[Ord. No. 2020-3, 6/11/2020]
1. The intent of this Part is to:
A. Promote the general health, welfare, and safety of the community.
B. Encourage the utilization of appropriate construction practices in
order to prevent or minimize flood damage in the future.
C. Minimize danger to public health by protecting water supply and natural
drainage.
D. Reduce financial burdens imposed on the community, its governmental
units, and its residents by preventing excessive development in areas
subject to flooding.
E. Comply with federal and state floodplain management requirements.
[Ord. No. 2020-3, 6/11/2020]
It shall be unlawful for any person, partnership, business or
corporation to undertake, or cause to be undertaken, any construction
or development anywhere within the Township of Swatara unless a permit
has been obtained from the Floodplain Administrator.
[Ord. No. 2020-3, 6/11/2020]
This Part supersedes any other conflicting provisions which
may be in effect in identified floodplain areas. However, any other
ordinance provisions shall remain in full force and effect to the
extent that those provisions are more restrictive. If there is any
conflict between any of the provisions of this Part, the more restrictive
shall apply.
[Ord. No. 2020-3, 6/11/2020]
If any section, subsection, paragraph, sentence, clause, or
phrase of this Part shall be declared invalid for any reason whatsoever,
such a decision shall not affect the remaining portions of this Part,
which shall remain in full force and effect, and for this purpose
the provisions of this Part are hereby declared to be severable.
[Ord. No. 2020-3, 6/11/2020]
1. The degree of flood protection sought by the provisions of this Part
is considered reasonable for regulatory purposes and is based on accepted
engineering methods of study. Larger floods may occur or flood heights
may be increased by man-made or natural causes, such as ice jams and
bridge openings restricted by debris. This Part does not imply that
areas outside any identified floodplain areas, or that land uses permitted
within such areas, will be free from flooding or flood damages.
2. This Part shall not create liability on the part of the Township
of Swatara or any officer or employee thereof for any flood damages
that result from reliance on this Part or any administrative decision
lawfully made thereunder.
[Ord. No. 2020-3, 6/11/2020]
1. The Zoning Officer is hereby appointed to administer and enforce
this Part and is referred to herein as the "Floodplain Administrator."
The Floodplain Administrator may: A) fulfill the duties and responsibilities
set forth in this Part, B) delegate duties and responsibilities set
forth in this Part to qualified technical personnel, plan examiners,
inspectors, and other employees, or C) enter into a written agreement
or written contract with another agency or private sector entity to
administer specific provisions of this Part. Administration of any
part of this Part by another entity shall not relieve the community
of its responsibilities pursuant to the participation requirements
of the National Flood Insurance Program as set forth in the Code of
Federal Regulations at 44 CFR 59.22.
2. In the absence of a designated Floodplain Administrator, the Floodplain
Administrator duties are to be fulfilled by the Chairman of the Board
of Supervisors.
[Ord. No. 2020-3, 6/11/2020]
A permit shall be required before any construction or development
is undertaken within any area of the Township of Swatara.
[Ord. No. 2020-3, 6/11/2020]
1. The Floodplain Administrator shall issue a permit only after it has
been determined that the proposed work to be undertaken will be in
conformance with the requirements of this and all other applicable
codes and ordinances.
2. Prior to the issuance of any permit, the Floodplain Administrator
shall review the application for the permit to determine if all other
necessary government permits required by state and federal laws have
been obtained, such as those required by the Pennsylvania Sewage Facilities
Act (Act 1966-537, as amended); the Pennsylvania Dam Safety and Encroachments Act (Act
1978-325, as amended); the Pennsylvania Clean Streams Act (Act 1937-394, as
amended); and the U.S. Clean Water Act, Section 404, 33 U.S.C.
§ 1344. No permit shall be issued until this determination
has been made.
3. In the case of existing structures, prior to the issuance of any
development/permit, the Floodplain Administrator shall review the
proposed cost of improvements or repairs and the preimprovement market
value of the structure so that a substantial improvement/substantial
damage determination can be made, in accordance with FEMA's Substantial
Improvement/Substantial Damage Desk Reference.
4. During the construction period, the Floodplain Administrator or other
authorized official shall inspect the premises to determine that the
work is progressing in compliance with the information provided on
the permit application and with all applicable municipal laws and
ordinances. He/she shall make as many inspections during and upon
completion of the work as are necessary.
5. In the discharge of his/her duties, the Floodplain Administrator
shall have the authority to enter any building, structure, premises
or development in the identified floodplain area, upon presentation
of proper credentials, at any reasonable hour to enforce the provisions
of this Part.
6. In the event the Floodplain Administrator discovers that the work
does not comply with the permit application or any applicable laws
and ordinances, or that there has been a false statement or misrepresentation
by any applicant, the Floodplain Administrator shall revoke the permit
and report such fact to the Board of Supervisors for whatever action
it considers necessary.
7. The Floodplain Administrator shall maintain in perpetuity, or for
the lifetime of the structure, all records associated with the requirements
of this Part, including, but not limited to, finished construction
elevation data, permitting, inspection and enforcement.
8. The Floodplain Administrator is the official responsible for submitting
a biennial report to FEMA concerning community participation in the
National Flood Insurance Program as requested.
9. The responsibility, authority and means to implement the commitments
of the Floodplain Administrator can be delegated from the person identified.
However, the ultimate responsibility lies with the person identified
in this Part as the floodplain administrator/manager.
10. The Floodplain Administrator shall consider the requirements of the
34 Pa. Code and the 2015 IBC and the 2015 IRC, or the latest revision
thereof as adopted by the Commonwealth of Pennsylvania.
[Ord. No. 2020-3, 6/11/2020]
1. Application for such a permit shall be made, in writing, to the Floodplain
Administrator on forms supplied by the Township of Swatara. Such application
shall contain the following:
A. Name and address of applicant.
B. Name and address of owner of land on which proposed construction
is to occur.
C. Name and address of contractor.
D. Site location, including address.
E. Listing of other permits required.
F. Brief description of proposed work and estimated cost, including
a breakout of flood-related cost and the market value of the building
before the flood damage occurred, where appropriate.
G. A plan of the site showing the exact size and location of the proposed
construction as well as any existing buildings or structures.
2. If any proposed construction or development is located entirely or
partially within any identified floodplain area, applicants for permits
shall provide all the necessary information in sufficient detail and
clarity to enable the Floodplain Administrator to determine that:
A. All such proposals are consistent with the need to minimize flood
damage and conform with the requirements of this Part and all other
applicable codes and ordinances;
B. All utilities and facilities, such as sewer, gas, electrical and
water systems, are located and constructed to minimize or eliminate
flood damage;
C. Adequate drainage is provided so as to reduce exposure to flood hazards;
D. Structures will be anchored to prevent floatation, collapse, or lateral
movement;
E. Building materials are flood-resistant;
F. Appropriate practices that minimize flood damage have been used;
and
G. Electrical, heating, ventilation, plumbing, air-conditioning equipment,
and other service facilities have been designed and located to prevent
water entry or accumulation.
3. Applicants shall file the following minimum information plus any
other pertinent information as may be required by the Floodplain Administrator
to make the above determination:
A. A completed permit application form.
B. A plan of the entire site, clearly and legibly drawn at a scale of
one inch being equal to 100 feet or less, showing the following:
(1)
North arrow, scale, and date;
(2)
Topographic contour lines, if available;
(3)
The location of all existing and proposed buildings, structures,
and other improvements, including the location of any existing or
proposed subdivision and development;
(4)
The location of all existing streets, drives, and other accessways;
and
(5)
The location of any existing bodies of water or watercourses,
identified floodplain areas, and, if available, information pertaining
to the floodway, and the flow of water, including direction and velocities.
