Meter Size
Equivalency Factor
Water Impact Fee 1*
Wastewater Impact Fee 2**
Total Impact Fee 3***
5/8" x 5/8" and 5/8" x 3/4"
1.00
$2,292.00
$2,304.00
$4,596.00
3/4" x 3/4"
1.50
$3,439.00
$3,456.00
$6,895.00
1"
2.50
$5,731.00
$5,760.00
$11,491.00
1-1/2"
5.00
$11,462.00
$11,520.00
$22,982.00
2"
8.00
$18,339.00
$18,432.00
$36,771.00
3"
17.50
$40,117.00
$40,320.00
$80,437.00
4"
30.00
$68,772.00
$69,120.00
$137,892.00
6"
62.50
$143,275.00
$144,000.00
$287,275.00
8"
90.00
$206,316.00
$207,360.00
$413,676.00
10"
145.00
$332,398.00
$332,398.00
$666,478.00
*1
Water impact fees are calculated at 40% of the maximum fee (which included a statutory 50% credit).
**2
Wastewater impact fees are calculated at 100% of the maximum fee (which included a statutory 50% credit).
***3
Does not include Fort Worth impact fees shown below.
(Ordinance 015-2021 adopted 8/2/21)
For properties platted after January 1, 2022, the following Fort Worth System Access Fees shall be collected:
(1) 
Effective for all building permits issued on or after October 1, 2025, but before September 30, 2026:
Meter Size
Equivalency Factor
Water Impact Fee
5/8" x 5/8" and 5/8" x 3/4"
1.00
$2,824.00
3/4" x 3/4"
1.50
$4,236.00
1"
2.50
$7,060.00
1-1/2"
5.00
$14,120.00
2"
8.00
$22,592.00
3"
21.75
$61,422.00
4"
37.50
$105,900.00
6"
80.00
$225,920.00
8"
140.00
$395,360.00
10"
210.00
$593,040.00
(2) 
Effective for all building permits issued on or after October 1, 2026, but before September 30, 2027:
Meter Size
Equivalency Factor
Water Impact Fee
5/8" x 5/8" and 5/8" x 3/4"
1.00
$2,990.00
3/4" x 3/4"
1.50
$4,485.00
1"
2.50
$7,475.00
1-1/2"
5.00
$14,950.00
2"
8.00
$23,920.00
3"
21.75
$65,033.00
4"
37.50
$112,125.00
6"
80.00
$239,200.00
8"
140.00
$418,600.00
10"
210.00
$627,900.00
(3) 
All building permits issued on or before September 30, 2025, shall be subject to those fees set forth in Ordinance No. 031-2021, effective November 8, 2021.
(Ordinance 031-2021 adopted 11/8/21; Ordinance 019-2025 adopted 9/15/2025)