(a) Permits,
inspections and other services.
For services rendered,
the schedule of fees and charges is:
(1) Gas well permit (per well): $5,000.00.
(3) Extended permit: $320.00.
(4) Supplemental permit: $220.00.
(5) Operator transfer: $840.00.
(6) Seismic site inspection: $420.00.
(7) Annual fee (per well): $640.00.
(8) Compressor facility: $525.00.
(9) Regulated pipeline: $1,850.00.
(10) Fresh water fracture pond: $780.00.
(11) Maintenance permit (per well): $1,000.00.
(b) Appeals.
Appeal fees shall be required for every appeal in the amount
of three hundred dollars ($300.00).
(c) Tree
removal and tree planting.
(1) Payment to the tree fund of $200.00 per diameter inch will be required
for 25% of the removed trees greater than six (6) inches on pad sites
located in Agricultural zoned areas.
(2) Upon approval of the director of public works, payment may be made
at an amount of $600.00 per required tree in lieu of planting requirements
for gas well sites and fracture ponds.
(Ordinance 12212009-1, secs. 10.5-14,
10.5-20, 10.5-21, adopted 12/21/09; Ordinance 2018-06 adopted 2/26/18)
The permit for an injection well shall be made available for
the sum of five hundred dollars ($500.00).
(Ordinance 2014-04-21-02 adopted 4/21/14)
Every application for a directional drilling permit shall be
accompanied by a filing fee in the amount of two thousand five hundred
dollars ($2,500.00).
(Ordinance 100-04B, sec. 8.5-4,
adopted –/–/04)