C. Plans of all proposed buildings, structures and other improvements,
drawn at suitable scale, showing the following:
(1)
The proposed lowest floor elevation of any proposed building
based upon North American Vertical Datum of 1988;
(2)
The elevation of the base flood;
(3)
Supplemental information as may be necessary under 34 Pa. Code,
the 2015 IBC or the 2015 IRC, or the latest revision thereof as adopted
by the Commonwealth of Pennsylvania.
D. The following data and documentation:
(1)
Detailed information concerning any proposed floodproofing measures
and corresponding elevations.
(2)
If available, information concerning flood depths, pressures,
velocities, impact and uplift forces and other factors associated
with a base flood.
(3)
Documentation, certified by a registered professional engineer or architect, to show that the effect of any proposed development within a floodway area (See §
27-1317, Subsection 1A.) will not increase the base flood elevation at any point.
(4)
Documentation, certified by a registered professional engineer or architect, to show that the cumulative effect of any proposed development within an AE Area/District without floodway (See §
27-1317, Subsection 1B.), when combined with all other existing and anticipated development, will not increase the base flood elevation more than one foot at any point within the community.
(5)
A document, certified by a registered professional engineer
or architect, which states that the proposed construction or development
has been adequately designed to withstand the pressures, velocities,
impact and uplift forces associated with the base flood. Such statement
shall include a description of the type and extent of floodproofing
measures which have been incorporated into the design of the structure
and/or the development.
(6)
Detailed information needed to determine compliance with §
27-1323, Subsection 1F, Storage, and §
27-1324, Development That May Endanger Human Life, including:
(a)
The amount, location and purpose of any materials or substances referred to in §
27-1323, Subsection 1F, and §
27-1324 which are intended to be used, produced, stored or otherwise maintained on site.
(b)
A description of the safeguards incorporated into the design of the proposed structure to prevent leaks or spills of the dangerous materials or substances listed in §
27-1324 during a base flood.
(7)
The appropriate component of the Department of Environmental
Protection's "Planning Module for Land Development."
(8)
Where any excavation or grading is proposed, a plan meeting
the requirements of the Department of Environmental Protection, to
implement and maintain erosion and sedimentation control.
4. Applications for permits shall be accompanied by a fee, payable to
the municipality based upon the estimated cost of the proposed construction
as determined by the Floodplain Administrator.
[Ord. No. 2020-3, 6/11/2020]
A copy of all plans and applications for any proposed construction
or development in any identified floodplain area to be considered
for approval may be submitted by the Floodplain Administrator to any
other appropriate agencies and/or individuals (e.g., Planning Commission,
Municipal Engineer, etc.) for review and comment.
[Ord. No. 2020-3, 6/11/2020]
After the issuance of a permit by the Floodplain Administrator,
no changes of any kind shall be made to the application, permit or
any of the plans, specifications or other documents submitted with
the application without the written consent or approval of the Floodplain
Administrator. Requests for any such change shall be in writing and
shall be submitted by the applicant to the Floodplain Administrator
for consideration.
[Ord. No. 2020-3, 6/11/2020]
In addition to the permit, the Floodplain Administrator shall
issue a placard, or similar document, which shall be displayed on
the premises during the time construction is in progress. This placard
shall show the number of the permit, the date of its issuance, and
be signed by the Floodplain Administrator.
[Ord. No. 2020-3, 6/11/2020]
1. Work on the proposed construction or development shall begin within
180 days after the date of issuance of the development permit. Work
shall also be completed within 12 months after the date of issuance
of the permit or the permit shall expire unless a time extension is
granted, in writing, by the Floodplain Administrator. The issuance
of development permit does not refer to the zoning approval.
2. The actual start of construction means either the first placement
of permanent construction of a structure on a site, such as the pouring
of slab or footings, the installation of piles, the construction of
columns, or any work beyond the stage of excavation; or the placement
of a manufactured home on a foundation. Permanent construction does
not include land preparation, such as clearing, grading, and filling;
nor does it include the installation of streets and/or walkways; nor
does it include excavation for a basement, footings, piers, or foundations
or the erection of temporary forms; nor does it include the installation
on the property of accessory buildings, such as garages or sheds not
occupied as dwelling units or not part of the main structure. For
a substantial improvement, the actual start of construction means
the first alteration of any wall, ceiling, floor, or other structural
part of a building, whether or not that alteration affects the external
dimensions of the building.
3. Time extensions shall be granted only if a written request is submitted
by the applicant, who sets forth sufficient and reasonable cause for
the Floodplain Administrator to approve such a request, and the original
permit is compliant with this Part and FIRM/FIS in effect at the time
the extension is granted.
[Ord. No. 2020-3, 6/11/2020]
1. Notices. Whenever the Floodplain Administrator or other authorized
municipal representative determines that there are reasonable grounds
to believe that there has been a violation of any provisions of this
Part, or of any regulations adopted pursuant thereto, the Floodplain
Administrator shall give notice of such alleged violation as hereinafter
provided. Such notice shall:
B. Include a statement of the reasons for its issuance;
C. Allow a reasonable time, not to exceed a period of 30 days, for the
performance of any act it requires;
D. Be served upon the property owner or his agent as the case may require;
provided, however, that such notice or order shall be deemed to have
been properly served upon such owner or agent when a copy thereof
has been served with such notice by any other method authorized or
required by the laws of this state;
E. Contain an outline of remedial actions which, if taken, will affect
compliance with the provisions of this Part.
2. Penalties. Any person who fails to comply with any or all of the
requirements or provisions of this Part or who fails or refuses to
comply with any notice, order of direction of the Floodplain Administrator
or any other authorized employee of the municipality shall be guilty
of a summary offense and, upon conviction, shall pay a fine to the
Township of Swatara of not less than $25 nor more than $600, plus
costs of prosecution as well as attorney fees and costs. In addition
to the above penalties, all other actions are hereby reserved, including
an action in equity for the proper enforcement of this Part. The imposition
of a fine or penalty for any violation of, or noncompliance with,
this Part shall not excuse the violation or noncompliance or permit
it to continue. All such persons shall be required to correct or remedy
such violations and noncompliance within a reasonable time. Any development
initiated or any structure or building constructed, reconstructed,
enlarged, altered, or relocated in noncompliance with this Part may
be declared by the Board of Supervisors to be a public nuisance and
abatable as such.
[Ord. No. 2020-3, 6/11/2020]
1. Any person aggrieved by any action or decision of the Floodplain
Administrator concerning the administration of the provisions of this
Part may appeal to the Zoning Hearing Board. Such appeal must be filed,
in writing, within 30 days after the decision, determination or action
of the Floodplain Administrator.
2. Upon receipt of such appeal, the Zoning Hearing Board shall consider
the appeal in accordance with the Municipalities Planning Code and any other local ordinance.
3. Any person aggrieved by any decision of the Zoning Hearing Board
may seek relief therefrom by appeal to court, as provided by the laws
of this state, including the Pennsylvania Flood Plain Management Act.
[Ord. No. 2020-3, 6/11/2020]
1. The identified floodplain area shall be:
A. Any areas of the Township of Swatara classified as special flood
hazard areas (SFHAs) in the Flood Insurance Study (FIS) and the accompanying
Flood Insurance Rate Maps (FIRMs) dated July 8, 2020, and issued by
the Federal Emergency Management Agency (FEMA), or the most recent
revision thereof, including all digital data developed as part of
the Flood Insurance Study.
2. The above referenced FIS and FIRMs, and any subsequent revisions
and amendments, are hereby adopted by the Township of Swatara and
declared to be a part of this Part.
