All subdivision construction shall comply with the specifications and design standards as outlined hereinafter. Construction plans and specifications, which are required to be submitted to the general superintendent under section 10.02.044 of this article at least ten (10) days prior to the meeting of the commission at which final plat is to be considered, shall include, but not necessarily be limited to, the following:
(1)
Certification.
All construction plans shall be prepared by a registered professional engineer, registered in the State of Texas, and each plan sheet shall bear the engineer’s certification and seal.
(2)
North arrow.
All construction plans shall include a north arrow, scale or scales, and date.
(3)
Construction detail plan.
The construction detail plan sheet or sheets shall be a composite of all details of construction, such as detail of proposed inlet boxes, manholes, cleanouts, sewer and water service lines, street cross-sections, curb and gutter sizes, fire hydrant details, valve box details, headwalls or any other details necessary to show intent of construction.
(4)
Drainage.
A plan of the proposed storm sewer system. All culverts, bridges and channels shall be designed in accordance with the Texas Department of Transportation Hydraulic Manual. The general superintendent will be supplied with a copy of all required drainage area maps and computation sheets.
(5)
Plan-profile sheets.
The plan-profile sheets shall show the finished plan of all proposed utilities, stormwater drainage facilities and street construction. The profiles shall indicate the existing natural ground, proposed flow lines of sanitary sewers, storm sewers, channels, and top of curb.
(1987 Code, sec. 23-51)