(a)
For all original wastewater connections made and connected to city wastewater systems, the minimum tap or connection fee to charged to and aid by the user of the wastewater facility of the city is as follows:
Wastewater Tap | Fee |
|---|---|
Full Tap - 4" | $2,700.00 |
(b)
The fee for a four-inch wastewater tap shall be $2,700.00, and such fee shall apply irrespective of when the wastewater tap is made. Any other wastewater tap service fees will be subject to a determination to be made by the city's director of public works on a per-job basis, so that the city's actual cost of the fee tap will be recuperated.
(c)
Included within the full tap fee charge the city will furnish up to 60 feet of four-inch wastewater pipe and all necessary appurtenances needed to make installation. Any expenses incurred for boring or cutting a street or curb and for installation of over 60 feet of wastewater pipe shall be borne by the user. The user shall pay, prior to installation, the estimated cost of materials, labor and overhead as determined by the director of public works.
(Ordinance 1222, § 3, 8-13-02; Ordinance 1340, § 6, 12-13-05; Ordinance 1404, § 2, 10-9-07; Ordinance 1486, § 2, 12-1-09; Ordinance 1770, § 1, 1-14-20; Ordinance 1908 adopted 8/30/2023)