[Ord. No. 2020-3, 6/11/2020]
1. The identified floodplain area shall consist of the following specific
areas:
A. The floodway area shall be those areas identified in the FIS and
the FIRM as floodway and which represent the channel of a watercourse
and the adjacent land areas that must be reserved in order to discharge
the base flood without increasing the water surface elevation by more
than one foot at any point. This term shall also include floodway
areas which have been identified in other available studies or sources
of information for those special flood hazard areas where no floodway
has been identified in the FIS and FIRM.
(1)
Within any floodway area, no encroachments, including fill,
new construction, substantial improvements, or other development shall
be permitted unless it has been demonstrated through hydrologic and
hydraulic analysis performed in accordance with standard engineering
practice that the proposed encroachment would not result in any increase
in flood levels within the community during the occurrence of the
base flood discharge.
(2)
Within any floodway area, no new construction or development
shall be allowed, unless the appropriate permit is obtained from the
Department of Environmental Protection Regional Office.
B. The AE Area/District shall be those areas identified as an AE Zone
on the FIRM included in the FIS prepared by FEMA for which base flood
elevations have been provided.
(1)
The AE Area adjacent to the floodway shall be those areas identified
as an AE Zone on the FIRM included in the FIS prepared by FEMA for
which base flood elevations have been provided and a floodway has
been delineated.
(2)
The AE Area without floodway shall be those areas identified
as an AE Zone on the FIRM included in the FIS prepared by FEMA for
which base flood elevations have been provided but no floodway has
been determined.
(a)
No encroachments, including fill, new construction, substantial
improvements, or other development shall be permitted in an AE Zone
without floodway, unless it has been demonstrated through hydrologic
and hydraulic analysis performed in accordance with standard engineering
practice that the proposed development, together with all other existing
and anticipated development, would not result in an increase in flood
levels of more than one foot within the entire community during the
occurrence of the base flood discharge.
(b)
No new construction or development shall be located within the
area measured 50 feet landward from the top-of-bank of any watercourse,
unless the appropriate permit is obtained from the Department of Environmental
Protection Regional Office.
C. The A Area/District shall be those areas identified as an A Zone
on the FIRM included in the FIS prepared by FEMA and for which no
base flood elevations have been provided. For these areas, elevation
and floodway information from other federal, state, or other acceptable
sources shall be used when available. Where other acceptable information
is not available, the base flood elevation shall be determined by
using the elevation of a point on the boundary of the identified floodplain
area which is nearest the construction site. In lieu of the above,
the municipality may require the applicant to determine the elevation
with hydrologic and hydraulic engineering techniques. Hydrologic and
hydraulic analyses shall be undertaken only by professional engineers
or others of demonstrated qualifications, who shall certify that the
technical methods used correctly reflect currently accepted technical
concepts. Studies, analyses, computations, etc., shall be submitted
in sufficient detail to allow a thorough technical review by the municipality.
In the absence of any of the above data or documentation, the community
may require elevation of the lowest floor to be at least three feet
above the highest adjacent grade.
D. The AO and AH Area/District shall be those areas identified as Zones
AO and AH on the FIRM and in the FIS. These areas are subject to inundation
by 1% annual chance shallow flooding where average depths are between
one and three feet. In Zones AO and AH, drainage paths shall be established
to guide floodwaters around and away from structures on slopes.
[Ord. No. 2020-3, 6/11/2020]
The identified floodplain area may be revised or modified by the Board of Supervisors where studies or information provided by a qualified agency or person documents the need for such revision. However, prior to any such change to the special flood hazard area, approval must be obtained from FEMA. Additionally, as soon as practicable, but not later than six months after the date such information becomes available, a community shall notify FEMA of the changes to the special flood hazard area by submitting technical or scientific data. See §
27-1321, Subsection
2, for situations where FEMA notification is required.
[Ord. No. 2020-3, 6/11/2020]
Should a dispute concerning any identified floodplain boundary
arise, an initial determination shall be made by the Township of Swatara,
and any party aggrieved by this decision or determination may appeal
to the Zoning Hearing Board. The burden of proof shall be on the appellant.
[Ord. No. 2020-3, 6/11/2020]
Prior to development occurring in areas where annexation or
other corporate boundary changes are proposed or have occurred, the
community shall review flood hazard data affecting the lands subject
to boundary changes. The community shall adopt and enforce floodplain
regulations in areas subject to annexation or corporate boundary changes
which meet or exceed those in 44 CFR 60.3.
[Ord. No. 2020-3, 6/11/2020]
1. Alteration or Relocation of Watercourse.
A. No encroachment, alteration, or improvement of any kind shall be
made to any watercourse until all adjacent municipalities which may
be affected by such action have been notified by the municipality
and until all required permits or approvals have first been obtained
from the Department of Environmental Protection Regional Office.
B. No encroachment, alteration, or improvement of any kind shall be
made to any watercourse unless it can be shown that the activity will
not reduce or impede the flood-carrying capacity of the watercourse
in any way.
C. In addition, FEMA and the Pennsylvania Department of Community and
Economic Development shall be notified prior to any alteration or
relocation of any watercourse.
2. When the Township of Swatara proposes to permit the following encroachments:
any development that causes a rise in the base flood elevations within
the floodway; or any development occurring in Zones A1-30 and Zone
AE without a designated floodway, which will cause a rise of more
than one foot in the base flood elevation; or alteration or relocation
of a stream (including but not limited to installing culverts and
bridges), the applicant shall (as per 44 CFR 65.12):
A. Apply to FEMA for conditional approval of such action prior to permitting
the encroachments to occur.
B. Upon receipt of the FEMA Administrator's conditional approval
of map change and prior to approving the proposed encroachments, a
community shall provide evidence to FEMA of the adoption of floodplain
management ordinances incorporating the increased base flood elevations
and/or revised floodway reflecting the post-project condition.
C. Upon completion of the proposed encroachments, the applicant shall
provide as-built certifications. FEMA will initiate a final map revision
upon receipt of such certifications in accordance with 44 CFR Part
67.
3. Any new construction, development, uses or activities allowed within
any identified floodplain area shall be undertaken in strict compliance
with the provisions contained in this Part and any other applicable
codes, ordinances and regulations.
[Ord. No. 2020-3, 6/11/2020]
1. Residential Structures.
A. In AE, A1-30, and AH Zones, any new construction or substantial improvement
shall have the lowest floor (including basement) elevated up to, or
above, the regulatory flood elevation.
B. In A Zones, where there are no base flood elevations specified on the FIRM, any new construction or substantial improvement shall have the lowest floor (including basement) elevated up to, or above, the regulatory flood elevation determined in accordance with §
27-1317, Subsection 1C, of this Part.
C. In AO Zones, any new construction or substantial improvement shall
have the lowest floor (including basement) at or above the highest
adjacent grade at least as high as the depth number specified on the
FIRM.
D. The design and construction standards and specifications contained
in the 2015 International Building Code (IBC) and in the 2015 International
Residential Code (IRC), or the latest edition thereof adopted by the
Commonwealth of Pennsylvania, and ASCE 24 and 34 Pa. Code (Chapters
401 through 405, as amended) shall be utilized, where they are more
restrictive.
2. Nonresidential Structures.
A. In AE, A1-30 and AH Zones, any new construction or substantial improvement
of a nonresidential structure shall have the lowest floor (including
basement) elevated up to, or above, the regulatory flood elevation,
or be designed and constructed so that the space enclosed below the
regulatory flood elevation:
(1)
Is floodproofed so that the structure is watertight with walls
substantially impermeable to the passage of water; and
(2)
Has structural components with the capability of resisting hydrostatic
and hydrodynamic loads and effects of buoyancy.
B. In A Zones, where no base flood elevations are specified on the FIRM, any new construction or substantial improvement shall have the lowest floor (including basement) elevated or completely floodproofed up to, or above, the regulatory flood elevation determined in accordance with §
27-1317, Subsection 1C, of this Part.
