ZONING FEES | |
|---|---|
Zoning Review Fees | |
Planned development district (PDD) | $2,000.00 + $100.00 per acre ($5,000.00 max) |
Zone change (all other categories) | $750.00 + $100.00 per acre ($3,000.00 max) |
Special Use Permits, Variances, and Special Exception Review Fees | |
Special use permit | $750.00 + $100.00 per acre ($3,000.00 max) |
Variance from zoning ordinance, for each provision for which a variance is sought | $750.00 |
Miscellaneous Zoning Review Fees | |
Future land use plan amendment (when not associated with a zoning request) | $750.00 + $100.00 per acre ($3,000.00 max) |
Planned development district (PDD) amendment | $2,000.00 + $100.00 per acre ($5,000.00 max) |
Resubmittal fee | $250.00 |
Renotification fee | $200.00 |
Appeal of zoning code determination | $500.00 |
Formal zoning determination letter | $25.00 |
ADDITIONAL DEVELOPMENT REVIEW FEES | |
|---|---|
Requests for creation of any special district related to infrastructure financing | $15,000.00 |
Expansion of any special district related to infrastructure financing | $5,000.00 |
SUBDIVISION REVIEW FEES | |
|---|---|
Plat Review Fees | |
Master development plan | Base fee: $1,250.00 + $5.00 per acre. Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Preliminary plats | Base fee: $1,250.00 Plus per lot fee for single-family: $15.00 per acre fee for nonsingle-family: $30.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Final plats | Base fee: $1,250.00 Plus per lot fee for single-family: $15.00 per acre fee for nonsingle-family: $30.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Amending plats | Base fee: $750.00 Plus per lot fee for single-family: $15.00 per acre fee for nonsingle-family: $30.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Replats | Base fee: $750.00 Plus per lot fee for single-family: $15.00 per acre fee for nonsingle-family: $30.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Amendment to plat | $500.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Variance to subdivision requirements, for each provision for which a variance is sought | $750.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Any review, authorization, approval, inspection, or permit not otherwise provided for. | Actual cost |
Associated Plat Review and Building Permit Review Fees | |
Tier 1 drainage analysis review | Base fee: $750.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Tier 2 drainage analysis review | Single-family residential: Small (0–5 acres) base fee: $1,500.00 Large (5+ acres) base fee: $2,500 + $10/lot Commercial/industrial/multifamily: Small (0–5 acres) base fee: $1,750.00 Large (5+ acres) base fee: $2,500 + $10/acre Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
CLOMAR/LOMAR review | Base fee: $3,500.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Minor traffic impact analysis (TIA) review | Base fee: $1,250.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Major traffic impact analysis (TIA) review | Base fee: $2,500.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Any review, authorization, approval, inspection, or permit not otherwise provided for. | Actual cost |
Subdivision Improvement Construction Review and Inspection Fees | |
|---|---|
Subdivision improvement construction plan review for more than one type of infrastructure (includes the entire limits of construction): | Base fee: $2,500.00 Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Subdivision improvement construction plan review for individual infrastructure (not to exceed the fee for more than one type of infrastructure): | Base fee: $1,250.00 plus $5.00 per linear foot of each infrastructure improvement. |
Subdivision improvement construction inspections, deposit for inspections. | $78.00 base fee + $3.10 per linear foot of each infrastructure improvement to be inspected. Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. The city reserves the right to halt inspections once 80% of the base fee of supplemental fee on deposit has been incurred until such time as an additional deposit of fees is made based on actual conditions and improvements. |
Subdivision improvement construction cost estimate review (when associated with city acceptance of surety) | $700.00 base fee (includes a maximum of four hours of outside consultant review time) Supplemental fee: Actual cost for all outside consultant review time required in excess of hours included in base fee. |
