Permit and applications fees:
(1) 
Building:
(A) 
Single-family Residential New: $220.00 min. (.05/sq. ft.).
(B) 
Multi-family Residential or Commercial: $325.00 min. (.05/sq. ft.).
(C) 
Addition or outbuilding: $50 min. (.05/sq. ft.).
(2) 
Plumbing:
(A) 
Single-family Residential Project: $50 min. (.05/sq. ft.).
(B) 
Multi-family Residential or Commercial: $50 min. (.05/sq. ft.).
(C) 
Lawn Irrigation System: $40.
(3) 
Electric:
(A) 
Single-family Residential Project: $50 min. (.05/sq. ft.).
(B) 
Multi-family Residential or Commercial: $50 min. (.05/sq. ft.).
(4) 
Mechanical (HVAC):
(A) 
Single-family Residential Project: $50 min. (.05/sq. ft.).
(B) 
Multi-family Residential or Commercial: $50 min.
(5) 
ROW Construction:
(A) 
Construction working in ROW: $100.
(6) 
Plan Review: $50.
(Ordinance 1314 adopted 9/15/20; Ordinance 1328 adopted 9/21/2021; Ordinance 1349 adopted 10/18/2022; Ordinance 1366 adopted 9/19/2023; Ordinance 1386 adopted 9/17/2024; Ordinance 1401 adopted 9/16/2025; Ordinance 1405 adopted 11/18/2025)
(a) 
Fire code plan review services (fire alarm and/or sprinkler system):
Valuation
Fee
$1.00 to $250,000
$500.00
$250,001 to $500,000
$850.00
$500,001 to $1,000,000
$1,100.00
$1,000,001 to $3,000,000
$1,600.00
$3,000,001 to $6,000,000
$2,400.00
$6,000,001 and up
$2,400.00.00 for the first $6,000,000.00 plus $0.25 for each additional $1,000,000.00
(b) 
Fire code inspection services (fire, alarm and/or sprinkler system):
Valuation
Fee
$1.00 to $250,000
$750.00
$250,001 to $500,000
$1,050.00
$500,001 to $1,000,000
$1,100.00
$1,000,001 to $3,000,000
$1,350.00
$3,000,001 to $6,000,000
$1,900.00
$6,000,001 and up
$2,850.00 for first $6,000,000.00 plus $0.25 for each additional $1,000,000.00
(Ordinance 1314 adopted 9/15/20; Ordinance 1328 adopted 9/21/2021; Ordinance 1349 adopted 10/18/2022; Ordinance 1366 adopted 9/19/2023; Ordinance 1386 adopted 9/17/2024)
Reinspection fee: $50.00.
(Ordinance 1314 adopted 9/15/20; Ordinance 1328 adopted 9/21/2021; Ordinance 1349 adopted 10/18/2022; Ordinance 1366 adopted 9/19/2023; Ordinance 1386 adopted 9/17/2024; Ordinance 1401 adopted 9/16/2025; Ordinance 1405 adopted 11/18/2025)
(a) 
Zoning application fee: $250.00.
(b) 
Zoning variance fee: $250.00.
(c) 
Filing fee for preliminary plats: $300.00.
(d) 
Filing fee for final plats: $300.00.
(e) 
Minor plat: $100.00.
(Ordinance 1314 adopted 9/15/20; Ordinance 1328 adopted 9/21/2021; Ordinance 1349 adopted 10/18/2022; Ordinance 1366 adopted 9/19/2023; Ordinance 1386 adopted 9/17/2024; Ordinance 1401 adopted 9/16/2025; Ordinance 1405 adopted 11/18/2025)
(a) 
Septic tank system: TCEQ fee $10.00.
(Ordinance 1314 adopted 9/15/20; Ordinance 1328 adopted 9/21/2021; Ordinance 1349 adopted 10/18/2022; Ordinance 1366 adopted 9/19/2023; Ordinance 1386 adopted 9/17/2024; Ordinance 1401 adopted 9/16/2025; Ordinance 1405 adopted 11/18/2025)
(a) 
Solar panels: $100.00.