C. In AO Zones, any new construction or substantial improvement shall
have their lowest floor elevated or completely floodproofed above
the highest adjacent grade to at least as high as the depth number
specified on the FIRM.
D. Any nonresidential structure, or part thereof, made watertight below
the regulatory flood elevation shall be floodproofed in accordance
with the W1 or W2 space classification standards contained in the
publication entitled "Flood-Proofing Regulations," published by the
U.S. Army Corps of Engineers (June 1972, as amended March 1992), or
with some other equivalent standard. All plans and specifications
for such floodproofing shall be accompanied by a statement certified
by a registered professional engineer or architect which states that
the proposed design and methods of construction are in conformance
with the above referenced standards. There should be a statement submitted
with the permit application and a statement submitted with the as-built
floodproofing certificate prior to the issuance of the certificate
of occupancy.
E. Any nonresidential structure that will be floodproofed must submit
the following to the Floodplain Administrator along with the nonresidential
floodproofing certificate and prior to the issuance of the certificate
of occupancy:
(1)
An inspection and maintenance plan detailing the annual maintenance
of floodproofed components ensuring that all components will operate
properly under flood conditions. Components that must be inspected
include, at a minimum:
(a)
Mechanical equipment, such as sump pumps and generators;
(b)
Flood shields and closures;
(c)
Walls and wall penetrations; and
(d)
Levees and berms (as applicable).
(2)
A flood emergency operation plan detailing the procedures to
be followed during a flooding event, which must include information
pertaining to how all components will operate properly under all conditions,
including power failures. The design professional must produce the
plan. An adequate plan must include the following:
(a)
An established chain of command and responsibility with leadership
responsibilities clearly defined for all aspects of the plan.
(b)
A procedure for notification of necessary parties when flooding
threatens and flood warnings are issued. Personnel required to be
at the building should have a planned and safe means of ingress and
should have no other emergency response duties during a flood event.
Alternates should be assigned in the event that the primary persons
responsible are unable to complete their assigned duties under the
plan.
(c)
A list of specific duties assigned to ensure that all responsibilities
are addressed expeditiously. The locations of materials necessary
to properly install all floodproofing components must be included
in the list.
(d)
An evacuation plan for all personnel or occupants; those without
duties for the flood emergency as well as those with duties for implementing
the plan. All possible ingress and egress routes must be identified.
(e)
A periodic training and exercise program to keep personnel and
occupants aware of their duties and responsibilities. Training drills
should be held at least once a year and should be coordinated with
community officials.
F. The design and construction standards and specifications contained
in the 2015 International Building Code (IBC) and in the 2015 International
Residential Code (IRC), or the latest revision thereof as adopted
by the Commonwealth of Pennsylvania, and ASCE 24 and 34 Pa. Code (Chapters
401 through 405, as amended) shall be utilized, where they are more
restrictive.
3. Space Below the Lowest Floor.
A. Fully enclosed space below the lowest floor (excluding basements)
which will be used solely for the parking of a vehicle, building access,
or incidental storage in an area other than a basement shall be designed
and constructed to allow for the automatic entry and exit of floodwaters
for the purpose of equalizing hydrostatic forces on exterior walls.
The term "fully enclosed space" also includes crawl spaces.
B. Designs for meeting this requirement must either be certified by
a registered professional engineer or architect or meet or exceed
the following minimum criteria:
(1)
A minimum of two openings having a net total area of not less
than one square inch for every square foot of enclosed space installed
on two separate walls.
(2)
The bottom of all openings shall be no higher than one foot
above grade.
(3)
Openings may be equipped with screens, louvers, or other coverings
or devices, provided that they permit the automatic entry and exit
of floodwaters.
4. Historic Structures. Historic structures undergoing repair or rehabilitation
that would constitute a substantial improvement, as defined in this
Part, must comply with all ordinance requirements that do not preclude
the structure's continued designation as an historic structure.
Documentation that a specific ordinance requirement will cause removal
of the structure from the National Register of Historic Places or
the State Inventory of Historic places must be obtained from the Secretary
of the Interior or the State Historic Preservation Officer. Any exemption
from ordinance requirements will be the minimum necessary to preserve
the historic character and design of the structure.
5. Accessory Structures. Structures accessory to a principal building
need not be elevated or floodproofed to remain dry, but shall comply,
at a minimum, with the following requirements:
A. The structure shall not be designed or used for human habitation,
but shall be limited to the parking of vehicles, or to the storage
of tools, material, and equipment related to the principal use or
activity.
B. Floor area shall not exceed 200 square feet.
C. The structure will have a low damage potential.
D. The structure will be located on the site so as to cause the least
obstruction to the flow of floodwaters.
E. Power lines, wiring, and outlets will be elevated to the regulatory
flood elevation.
F. Permanently affixed utility equipment and appliances such as furnaces,
heaters, washers, dryers, etc., are prohibited.
G. Sanitary facilities are prohibited.
H. The structure shall be adequately anchored to prevent flotation,
collapse, and lateral movement and shall be designed to automatically
provide for the entry and exit of floodwater for the purpose of equalizing
hydrostatic forces on the walls. Designs for meeting this requirement
must either be certified by a registered professional engineer or
architect, or meet or exceed the following minimum criteria:
(1)
A minimum of two openings having a net total area of not less
than one square inch for every square foot of enclosed space.
(2)
The bottom of all openings shall be no higher than one foot
above grade.
(3)
Openings may be equipped with screens, louvers, etc., or other
coverings or devices, provided that they permit the automatic entry
and exit of floodwaters.
I. For accessory structures that are 200 square feet or larger in area (footprint) and that are below the base flood elevation, a variance is required as set forth in §§
27-1334 through
27-1335. If a variance is granted, a signed declaration of land restriction (nonconversion agreement) shall be recorded on the property deed prior to issuance of the certificate of occupancy.
J. The storage of hazardous materials in accessory structures is prohibited.
[Ord. No. 2020-3, 6/11/2020]
1. The following minimum standards shall apply for all construction
and development proposed within any identified floodplain area:
A. Fill. If fill is used, it shall:
(1)
Extend laterally at least 15 feet beyond the building line from
all points;
(2)
Consist of soil or small rock materials only; sanitary landfills
shall not be permitted;
(3)
Be compacted to provide the necessary permeability and resistance
to erosion, scouring, or settling;
(4)
Be no steeper than one vertical to two horizontal feet unless
substantiated data justifying steeper slopes are submitted to, and
approved by, the Floodplain Administrator; and
(5)
Be used to the extent to which it does not adversely affect
adjacent properties.
B. Drainage Facilities. Storm drainage facilities shall be designed
to convey the flow of stormwater runoff in a safe and efficient manner.
The system shall ensure proper drainage along streets and provide
positive drainage away from buildings. The system shall also be designed
to prevent the discharge of excess runoff onto adjacent properties.
C. Water and Sanitary Sewer Facilities and Systems.
(1)
All new or replacement water supply and sanitary sewer facilities
and systems shall be located, designed and constructed to minimize
or eliminate flood damages and the infiltration of floodwaters.
(2)
Sanitary sewer facilities and systems shall be designed to prevent
the discharge of untreated sewage into floodwaters.
(3)
No part of any on-site waste disposal system shall be located
within any identified floodplain area except in strict compliance
with all state and local regulations for such systems. If any such
system is permitted, it shall be located so as to avoid impairment
to it, or contamination from it, during a flood.
(4)
The design and construction provisions of the UCC and FEMA No.
348, "Protecting Building Utilities From Flood Damages," and "The
International Private Sewage Disposal Code" shall be utilized.
