Sign installation: $250.00 per sign.
(f) Easement/right-of-way use agreement: $125.00.
(g) Traffic study fee: $1,400.00.
(h) Flood study reviews (includes detention/retention analysis): $1.00
per foot of reach length ($2,000.00 minimum).
(Ordinance 879-2024 adopted 1/18/2024)