Any review, authorization, approval, inspection, or permit not otherwise provided for. | Actual cost |
SIGN PERMIT REVIEW FEES | |
|---|---|
Permanent Sign Permit Review Fees | |
Permanent sign permit review fee, per sign | $75.00 base fee + inspection fee for signs requiring electrical inspections, per sign inspection fee table below. |
Sign Valuation | Sign Inspection Fee Table |
$1.00–$10,000 | $128.46 |
$10,001–$25,000 | $181.61 for the first $10,000.00 plus $14.03 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 |
$25,001–$50,000 | $392.03 for the first $25,000.00 plus $10.12 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 |
$50,001–$100,000 | $645.04 for the first $50,000.00 plus $7.01 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 |
$100,001–$500,000 | $995.74 for the first $100,000 plus $5.61 for each additional $1,000.00 or fraction thereof, to and including $500,000.00 |
$500,001–$1,000,000 | $3,240.22 for the first $500,000 plus $4.76 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 |
$1,000,000 and up | $5,619.97 for the first $1,000,000 plus $3.16 for each additional $1,000.00 or fraction thereof |
Other Sign Permit Review Fees | |
Temporary sign permit review fee | $25.00 |
Variance from sign ordinance | $500.00 |
BUILDING PLAN REVIEW FEES | |
|---|---|
General Building Permit Fees | |
Certificate of occupancy – new business | $300.00 |
Certificate of occupancy – existing business (name change only) | $25.00 |
Formal permit determination letter | $25.00 |
Commercial and Multifamily Plan Review Fees | |
Project Valuation | Fee Calculations |
$1–$10,000 | $83.50 |
$10,001–$25,000 | $118.05 for the first $10,000.00 plus $9.12 for each additional $1,000.00 or fraction thereof to and including $25,000.00 |
$25,001–$50,000 | $254.83 for the first $25,000.00 plus $6.58 for each additional $1,000.00 or fraction thereof to and including $100,000.00 |
$50,001–$100,000 | $419.32 for the first $50,000.00 plus $4.56 for each additional $1,000.00 or fraction thereof to and including $100,000.00 |
$100,001–$500,000 | $645.04 for the first $100,000.00 plus $3.66 for each additional $1,000.00 or fraction thereof to and including $500,000.00 |
$500,001–$1,000,000 | $2,110.20 for the first $500,000.00 plus $3.09 for each additional $1,000.00 or fraction thereof to and including $500,000.00 |
$1,000,001 and up | $3,654.95 for the first $1,000,000.00 plus $2.05 for each additional $1,000.00 or fraction thereof |
Civil-Site Plan Review Fees | |
Civil-site plan review, including, but not limited to, drainage, grading, paving, erosion and sedimentation control, and access improvements associated with nonresidential building permit requests. | Base fee: $1,000.00 when no on-site detention is proposed. Base fee: $2,000.00 when on-site detention is proposed. Supplemental fee: Actual cost for expenses incurred by the city in excess of base fee. |
Any review, authorization, approval, inspection, or permit not otherwise provided for. | Actual cost |
Single-Family and Multifamily Residential Plan Review + Inspection Fees | |
Permit Type | Permit Fee |
New single-family residential | $995.74 plus $0.58 per square foot over 1,500 square feet. |
Stand alone swimming pool | Actual cost, fee to be paid based on estimate provided by city upon submittal of permit request. |
New multifamily | |
Multifamily fire code plan review | |
Multifamily sprinkler plan review | |
Multifamily building and civil-site inspection | |
Multifamily fire alarm system inspection | |
Multifamily building inspection | |
Second resubmittal fee | $100.00 |
Demolition permit | $100.00 |
Reinspection fee (for failed inspections) | $75.00 per failed inspection |
Structural system remodel/repair fee (foundations, walls and roofs) | $500.00 |
Miscellaneous Trade Permit Fees | |
Single-system permits not requiring building plan review | $75.00 |
HEALTH CODE INSPECTION FEES | |
|---|---|
Health code inspection | $250.00 |
Reinspection due to failed inspection | $250.00 |
FIRE CODE PLAN REVIEW FEES | |
|---|---|
Fire Alarm Plan Review Fees | |
System Valuation | Fee |
$10,000.00 or less | $100.00 |
$10,001.00–$20,000.00 | $190.00 |
$20,000.00–$30,000.00 | $260.00 |
$30,001.00–$40,000.00 | $315.00 |
$40,001.00–$50,000.00 | $370.00 |
Over $50,000 | $375.00 for the first $50,000.00 + $4.00 per additional $1,000.00 |
Fire Sprinkler Plan Review Fees | |
$10,000.00 or less | $100.00 |