D. Other Utilities. All other utilities such as gas lines, electrical
and telephone systems shall be located, elevated (where possible)
and constructed to minimize the chance of impairment during a flood.
E. Streets. The finished elevation of all new streets shall be no more
than one foot below the regulatory flood elevation.
F. Storage. All materials that are buoyant, flammable, explosive, or in times of flooding, could be injurious to human, animal, or plant life, and not listed in §
27-1324, Development That May Endanger Human Life, shall be stored at or above the regulatory flood elevation or floodproofed to the maximum extent possible.
G. Placement of Buildings and Structures. All buildings and structures
shall be designed, located, and constructed so as to offer the minimum
obstruction to the flow of water and shall be designed to have a minimum
effect upon the flow and height of floodwater.
H. Anchoring.
(1)
All buildings and structures shall be firmly anchored in accordance
with accepted engineering practices to prevent flotation, collapse,
or lateral movement.
(2)
All air ducts, large pipes, storage tanks, and other similar
objects or components located below the regulatory flood elevation
shall be securely anchored or affixed to prevent flotation.
I. Floors, Walls and Ceilings.
(1)
Wood flooring used at or below the regulatory flood elevation
shall be installed to accommodate a lateral expansion of the flooring,
perpendicular to the flooring grain, without causing structural damage
to the building.
(2)
Plywood used at or below the regulatory flood elevation shall
be of a marine or water-resistant variety.
(3)
Walls and ceilings at or below the regulatory flood elevation
shall be designed and constructed of materials that are water-resistant
and will withstand inundation.
(4)
Windows, doors, and other components at or below the regulatory
flood elevation shall be made of metal or other water-resistant material.
J. Paints and Adhesives.
(1)
Paints and other finishes used at or below the regulatory flood
elevation shall be of a marine or water-resistant quality.
(2)
Adhesives used at or below the regulatory flood elevation shall
be of a marine or water-resistant variety.
(3)
All wooden components (doors, trim, cabinets, etc.) used at
or below the regulatory flood elevation shall be finished with a marine
or water-resistant paint or other finishing material.
K. Electrical Components.
(1)
Electrical distribution panels shall be at least three feet
above the base flood elevation.
(2)
Separate electrical circuits shall serve lower levels and shall
be dropped from above.
L. Equipment.
(1)
Water heaters, furnaces, air-conditioning and ventilating units,
and other electrical, mechanical or utility equipment or apparatus
shall not be located below the regulatory flood elevation and shall
be anchored to resist floatation, collapse, and lateral movement.
(2)
Ductwork shall be elevated to or above the regulatory flood
elevation or floodproofed to remain water-resistant.
M. Fuel Supply Systems. All gas and oil supply systems shall be designed
to prevent the infiltration of floodwaters into the system and discharges
from the system into floodwaters. Additional provisions shall be made
for the drainage of these systems in the event that floodwater infiltration
occurs.
N. Uniform Construction Code Coordination. The standards and specifications
contained in 34 Pa. Code (Chapters 401 through 405), as amended, and
not limited to the following provisions, shall apply to the above
and other sections and subsections of this Part, to the extent that
they are more restrictive and supplement the requirements of this
Part.
(1)
International Building Code (IBC) 2015, or the latest revision
thereof as adopted by the Commonwealth of Pennsylvania: Sections 801,
1202, 1403, 1603, 1605, 1612, 3402, and Appendix G.
(2)
International Residential Building Code (IRC) 2015, or the latest
revision thereof as adopted by the Commonwealth of Pennsylvania: Sections
R104, R105, R109, R322, Appendix E, and Appendix J.
[Ord. No. 2020-3, 6/11/2020]
1. In accordance with the Pennsylvania Flood Plain Management Act, and the regulations adopted by the Department of Community
and Economic Development as required by the Act, any new or substantially
improved structure which will be used for the production or storage
of any of the following dangerous materials or substances; or will
be used for any activity requiring the maintenance of a supply of
more than 550 gallons, or other comparable volume, of any of the following
dangerous materials or substances on the premises; or will involve
the production, storage, or use of any amount of radioactive substances
shall be subject to the provisions of this section, in addition to
all other applicable provisions. The following list of materials and
substances are considered dangerous to human life:
K. Nitric acid and oxides of nitrogen.
L. Petroleum products (gasoline, fuel oil, etc.).
P. Sulphur and sulphur products.
Q. Pesticides (including insecticides, fungicides, and rodenticides).
R. Radioactive substances, insofar as such substances are not otherwise
regulated.
2. Within any floodway area, any structure of the kind described in Subsection
1 above shall be prohibited. Where permitted within any identified floodplain area, any new or substantially improved residential structure of the kind described in §
27-1324, Subsection
1, above shall be elevated to remain completely dry up to at least two feet above base flood elevation and built in accordance with §§
27-1321,
27-1322 and
27-1323.
3. Where permitted within any identified floodplain area, any new or substantially improved nonresidential structure of the kind described in §
27-1324, Subsection
1, above shall be built in accordance with §§
27-1321,
27-1322 and
27-1323, including:
A. Elevated or designed and constructed to remain completely dry up
to at least two feet above base flood elevation; and
B. Designed to prevent pollution from the structure or activity during
the course of a base flood.
C. Any such structure, or part thereof, that will be built below the
regulatory flood elevation shall be designed and constructed in accordance
with the standards for completely dry floodproofing contained in the
publication "Flood-Proofing Regulations" (U.S. Army Corps of Engineers,
June 1972, as amended March 1992), or with some other equivalent watertight
standard.
[Ord. No. 2020-3, 6/11/2020]
All subdivision proposals and development proposals containing
at least 50 lots or at least five acres, whichever is the lesser,
in identified floodplain areas where base flood elevation data are
not available shall be supported by hydrologic and hydraulic engineering
analyses that determine base flood elevations and floodway information.
The analyses shall be prepared by a licensed professional engineer
in a format required by FEMA for a conditional letter of map revision
(CLOMR) and letter of map revision (LOMR). Submittal requirements
and processing fees shall be the responsibility of the applicant.
[Ord. No. 2020-3, 6/11/2020]
1. Existing manufactured homes located within the identified floodplain
area that have the lowest floor inundated by water at any point shall
be deemed substantially damaged and shall be repaired/improved only
in full compliance with the provisions of this Part and verified by
a licensed engineer.
2. Within any identified floodplain area, any new manufactured homes shall be prohibited. If a variance is obtained in accordance with the criteria in §§
27-1334 through
27-1335, then the following provisions apply:
3. Where permitted within any identified floodplain area, all manufactured
homes, and any improvements thereto, shall be:
A. Placed on a permanent foundation;
B. Elevated so that the lowest floor of the manufactured home is at
least two feet above base flood elevation; and
C. Anchored to resist flotation, collapse, or lateral movement.
4. Equipment Requirement.
A. Water heaters, furnaces, air-conditioning and ventilating units,
and other electrical, mechanical or utility equipment or apparatus
shall not be located below the regulatory flood elevation and shall
be anchored to resist floatation, collapse, and lateral movement.
B. Ductwork shall be elevated to or above the regulatory flood elevation
or floodproofed to remain water-resistant.
5. Installation of manufactured homes shall be done in accordance with
the manufacturers' installation instructions as provided by the
manufacturer. Where the applicant cannot provide the above information,
the requirements of Appendix E of the 2015 International Residential
Building Code or the "U.S. Department of Housing and Urban Development's
Permanent Foundations for Manufactured Housing," 1984 Edition, draft
or latest revision thereto, and 34 Pa. Code Chapters 401 through 405
shall apply.
6. Consideration shall be given to the installation requirements of
the 2015 IBC and the 2015 IRC, or the latest revision thereto as adopted
by the Commonwealth of Pennsylvania, and 34 Pa. Code, as amended,
where appropriate and/or applicable to units where the manufacturers'
standards for anchoring cannot be provided or were not established
for the proposed unit(s) installation.
