(a)
The use of the right-of-way in any manner which violates federal, state, or local laws, or city codes, ordinances and regulations, including, without limitation, those relating to health, safety, noise, environmental protection, waste disposal and water and air quality, is prohibited. All permittees shall provide satisfactory evidence of compliance with the foregoing upon request of the city.
(b)
The permittee shall dispose of all material removed from the right-of-way and any waste created by permittee in compliance with all state, federal and local laws and requirements. Temporary storage of material may be placed in a pile no higher than 30 inches.
(c)
If a permittee excavates any contaminated, regulated or hazardous materials in the right-of-way, such permittee shall be responsible for environmental assessment, excavation, testing, transportation and disposal of that material in accordance with applicable law. The permittee shall promptly notify the city, orally, of the condition within two hours of discovery of any contaminated, regulated or hazardous materials in the right-of-way, and within eight hours provide the aforementioned information to the city in writing. The permittee must consult with and receive written authorization from the city before undertaking any of the steps/actions set forth in this subsection.
(Ordinance 639-18 adopted 6/26/18)