The fees, charges, penalties, costs and other expenses to be charged by the town are hereby adopted as set forth in this appendix, titled fee schedule. It is required by this appendix that the fees set forth herein shall be paid by those receiving or requesting city services as listed herein.
(Ordinance 237-8-2011, sec. 1, adopted 8/1/11; Ordinance 278-06-2015, sec. 1, adopted 6/8/15)
Any person, firm, company, partnership, corporation, or association violating any provision of this appendix shall be deemed guilty of a misdemeanor and, upon conviction thereof, shall be fined an amount of not more than five hundred dollars ($500.00) for each such violation, and each and every day that the provisions of this appendix are violated shall constitute a separate and distinct offense.
(Ordinance 237-8-2011, sec. 4, adopted 8/1/11; Ordinance 278-06-2015, sec. 4, adopted 6/8/15)
Site Plans and Platting:
Method of Calculation
Proposed
Min.
Pre development conference
Flat fee
$750.00 per hour
$750.00
Preliminary, Final Plat or Replat
Flat fee
$1,000.00
 
Site and Landscape Plan Review
Base fee
$1,500.00 + $50.00 per lot
 
Engineering Review Fees, Third and Subsequent Reviews
% of actual cost
120%
$500.00
Infrastructure inspection fees
% of construction costs
4%
 
Zoning change
Base fee
$600.00
$600.00
Per acre
$50.00
$50.00
Maximum
$3,000.00
$3,000.00
Variance application
Flat fee
$500.00
 
Zoning verification letter
Flat fee
N
Publication cost
% + actual
Actual cost + 15%
 
Abandonment public right-of-way/easement
% + actual
$100.00 + engineering review
Continuance requested by applicant (notice of public hearing)
Flat fee
$100.00
(Ordinance 362-09-2022 adopted 9/12/22; Ordinance 388-09-2024 adopted 9/9/2024; Ordinance 403-09-2025 adopted 9/8/2025)
Residential Permit Type
Method of Calculation
Proposed
Min.
New residential
Price per square foot + required inspections
$2.00
$1,000.00
Meet with Building Inspector
Per hour
$100.00
Plan review
Flat fee
$100.00
 
Application fee
Flat fee
$50.00
Contractor change out
Flat fee
$25.00
Engineer review (this is a cost charged for building permits, new homes and building inspections only, the flat fee does not apply to platting and zoning reviews)
Flat fee
$400.00
 
Special circumstances fee - inspections for which there is no clear fee established
Flat fee
$75.00
After hours/emergency inspection
Flat fee
$150.00
Erosion control, porta privy, trash bin
Flat fee
$150.00
 
T-pole
Flat fee
$75.00
 
Piers (if applicable)
Flat Fee
$75.00
 
Plumbing rough
Flat fee
$150.00
 
Foundation
Flat fee
$120.00
 
Seconds inspections
Flat fee
$450.00
 
Sheathing inspection
Flat fee
$75.00
 
Window inspection
Flat fee
$75.00
 
Flatwork approach/culvert
Flat fee
$75.00
 
Grinder Pump Inspection
Flat fee
$75.00
 
Sheetrock Inspection
Flat fee
$75.00
 
Meter release
Flat fee
 
 
- Gas
Flat fee
$75.00
 
- Electric
Flat fee
$75.00
 
Finals
Flat fee
 
 
- Building
Flat fee
$75.00
 
- Mechanical
Flat fee
$75.00
 
- Plumbing
Flat fee
$75.00
 
- Electrical
Flat fee
$75.00
 
Temporary certificate of occupancy
Flat fee
$300.00 per month
Certificate of occupancy
Flat fee
$300.00
 
Accessory structure
Square footage + required inspections
$1.50 per square foot + inspections
$200.00
Outdoor patio/living structure no utilities
Flat fee
$235.00
 
Outdoor patio/living structure utilities
Flat fee
$350.00
 
Approach/flatwork
Flat fee
$200.00
 
Culvert permit
Flat fee
$500.00
 
Foundation repair
Flat fee
$225.00
 
Demo/removal permit
Flat fee
$250.00
 
Mechanical permit (HVAC)
Flat fee
$275.00
 
Mechanical permit (plumbing, electrical, water heater)
Flat fee
$175.00
 
Red tag inspections
Flat fee
$125.00
 
Energy permit
Flat fee
$150.00
 
Fence permit
Per 300 linear feet
$150.00
 
Expired permit re-issue/extension
Flat fee
Underlying permit fee x 0.5
 
Irrigation permit
Flat fee
$250.00
 
Grading inspection
Flat fee
$400.00
Back flow permit
Flat fee
$125.00
 
Water well permit
Flat fee
$500.00
 
Retaining wall
Flat fee
$400.00
 
Roofing permit
Flat fee
$150.00
 
Septic system permit
Flat fee
 
 
-New
Flat fee
$560.00
 
-Repair
Flat fee
$275.00
 
-Substantiated complaint
Flat fee
$150.00
 
-Unsubstantiated complaint
Flat fee
$0.00
 
Solar permit
Flat fee
$300.00
 
Hot tub/spa permit
Flat fee
$200.00
 
In ground swimming pool permit
Flat fee
$1,290.00
 
Above ground swimming pool
Flat fee
$200.00
 
Decking
Flat fee
$150.00
 
Unpermitted work fee
Flat fee
2 X permit
 
Denied plan review
Flat fee
$175.00
 
Window replacement permit
Flat fee
$150.00
 
Moving permit (building)
Flat fee
$350.00
 
Temporary storage unit
Flat fee
 
 
-First 3 months
Flat fee
$100.00
 
-Additional 3 months
Flat fee
$300.00
 
(Ordinance 362-09-2022 adopted 9/12/22; Ordinance 388-09-2024 adopted 9/9/2024; Ordinance 403-09-2025 adopted 9/8/2025)
Misc.
Method of Calculation
Proposed
Min.
Peddlers fee
Flat fee + application fee
$35.00
 
Health inspections
Flat fee
$125.00
 
Administrative fee
Flat fee
$250.00
 
Solid waste connect fee
Flat fee
$25.00
 
Solid waste late fee
Flat fee
$15.00
 
Solid waste user fees *set by current contract
Flat fee
 
 
-Regular residential
Flat fee
 
-Senior rate
Flat fee
 
Deposit
Flat fee
$100.00
 
Returned check/ACH
Flat fee
$50.00
 
Newsletter advertising
Flat fee
$25.00
Right-of-way permit
Flat fee
$500.00
Credit card processing fees
%
3.5%
 
Short-term rental
Flat fee
$1,500.00
 
Community center rental
 
 
 
Residents
 
$100.00
 
Non-residents
 
$300.00
 
Deposit
 
$200.00
 
Notary service
Documents up to 5 pages free, documents 6 or more pages notarized by appointment only and notary service charges will apply.
Certification of public documents
$3.00
Public information requests
Follows state regulations
Charges for public information requests will be in accordance with the Public Information Act as set forth by the State of Texas.
(Ordinance 362-09-2022 adopted 9/12/22; Ordinance 388-09-2024 adopted 9/9/2024; Ordinance 403-09-2025 adopted 9/8/2025)
Commercial building fees will be charged in accordance with the Uniform Building Code Fee Schedule currently adopted by this code.
(Ordinance 403-09-2025 adopted 9/8/2025)