[Ord. No. 2020-3, 6/11/2020]
1. Recreational vehicles in Zones A, A1-30, AH and AE must either:
A. Be on the site for fewer than 180 consecutive days; and
B. Be fully licensed and ready for highway use; or
C. Meet the permit requirements for manufactured homes in §
27-1326.
[Ord. No. 2020-3, 6/11/2020]
1. In accordance with the administrative regulations promulgated by
the Department of Community and Economic Development to implement
the Pennsylvania Flood Plain Management Act, the following activities shall be prohibited within any
identified floodplain area unless a special permit has been issued
by the Township of Swatara:
A. The commencement of any of the following activities; or the construction,
enlargement, or expansion of any structure used, or intended to be
used, for any of the following activities:
B. The commencement of, or any construction of, a new manufactured home
park or manufactured home subdivision, or substantial improvement
to an existing manufactured home park or manufactured home subdivision.
[Ord. No. 2020-3, 6/11/2020]
1. Applicants for special permits shall provide five copies of the following
items:
A. A written request, including a completed permit application form.
B. A small scale map showing the vicinity in which the proposed site
is located.
C. A plan of the entire site, clearly and legibly drawn at a scale of
one inch being equal to 100 feet or less, showing the following:
(1)
North arrow, scale and date;
(2)
Topography based upon the North American Vertical Datum (NAVD)
of 1988, showing existing and proposed contours at intervals of two
feet;
(3)
All property and lot lines, including dimensions, and the size
of the site expressed in acres or square feet;
(4)
The location of all existing streets, drives, other accessways,
and parking areas, with information concerning widths, pavement types
and construction, and elevations;
(5)
The location of any existing bodies of water or watercourses,
buildings, structures and other public or private facilities, including
railroad tracks and facilities, and any other natural and man-made
features affecting, or affected by, the proposed activity or development;
(6)
The location of the floodplain boundary line, information and
spot elevations concerning the base flood elevation, and information
concerning the flow of water, including direction and velocities;
(7)
The location of all proposed buildings, structures, utilities,
and any other improvements; and
(8)
Any other information which the municipality considers necessary
for adequate review of the application.
D. Plans of all proposed buildings, structures and other improvements,
clearly and legibly drawn at suitable scale, showing the following:
(1)
Sufficiently detailed architectural or engineering drawings,
including floor plans, sections, and exterior building elevations,
as appropriate;
(2)
For any proposed building, the elevation of the lowest floor
(including basement) and, as required, the elevation of any other
floor;
(3)
Complete information concerning flood depths, pressures, velocities,
impact and uplift forces, and other factors associated with the base
flood;
(4)
Detailed information concerning any proposed floodproofing measures,
including the flood emergency operation plan and the inspection and
maintenance plan;
(5)
Cross-section drawings for all proposed streets, drives, other
accessways, and parking areas, showing all rights-of-way and pavement
widths;
(6)
Profile drawings for all proposed streets, drives, and vehicular
accessways, including existing and proposed grades; and
(7)
Plans and profiles of all proposed sanitary and storm sewer
systems, water supply systems, and any other utilities and facilities.
E. The following data and documentation:
(1)
Certification from the applicant that the site upon which the
activity or development is proposed is an existing separate and single
parcel, owned by the applicant or the client he represents;
(2)
Certification from a registered professional engineer, architect,
or landscape architect that the proposed construction has been adequately
designed to protect against damage from the base flood;
(3)
A statement, certified by a registered professional engineer,
architect, landscape architect, or other qualified person which contains
a complete and accurate description of the nature and extent of pollution
that might possibly occur from the development during the course of
a base flood, including a statement concerning the effects such pollution
may have on human life;
(4)
A statement, certified by a registered professional engineer,
architect, or landscape architect, which contains a complete and accurate
description of the effects the proposed development will have on base
flood elevation and flows;
(5)
A statement, certified by a registered professional engineer,
architect, or landscape architect, which contains a complete and accurate
description of the kinds and amounts of any loose buoyant materials
or debris that may possibly exist or be located on the site below
the base flood elevation and the effects such materials and debris
may have on base flood elevation and flows;
(6)
The appropriate component of the Department of Environmental
Protection's "Planning Module for Land Development";
(7)
Where any excavation or grading is proposed, a plan meeting
the requirements of the Department of Environmental Protection to
implement and maintain erosion and sedimentation control;
(8)
Any other applicable permits such as, but not limited to, a
permit for any activity regulated by the Department of Environmental
Protection under Section 302 of Act 1978-166; and
(9)
An evacuation plan which fully explains the manner in which
the site will be safely evacuated before or during the course of a
base flood.
[Ord. No. 2020-3, 6/11/2020]
1. Upon receipt of an application for a special permit by the Township of Swatara, the following procedures shall apply in addition to those of §§
27-1306 through
27-1315:
A. Within three working days following receipt of the application, a
complete copy of the application and all accompanying documentation
shall be forwarded to the County Planning Commission by registered
or certified mail for its review and recommendations. Copies of the
application shall also be forwarded to the Township of Swatara Planning
Commission and Township of Swatara Engineer for review and comment.
B. If an application is received that is incomplete, the Township of
Swatara shall notify the applicant, in writing, stating in what respect
the application is deficient.
C. If the Township of Swatara decides to disapprove an application,
it shall notify the applicant, in writing, of the reasons for the
disapproval.
D. If the Township of Swatara approves an application, it shall file
written notification, together with the application and all pertinent
information, with the Department of Community and Economic Development,
by registered or certified mail, within five working days after the
date of approval.
E. Before issuing the special permit, the Township of Swatara shall
allow the Department of Community and Economic Development 30 days,
after receipt of the notification by the Department, to review the
application and decision made by the Township of Swatara.
F. If the Township of Swatara does not receive any communication from
the Department of Community and Economic Development during the thirty-day
review period, it may issue a special permit to the applicant.
G. If the Department of Community and Economic Development should decide
to disapprove an application, it shall notify the Township of Swatara
and the applicant, in writing, of the reasons for the disapproval,
and the Township of Swatara shall not issue the special permit.
[Ord. No. 2020-3, 6/11/2020]
1. In addition to the requirements of §§
27-1321 through
27-1327 of this Part, the following minimum requirements shall also apply to any proposed development requiring a special permit. If there is any conflict between any of the following requirements and those in §§
27-1321 through
27-1327 of this Part or in any other code, ordinance, or regulation, the more restrictive provision shall apply.
2. No application for a special permit shall be approved unless it can
be determined that the structure or activity will be located, constructed
and maintained in a manner which will:
A. Fully protect the health and safety of the general public and any
occupants of the structure. At a minimum, all new structures shall
be designed, located, and constructed so that:
(1)
The structure will survive inundation by waters of the base
flood without any lateral movement or damage to either the structure
itself, or to any of its equipment or contents below the BFE.
(2)
The lowest floor (including basement) will be elevated to at
least two feet above base flood elevation.
(3)
The occupants of the structure can remain inside for an indefinite
period of time and be safely evacuated at any time during the base
flood.
B. Prevent any significant possibility of pollution, increased flood
levels or flows, or debris endangering life and property.
3. All hydrologic and hydraulic analyses shall be undertaken only by
professional engineers or others of demonstrated qualifications, who
shall certify that the technical methods used correctly reflect currently
accepted technical concepts. Studies, analyses, computations, etc.,
shall be submitted in sufficient detail to allow a thorough technical
review by the Township of Swatara and the Department of Community
and Economic Development.
