(a)
Required; fees.
A permit must be obtained relating to construction and maintenance of buildings within the city and inspections shall be required. Permit fees for construction and maintenance of buildings within the city are as set forth in the fee schedule in appendix A of this code.
(b)
Failure to obtain permit.
Failure to obtain required permits prior to the start of construction will automatically require that permit fees be doubled and fines may be issued. The payment of double fees shall not relieve any persons from fully complying with the requirements of the codes in execution of the work nor from any other penalties prescribed herein.
(c)
Requirements for obtaining permit.
To obtain permits:
(1)
Electricians.
Electricians must have a current State of Texas license and be licensed as a master electrician or provide a letter written from a master electrician giving permission to obtain the permit.
(2)
Plumbers.
Plumbers must have a current State of Texas license and be licensed as a master plumber or provide a letter written from a master plumber giving permission to obtain the permit.
(3)
Mechanical contractors.
Mechanical contractors must have a current State of Texas license or provide a letter written from the person with the current State of Texas license giving permission to obtain the permit.
(4)
Homeowners.
Homeowners must obtain required permits prior to construction and maintenance and inspections shall be required.
(Ordinance 1077 adopted 1/18/11; 2004 Code, sec. 3.1401; Ordinance adopting 2019 Code)