Fees shall be established by the Township to cover plan review and construction inspection costs incurred by the Township. All fees shall be paid by the applicant at the time of SWM site plan submission. A review and inspection fee schedule shall be established by Township resolution. The Township shall periodically update the review and inspection fee schedule to ensure that review costs are adequately reimbursed.
The fees required by this chapter (unless otherwise waived by the Township) shall, at a minimum, cover:
A.
Township administrative costs.
B.
Township legal costs.
C.
Township engineering costs.
D.
The review of the stormwater (SWM) site plan by the Township.
E.
The review of as-built drawings.
F.
Attendance at meetings.
G.
The site inspections.
H.
The inspection of SWM facilities and drainage improvements during construction.
I.
The final inspection at the completion of the construction of the SWM facilities and drainage improvements presented in the SWM site plan.
J.
Any additional work required to enforce any permit provisions regulated by this chapter, correct violations, and assure proper completion of stipulated remedial actions.