[Ord. No. 2020-3, 6/11/2020]
The provisions of this Part do not require any changes or improvements to be made to lawfully existing structures. However, when an improvement is made to any existing structure, the provisions of §
27-1333 shall apply.
[Ord. No. 2020-3, 6/11/2020]
1. The following provisions shall apply whenever any improvement is
made to an existing structure located within any identified floodplain
area:
A. No expansion or enlargement of an existing structure shall be allowed
within any floodway area/district that would cause any increase in
BFE.
B. No expansion or enlargement of an existing structure shall be allowed
within the AE Area/District without floodway that would, together
with all other existing and anticipated development, increase the
BFE more than one foot at any point.
C. Any modification, alteration, reconstruction, or improvement of any
kind to an existing structure to an extent or amount of 50% or more
of its market value shall constitute a substantial improvement and
shall be undertaken only in full compliance with the provisions of
this Part.
D. The above activity shall also address the requirements of the 34
Pa. Code, as amended, and the 2015 IBC and the 2015 IRC, or most recent
revision thereof as adopted by the Commonwealth of Pennsylvania.
E. Within any floodway area/district (See §
27-1317, Subsection 1A.), no new construction or development shall be allowed, unless the appropriate permit is obtained from the Department of Environmental Protection Regional Office.
F. Within any AE Area/District without floodway (See §
27-1317, Subsection 1B.), no new construction or development shall be located within the area measured 50 feet landward from the top-of-bank of any watercourse, unless the appropriate permit is obtained from the Department of Environmental Protection Regional Office.
[Ord. No. 2020-3, 6/11/2020]
If compliance with any of the requirements of this Part would
result in an exceptional hardship to a prospective builder, developer
or landowner, the Township of Swatara Zoning Hearing Board may, upon
request, grant relief from the strict application of the requirements.
[Ord. No. 2020-3, 6/11/2020]
1. Requests for variances shall be considered by the Township of Swatara Zoning Hearing Board in accordance with the procedures contained in §
27-1315 and the following:
A. No variance shall be granted for any construction, development, use,
or activity within any floodway area/district that would cause any
increase in the BFE.
B. No variance shall be granted for any construction, development, use,
or activity within any AE Area/District without floodway that would,
together with all other existing and anticipated development, increase
the BFE more than one foot at any point.
C. No variances shall be granted for a proposed accessory structure
that exceeds 600 square feet in size. A signed nonconversion agreement
is required as a condition of receiving the variance.
D. Except for a possible modification of the regulatory flood elevation requirement involved, no variance shall be granted for any of the other requirements pertaining specifically to development regulated by special permit (§§
27-1321 through
27-1327) or to development that may endanger human life (§
27-1324).
E. If granted, a variance shall involve only the least modification
necessary to provide relief.
F. In granting any variance, the Township of Swatara Zoning Hearing
Board shall attach whatever reasonable conditions and safeguards it
considers necessary in order to protect the public health, safety,
and welfare, and to achieve the objectives of this Part.
G. Whenever a variance is granted, the Township of Swatara Zoning Hearing
Board shall notify the applicant, in writing, that:
(1)
The granting of the variance may result in increased premium
rates for flood insurance.
(2)
Such variances may increase the risks to life and property.
H. In reviewing any request for a variance, the Township of Swatara
Zoning Hearing Board shall consider, at a minimum, the following:
(1)
That there is good and sufficient cause.
(2)
That failure to grant the variance would result in exceptional
hardship to the applicant.
(3)
That the granting of the variance will neither:
(a)
Result in an unacceptable or prohibited increase in flood heights,
additional threats to public safety, or extraordinary public expense;
nor
(b)
Create nuisances, cause fraud on, or victimize the public, or
conflict with any other applicable state or local ordinances and regulations.
I. A complete record of all variance requests and related actions shall
be maintained by the Township of Swatara Zoning Hearing Board. In
addition, a report of all variances granted during the year shall
be included in the annual report to the FEMA.
2. Notwithstanding any of the above, however, all structures shall be
designed and constructed so as to have the capability of resisting
the 1% annual chance flood.
[Ord. No. 2020-3, 6/11/2020]
Unless specifically defined below, words and phrases used in
this Part shall be interpreted so as to give this Part its most reasonable
application.
[Ord. No. 2020-3, 6/11/2020]
ACCESSORY USE OR STRUCTURE
A use or structure on the same lot with, and of a nature
customarily incidental and subordinate to, the principal use or structure.
BASE FLOOD
A flood which has a 1% chance of being equaled or exceeded
in any given year (also called the "100-year flood" or "1% annual
chance flood").
BASE FLOOD DISCHARGE
The volume of water resulting from a base flood as it passes
a given location within a given time, usually expressed in cubic feet
per second (cfs).
BASE FLOOD ELEVATION (BFE)
The elevation shown on the Flood Insurance Rate Map (FIRM)
for Zones AE, AH, A1-30 that indicates the water surface elevation
resulting from a flood that has a 1% or greater chance of being equaled
or exceeded in any given year.
BASEMENT
Any area of the building having its floor below ground level
on all sides.
BUILDING
A combination of materials to form a permanent structure
having walls and a roof. Included shall be all manufactured homes
and trailers to be used for human habitation.
DECLARATION OF LAND RESTRICTION (NONCONVERSION AGREEMENT)
A form signed by the property owner to agree not to convert
or modify in any manner that is inconsistent with the terms of the
permit and this Part, certain enclosures below the lowest floor of
elevated buildings and certain accessory structures. The form requires
the owner to record it on the property deed to inform future owners
of the restrictions.
DEVELOPMENT
Any man-made change to improved or unimproved real estate,
including but not limited to the construction, reconstruction, renovation,
repair, expansion, or alteration of buildings or other structures;
the placement of manufactured homes; streets, and other paving; utilities;
filling, grading and excavation; mining; dredging; drilling operations;
storage of equipment or materials; and the subdivision of land.
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
A manufactured home park or subdivision for which the construction
of facilities for servicing the lots on which the manufactured homes
are to be affixed (including, at a minimum, the installation of utilities,
the construction of streets, and either final site grading or the
pouring of concrete pads) is completed before the effective date of
the floodplain management regulations adopted by a community.
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
The preparation of additional sites by the construction of
facilities for servicing the lots on which the manufactured homes
are to be affixed (including the installation of utilities, the construction
of streets, and either final site grading or the pouring of concrete
pads).
FLOOD
A temporary inundation of normally dry land areas.
FLOOD INSURANCE RATE MAP (FIRM)
The official map on which the Federal Emergency Management
Agency has delineated both the areas of special flood hazard and the
risk premium zones applicable to the community.
FLOOD INSURANCE STUDY (FIS)
The official report provided by the Federal Emergency Management
Agency that includes flood profiles, the Flood Insurance Rate Map,
the Flood Boundary and Floodway Map, and the water surface elevation
of the base flood.
FLOODPLAIN AREA
A relatively flat or low land area which is subject to partial
or complete inundation from an adjoining or nearby stream, river or
watercourse; and/or any area subject to the unusual and rapid accumulation
of surface waters from any source.
FLOODPROOFING
Any combination of structural and nonstructural additions,
changes, or adjustments to structures which reduce or eliminate flood
damage to real estate or improved real property, water and sanitary
facilities, structures and their contents.
FLOODWAY
The channel of a river or other watercourse and the adjacent
land areas that must be reserved in order to discharge the base flood
without cumulatively increasing the water surface elevation more than
one foot.
HIGHEST ADJACENT GRADE
The highest natural elevation of the ground surface prior
to construction next to the proposed walls of a structure.
HISTORIC STRUCTURE
Any structure that is:
1.
Listed individually in the National Register of Historic Places
(a listing maintained by the Department of the Interior) or preliminarily
determined by the Secretary of the Interior as meeting the requirements
for individual listing on the National Register;
2.
