(a) 
Permit application (temporary, permanent or banner style): $250.00.
(b) 
Each commercial type: $50.00.
(c) 
Subdivision or monument: $100.00.
(d) 
Site development: $100.00.
(e) 
Each variance:
(1) 
Commercial: $500.00.***
(2) 
Residential: $250.00.***
(f) 
Sign impoundment: $25.00.
(g) 
Uniform sign agreements:
(1) 
New: $500.00.
(2) 
Amendment: $250.00.
*** An additional fee of $150.00 will be added for notification costs.
(Ordinance 2024-015 adopted 9/17/2024)
(a) 
New commercial permit: $6,300.00 plus:
(1) 
$0.10 per square foot for all construction under 10,000 square feet; or
(2) 
$0.25 per square foot for all construction of 10,000 square feet or greater.
(3) 
$2,400.00 drainage review fee.
(4) 
$250.00 outdoor lighting review fee, if applicable.
(b) 
New residential permit (initial application)*: $3,050.00 plus:
(1) 
$0.10 per square foot for all construction under 7,000 square feet; or
(2) 
$0.25 per square foot for all construction of 7,000 square feet or greater.
(3) 
Drainage review fees as follows:
(A) 
Type I application: $600.00;
(B) 
Type II application: $1,200.00;
(C) 
Type III application: $1,800.00.
(4) 
$125.00 outdoor lighting review fee, if applicable.
(5) 
$900.00 inspections/technical code review fee.
(c) 
New residential permit (first extension): $4,575.00 plus:
(1) 
$0.10 per square foot for all construction under 7,000 square feet; or
(2) 
$0.25 per square foot for all construction of 7,000 square feet or greater.
(d) 
New residential permit (second extension): $7,625.00 plus:
(1) 
$0.10 per square foot for all construction under 7,000 square feet; or
(2) 
$0.25 per square foot for all construction of 7,000 square feet or greater.
(e) 
New residential permit (third extension): $9,150.00 plus:
(1) 
$0.10 per square foot for all construction under 7,000 square feet; or
(2) 
$0.25 per square foot for all construction of 7,000 square feet or greater.
(f) 
Commercial remodel: $2,180.00–$4,740.00 ($2,180.00 base permit fee plus $640.00 per each $100,000.00 of construction costs) plus $0.10 per square foot, plus technical review and inspection fees listed below:
(1) 
$550.00 inspections/technical review fee.
(2) 
$1,200.00 drainage review fee, if applicable.
(3) 
$125.00 outdoor lighting review fee, if applicable.
(g) 
Commercial addition: $2,900.00–$5,460.00 ($2,900.00 base permit fee plus $640.00 per each $100,000.00 of construction costs) plus $0.10 per square foot, plus technical review and inspection fees listed below:
(1) 
$1,200.00 drainage review fee.
(2) 
$125.00 outdoor lighting review fee, if applicable.
(3) 
$650.00 inspections/technical review fee.
(h) 
Residential remodel: $500.00 plus $0.10 per square foot, plus technical review and inspection fees listed below:
(1) 
Drainage review fees as follows:
(A) 
Type I application: $600.00;
(B) 
Type II application: $1,200.00;
(C) 
Type III application: $1,800.00 (if applicable).
(2) 
$125.00 outdoor lighting review fee, if applicable.
(3) 
$550.00 inspections/technical review fee.
(4) 
Residential remodel permit extension: Half of the original permit fee.
(i) 
Residential addition: $500.00 plus $0.10 per square foot, plus technical review and inspection fees listed below:
(1) 
Drainage review fees as follows:
(A) 
Type I application: $600.00;
(B) 
Type II application: $1,200.00;
(C) 
Type III application: $1,800.00 (if applicable).
(2) 
$125.00 outdoor lighting review fee, if applicable.
(3) 
$550.00 inspections/technical review fee.
(4) 
Residential addition permit extension: Half of the original permit fee.
(j) 
Swimming pool: $1,440.00 + $0.10 per square foot, plus technical review and inspection fees listed below:
(1) 
Drainage review fees as follows:
(A) 
Type I application: $600.00;
(B) 
Type II application: $1,200.00;
(C) 
Type III application: $1,800.00 (if applicable).
This includes up to 3 reviews. Each review after is billed at an hourly rate.
(2) 
$125.00 outdoor lighting review fee, if applicable.
(3) 
$425.00 inspections/technical review fee.
(k) 
Utility development (each mile): $500.00.
(l) 
Structure movement (through): $150.00.
(m) 
Structure movement (into): $350.00.
(n) 
Consultant, per request: $200.00 or cost.
(o) 
Consultant, per hour: $200.00 or cost.
(p) 
Each variance or appeal:
(1) 
Commercial $750.00.***
(2) 
Residential: $500.00.***
(q) 
Building demolition:
(1) 
Residential: $100.00.
(2) 
Commercial: $500.00.
(r) 
Permit revision:
(1) 
Residential: $500.00.
(2) 
Commercial: $1,000.00.
(s) 
Small project permits: $75.00.
(t) 
Solar: $150.00.
(u) 
Oak wilt, each permit: $150.00 for residential, $300.00 for commercial.
(v) 
Plumbing inspections: $500.00 (see applicable inspections fees listed under individual permit types).
(w) 
Landscaping:
(1) 
Tree application: No fee.
