In case any work is begun where a permit is required by this article, but without permission being first secured therefor, or if electrical installations are otherwise being made in violation of this article, the electrical inspector shall have the power to stop such work at once and to order any and all persons engaged therein to stop and desist therefrom until the proper permission is secured. Such action shall not defer any other penalties which may be applicable under this article.
(1976 Code, sec. 13-17; 1998 Code, sec. 46-41; 2013 Code, sec. 18-34)