(b) 
Fence permit: $75.00.
(c) 
Demolition permit, residential: $50.00.
(d) 
Demolition permit, commercial: $150.00.
(e) 
Swimming pool in-ground: $100.00.
(f) 
Swimming pool above-ground (24" deep or deeper): $75.00.
(g) 
Carport: $75.00.
(h) 
Accessory building larger than 150 sq. ft.: $50.00.
(i) 
Customer service inspection (CSI) - commercial: $125.00.
(j) 
Customer service inspection (CSI) - residential: $50.00 in-house inspector.
(k) 
Sign permit (less than 50 sq. ft.): $75.00.
(l) 
Sign permit (larger than 50 sq. ft.): $125.00.
(m) 
Manufactured home moving/relocation: $200.00.
(n) 
House moving: $200.00.
(o) 
Driveway/curb cut: $40.00.
(p) 
Cargo/shipping container permit: $50.00.
(q) 
Grease trap: $40.00.
(r) 
Underground and above-ground fuel tanks: $100.00.
(s) 
Gasoline fuel pumps: $10.00.
(t) 
LPG permit: $10.00.
(u) 
Fuel gas lines: $40.00.
(v) 
Preliminary plan review residential: $125.00.
(w) 
Preliminary plan review commercial: $200.00.
(Ordinance 1077 adopted 1/18/11; 2004 Code, sec. 3.1401(a)(6); Ordinance 1258 adopted 9/18/18; Ordinance 1283 adopted 9/17/19; Ordinance 1314 adopted 9/15/20; Ordinance 1328 adopted 9/21/2021; Ordinance 1349 adopted 10/18/2022; Ordinance 1366 adopted 9/19/2023; Ordinance 1386 adopted 9/17/2024; Ordinance 1401 adopted 9/16/2025; Ordinance 1405 adopted 11/18/2025)
Certificate of occupancy - commercial, per ownership change: $75.00 each.
(Ordinance 1314 adopted 9/15/20; Ordinance 1328 adopted 9/21/2021; Ordinance 1349 adopted 10/18/2022; Ordinance 1366 adopted 9/19/2023; Ordinance 1386 adopted 9/17/2024; Ordinance 1401 adopted 9/16/2025; Ordinance 1405 adopted 11/18/2025)
Contractor registration: $50.00.
(Ordinance 1314 adopted 9/15/20; Ordinance 1328 adopted 9/21/2021; Ordinance 1349 adopted 10/18/2022; Ordinance 1366 adopted 9/19/2023; Ordinance 1386 adopted 9/17/2024; Ordinance 1401 adopted 9/16/2025; Ordinance 1405 adopted 11/18/2025)
(a) 
Plumbing permit:
$0.05 per square foot for new construction and additions, or changes to rough in. Minimum permit fee $25.00.
(b) 
Electrical permit:
$0.05 per square foot for new construction and additions, or changes to rough in. Minimum permit fee $25.00.
(c) 
Mechanical permit:
$0.05 per square foot for new construction and additions or changes to rough in. Minimum permit fee $25.00.
(Ordinance 1077 adopted 1/18/11; 2004 Code, sec. 3.1401(a)(2)–(4))
Where it is necessary to have electricity supplied to any installation before the final certificate can be issued, the contractor receiving the same shall pay to the electrical inspector therefor a fee of one dollar ($1.00).
(1975 Code, sec. 13-86; 2004 Code, sec. 3.662)
(a) 
Permit fees for installation of irrigation systems in the city are as follows:
(1) 
Issuing permit: $10.00.
(2) 
Installation, alteration or repair of water or gas piping: $5.00.
(3) 
Vacuum breakers or backflow protective devices: $2.50.
(4) 
One to ten sprinkler heads: $7.00.
(5) 
Over ten sprinkler heads: $0.15 (per head).
(b) 
Permit fees to double if work started before permit issued.
(Ordinance 1022 adopted 4/16/08; 2004 Code, sec. 3.1301)