(2) 
Tree inspection:
(A) 
Remodel, demo, swimming pool: $150.00.
(B) 
New construction: $250.00.
(3) 
Tree removal and replacement for nondiseased trees between ten (10) inches and less than fourteen (14) inches (section 22.03.301 et seq.): $200.00 per caliper inch.
(4) 
Tree removal and replacement for nondiseased trees fourteen (14) inches and greater (section 22.03.301 et seq.): $300.00 per caliper inch.
(5) 
Unauthorized tree removal for nondiseased trees (section 22.03.301 et seq.): $500.00 per caliper inch.
(x) 
Unified development agreement application:
(1) 
Commercial: $500.00.
(2) 
Residential: $250.00.
(y) 
Fence permit application: $250.00 for residential, $500.00 for commercial.
(z) 
Mailbox permit application: $100.00.
In addition to the standard fee, professional services fees may be required depending on the nature of the request (see section A9.007).
*** An additional fee of $150.00 will be added for notification costs.
Note: For work done without a variance, building permit, or special use permit, all application fees will be doubled.
Note: All permit fees include an additional $5.00 technology fee.
(Ordinance 2024-015 adopted 9/17/2024)
(a) 
Subdivision plat: $500.00.**
(b) 
Land use/acre, (nonresidential): $200.00.
(c) 
Each lot in plat: $200.00.**
(d) 
Each variance or appeal:
(1) 
Commercial: $500.00.***
(2) 
Residential: $250.00.***
(e) 
Vacation document filing: $200.00.
(f) 
Oak wilt, per acre: $100.00.
(g) 
Resubmission of denied subdivision plat within ninety (90) days of denial: $500.00 (with no per lot charge).
In addition to the standard fee, professional services fees may be required depending on the nature of the request (see section A9.007).
**Plats which combine two or more residential lots into a single larger residential lot shall pay a flat fee of $300.00 in lieu of the $500.00 fee for a subdivision plat and the $200.00 fee for each lot in the plat.
*** An additional fee of $150.00 will be added for notification costs if required.
(Ordinance 2024-015 adopted 9/17/2024)
(a) 
Site plans:
(1) 
Nonresidential: $500.00 plus $0.10/square foot added impervious cover.
(2) 
Residential: $250.00.
(3) 
Consultant review fees: At cost
(b) 
Each variance or appeal:
(1) 
Commercial $500.00.***
(2) 
Residential: $250.00.***
(c) 
Resubmission of denied site plan within ninety (90) days of denial:
(1) 
Nonresidential: $500.00 (with no per square foot of added impervious cover charge).
(2) 
Residential: $100.00.
(d) 
Resubmission of denied site plan within ninety (90) days of denial: $500.00 (with no per square foot charge).
In addition to the standard fee, professional services fees may be required depending on the nature of the request (see section A9.007).
(Ordinance 2024-015 adopted 9/17/2024)
(a) 
Each variance - adjustment/appeal:
(1) 
Commercial: $500.00.***
(2) 
Residential: $250.00.***
(b) 
Each change to an approved site plan: $150.00.
(c) 
Oak wilt (per acre): $100.00.
(d) 
Special use requests:
(1) 
Initial issue:
(A) 
Home occupation: $150.00.
(B) 
All others: $500.00.***
(2) 
Renewals by city council: $300.00.
(3) 
Renewals by city administrator:
(A) 
Residential: $150.00.***
(B) 
Commercial: $300.00.***
(e) 
Zoning change requests: $1,000.00.***
(f) 
Zoning determination letter requests: $50.00.
(g) 
Appeals to board of adjustment of administrative official: $250.00.
(h) 
Planned development district:
(1) 
Application: $2,500.00.***
(A) 
Per code deviation: $150.00.
In addition to the standard fee, professional services fees may be required depending on the nature of the request (see section A9.007).
*** An additional fee of $150.00 will be added for notification costs if notification is required to be made by the city for an applicant.
(Ordinance 2024-015 adopted 9/17/2024)
In situations where the city administrator anticipates the city's out-of-pocket expenses for professional services related to review of an application will exceed the amount recouped by the imposition of standard fees, the city shall require the applicant to pay a deposit. The amount of the deposit may range from $1,000.00–$10,000.00, as deemed necessary by the city administrator. Examples of projects for which a deposit may be warranted include (but are not limited to) subdivision plats, rezoning requests, and planned development districts. The deposit shall solely be applied to payment of professional services by engineers, attorneys, surveyors, architects, landscape architects, etc., that are specifically engaged by the city to consult directly on the applicant's proposed project. Payment of this deposit shall be an express condition of the city's review of and determination upon the application. Payment of the deposit does not guarantee approval of the application. Nor does payment of the deposit create a client relationship between the applicant and the professional services provider. Deposit funds shall not be expended by the city on code enforcement activities. The deposit shall be replenished by the applicant upon depletion within 30 days of being notified by the city in writing. Unused account balances shall be reimbursed to the applicant or applied to future permit applications, at the applicant's discretion.
(Ordinance 2024-015 adopted 9/17/2024)
(a) 
The fee for work started or completed that requires a no-fee permit, without first obtaining such a permit is $250.00.
(b) 
This fee is to be assessed to recoup the city's reasonable administrative expenses related processing permit applications after the fact, and is not established as a penalty or fine.
(Ordinance 2024-015 adopted 9/17/2024)