$10,001.00–$20,000.00 | $190.00 |
$20,000.00–$30,000.00 | $260.00 |
$30,001.00–$40,000.00 | $315.00 |
$40,001.00–$50,000.00 | $370.00 |
Over $50,000.00 | $375.00 for the first $50,000.00 + $4.00 per additional $1,000.00. |
BUILDING AND CIVIL-SITE INSPECTION FEES | |
|---|---|
Building Inspection Fees | |
Project Valuation | Fee |
$1.00–$10,000.00 | $128.46 |
$10,001.00–$25,000.00 | $181.61 for the first $10,000 plus $14.03 for each additional $1,000.00 or fraction thereof, to and including $25,000 |
$25,001.00–$50,000.00 | $392.03 for the first $25,000 plus $10.12 for each additional $1,000.00 or fraction thereof, to and including $50,000 |
$50,001.00–$100,000.00 | $645.04 for the first $50,000 plus $7.01 for each additional $1,000.00 or fraction thereof, to and including $100,000 |
$100,001.00–$500,000.00 | $995.74 for the first $100,000 plus $5.61 for each additional $1,000.00 or fraction thereof, to and including $500,000 |
$500,001.00–$1,000,000.00 | $3,240.22 for the first $500,000 plus $4.76 for each additional $1,000.00 or fraction thereof, to and including $1,000,000 |
$1,000,000.00 and up | $5,619.97 for the first $1,000,000 plus $3.16 for each additional $1,000.00 or fraction thereof |
Reinspection due to failed inspection | Actual cost |
Civil-Site Inspection Fee Schedule | |
Civil-site construction inspections | $50.00 base fee Supplemental fee: Actual cost for all outside consultant review time required in excess of hours included in base fee. |
Any review, authorization, approval, inspection, or permit not otherwise provided for. | Actual cost |
Reinspection due to failed inspection | Actual cost |
FIRE CODE INSPECTION FEES | |
|---|---|
Fire Alarm System Inspection Fees | |
System Valuation | Fee |
$10,000.00 or less | $100.00 |
$10,001.00–$20,000.00 | $190.00 |
$20,000.00–$30,000.00 | $260.00 |
$30,001.00–$40,000.00 | $315.00 |
$40,001.00–$50,000.00 | $370.00 |
Over $50,000 | $375.00 for the first $50,000.00 + $4.00 per additional $1,000.00 |
Reinspection due to failed inspection | Actual cost |
Fire Sprinkler System Inspection Fees | |
$10,000.00 or less | $100.00 |
$10,001.00–$20,000.00 | $190.00 |
$20,000.00–$30,000.00 | $260.00 |
$30,001.00–$40,000.00 | $315.00 |
$40,001.00–$50,000.00 | $370.00 |
Over $50,000 | $375.00 for the first $50,000.00 + $4.00 per additional $1,000.00 |
Reinspection due to failed inspection | Actual cost |
Annual Fire Safety Inspection Fee | |
Annual fire safety inspection and each reinspection (per location) | $150.00 |
OTHER PERMIT FEES | |
|---|---|
Miscellaneous Trade Permit Fee | |
Demolition permit | $100.00 |
Watershed Preservation and Protection Permits | |
Tree preservation permit | $250.00, plus $10.00 per acre of preservation site |
Steep slope development | $250.00, plus $10.00 per acre of preservation site |
Cut and fill | $250.00, plus $10.00 per acre of preservation site |
Water quality | $250.00, plus $10.00 per acre of preservation site |
Impervious cover | $250.00, plus $10.00 per acre of preservation site |
Per-caliper-inch cash value for replacement trees | $300.00 per caliper inch |
Floodplain Development Permit Fee Schedule | |
Official floodplain determination letter | $50.00 |
Elevation certificate review (when property is located within the floodplain, but proposed building/development is not) | $200.00 |
Full floodplain development permit review (when property and proposed building/development is located within the floodplain) | Base fee: $700.00 (includes a maximum of four hours of outside consultant review time). Supplemental fee: Actual cost for all outside consultant review time required in excess of hours included in base fee. |
Site Preparation and Rights-of-Way Work Fees | |
Driveway/curb-cut permit | $125.00 base fee, plus $500.00 deposit refundable upon completion |
Street-cut permit review fee (utilities, etc.) | $200.00 |
Miscellaneous Fees | |
Inspections outside of normal business hours | Actual cost |
Inspections for which no fee is specifically indicated | Actual cost |
Variance to building code, per provision from which a variance is sought | $500.00 |
Appeal of building code determination | $500.00 |
REGISTRATION FEES | |
|---|---|
Licensing and Registration Fees | |
General contractor licensing fee | $150.00 initial fee + $100.00 annual renewal fee |
(Ordinance 591, ex. A, adopted 8/13/19; Ordinance 612 adopted 6/9/20; Ordinance 701 adopted 6/14/22)