Certified or preliminarily determined by the Secretary of the
Interior as contributing to the historical significance of a registered
historic district or a district preliminarily determined by the Secretary
to qualify as a registered historic district;
3.
Individually listed on a state inventory of historic places
in states which have been approved by the Secretary of the Interior;
or
4.
Individually listed on a local inventory of historic places
in communities with historic preservation that have been certified
either:
A.
By an approved state program as determined by the Secretary
of the Interior; or
B.
Directly by the Secretary of the Interior in states without
approved programs.
IDENTIFIED FLOODPLAIN AREA
This term is an umbrella term that includes all of the areas within which the community has selected to enforce floodplain regulations. It will always include the area identified as the special flood hazard area on the Flood Insurance Rate Maps and Flood Insurance Study, but may include additional areas identified by the community. See §§
27-1316 and
27-1317 for the specifics on what areas the community has included in the identified floodplain area.
LOWEST FLOOR
The lowest floor of the lowest fully enclosed area (including
basement). An unfinished, flood-resistant, partially enclosed area,
used solely for parking of vehicles, building access, and incidental
storage, in an area other than a basement area is not considered the
lowest floor of a building, provided that such space is not designed
and built so that the structure is in violation of the applicable
nonelevation design requirements of this Part.
MANUFACTURED HOME
A structure, transportable in one or more sections, which
is built on a permanent chassis, and is designed for use with or without
a permanent foundation when attached to the required utilities. The
term includes park trailers, travel trailers, recreational and other
similar vehicles which are placed on a site for more than 180 consecutive
days.
NEW CONSTRUCTION
Structures for which the start of construction commenced
on or after the effective start date of this Part and includes any
subsequent improvements to such structures. Any construction started
after December 1, 1981, and before the effective start date of this
Part is subject to the ordinance in effect at the time the permit
was issued, provided the start of construction was within 180 days
of permit issuance.
NEW MANUFACTURED HOME PARK OR SUBDIVISION
A manufactured home park or subdivision for which the construction
of facilities for servicing the lots on which the manufactured homes
are to be affixed (including, at a minimum, the installation of utilities,
the construction of streets, and either final site grading or the
pouring of concrete pads) is completed on or after the effective date
of floodplain management regulations adopted by a community.
PERSON
An individual, partnership, public or private association
or corporation, firm, trust, estate, municipality, governmental unit,
public utility or any other legal entity whatsoever which is recognized
by law as the subject of rights and duties.
POST-FIRM STRUCTURE
A structure for which construction or substantial improvement
occurred after December 31, 1974, or on or after the community's
initial Flood Insurance Rate Map (FIRM) dated December 1, 1981, whichever
is later, and, as such, would be required to be compliant with the
regulations of the National Flood Insurance Program.
PRE-FIRM STRUCTURE
A structure for which construction or substantial improvement
occurred on or before December 31, 1974, or before the community's
initial Flood Insurance Rate Map (FIRM) dated December 1, 1981, whichever
is later, and, as such, would not be required to be compliant with
the regulations of the National Flood Insurance Program.
RECREATIONAL VEHICLE
A vehicle which is:
1.
Built on a single chassis;
2.
Not more than 400 square feet, measured at the largest horizontal
projections;
3.
Designed to be self-propelled or permanently towable by a light-duty
truck;
4.
Not designed for use as a permanent dwelling but as temporary
living quarters for recreational, camping, travel, or seasonal use.
REGULATORY FLOOD ELEVATION
The base flood elevation (BFE) or estimated flood height
as determined using simplified methods plus a freeboard safety factor
of two feet. The freeboard safety factor also applies to utilities
and ductwork.
SPECIAL FLOOD HAZARD AREA (SFHA)
An area in the floodplain subject to a 1% or greater chance
of flooding in any given year. It is shown on the FIRM as Zone A,
AO, A1-A30, AE, A99, or AH.
SPECIAL PERMIT
A special approval which is required for hospitals, nursing
homes, jails, and new manufactured home parks/subdivisions, and substantial
improvements to such existing parks, when such development is located
in all, or a designated portion, of a floodplain.
START OF CONSTRUCTION
Includes substantial improvement and other proposed new development
and means the date the permit was issued, provided the actual start
of construction, repair, reconstruction, rehabilitation, addition,
placement, or other improvement was within 180 days after the date
of the permit and shall be completed within 12 months after the date
of issuance of the permit, unless a time extension is granted, in
writing, by the Floodplain Administrator. The actual start means either
the first placement of permanent construction of a structure on a
site, such as the pouring of slab or footings, the installation of
piles, the construction of columns, or any work beyond the stage of
excavation; or the placement of a manufactured home on a foundation.
Permanent construction does not include land preparation, such as
clearing, grading, and filling; nor does it include the installation
of streets and walkways; nor does it include excavation for a basement,
footings, piers, or foundations or the erection of temporary forms;
nor does it include the installation on the property of accessory
buildings, such as garages or sheds not occupied as dwelling units
or not part of the main structure. For a substantial improvement,
the actual start of construction means the first alteration of any
wall, ceiling, floor, or other structural part of a building, whether
or not that alteration affects the external dimensions of the building.
STRUCTURE
A walled and roofed building, including a gas or liquid storage
tank that is principally aboveground, as well as a manufactured home.
SUBDIVISION
The division or redivision of a lot, tract, or parcel of
land by any means into two or more lots, tracts, parcels or other
divisions of land, including changes in existing lot lines for the
purpose, whether immediate or future, of lease, partition by the court
for distribution to heirs, or devisees, transfer of ownership or building
or lot development; provided, however, that the subdivision by lease
of land for agricultural purposes into parcels of more than 10 acres,
not involving any new street or easement of access or any residential
dwelling, shall be exempted.
SUBSTANTIAL DAMAGE
Damage from any cause sustained by a structure, whereby the
cost of restoring the structure to its before-damaged condition would
equal or exceed 50% or more of the market value of the structure before
the damage occurred.
SUBSTANTIAL IMPROVEMENT
Any reconstruction, rehabilitation, addition, or other improvement
of a structure, of which the cost equals or exceeds 50% of the market
value of the structure before the start of construction of the improvement.
This term includes structures which have incurred substantial damage,
regardless of the actual repair work performed. The term does not,
however, include any project for improvement of a structure to correct
existing violations of state or local health, sanitary, or safety
code specifications which have been identified by the local code enforcement
official and which are the minimum necessary to assure safe living
conditions.
UNIFORM CONSTRUCTION CODE (UCC)
The statewide building code adopted by the Pennsylvania General
Assembly in 1999, applicable to new construction in all municipalities,
whether administered by the municipality, a third party or the Department
of Labor and Industry. Applicable to residential and commercial buildings,
the code adopted the International Residential Code (IRC) and the
International Building Code (IBC), by reference, as the construction
standard applicable with the state floodplain construction. For coordination
purposes, references to the above are made specifically to various
sections of the IRC and the IBC.
VARIANCE
A grant of relief by a community from the terms of a floodplain
management regulation.
VIOLATION
The failure of a structure or other development to be fully
compliant with the community's floodplain management regulations.
A structure or other development without the elevation certificate,
other certifications, or other evidence of compliance required in
44 CFR 60.3(b)(5), (c)(4), (c)(10), (d)(3), (e)(2), (e)(4), or (e)(5)
is presumed to be in violation until such time as that documentation
is provided.
[Ord. No. 2020-3, 6/11/2020; as amended by Ord. No. 2020-4, 8/13/2020]
The official Zoning Map of Swatara Township, Lebanon County,
Pennsylvania, shall be amended to reflect the changes in the Floodplain
District boundaries per the updated flood hazard maps prepared by
FEMA.