[The table below lists sanitary sewer lines, manholes, pump stations and/or extensions accepted by the Collier Township Municipal Authority. Complete copies of the referenced resolutions are available from the Authority.]
Res. No.
Adoption Date
Description
3-1989
3-9-1989
Rennerdale Highlands, Phase I
4-1989
3-9-1989
Rennerdale Highlands, Phase II
11-23-93-01
11-23-1993
Nevillewood 4, Phase 2, 2-A, 2-B and 2-C
08-14-94-01
8-14-1994
Nevillewood 3, Phase 1 — St. Andrews Pump Station (Pump Station No. 1)
10-13-94-01
10-13-1994
Thoms Run Road Intersector Project
10-13-94-02
10-13-1994
Nevillewood 6R, Crown Development, Crown Place
11-10-94-01
11-10-1994
Nevillewood 5, Phase III-A, BR and CR (Annandale Drive, Carnoustie Court, Muirfield Drive)
11-10-94-02
11-10-1994
Nevillewood 7, Phase IV-A (Pinehurst)
12-08-94-01
12-8-1994
Nevillewood 3, Phase I (St. Mellion and St. Andrews)
02-09-95-01
2-9-1995
Township of Collier
07-11-96-02
7-11-1996
Nevillewood 6R, Crown Development, Crown Place
10-10-96-02
10-10-1996
Extension to serve Site 62 (Kelly Support Facility)
08-14-97-01
8-14-1997
Nevillewood 3, Phase I (St. Mellion and St. Andrews) — amendment to Res. No. 12-08-94-01
01-21-99-01
1-21-1999
Scotti Drive sanitary sewer line replacement
01-21-99-02
1-21-1999
Ewing Road extension
04-08-99-01
4-8-1999
Nevillewood 11, Phase I and II (Carnoustie area)
04-08-99-02
4-8-1999
Nevillewood 13, Phase 3-D (Sherwood Court area)
04-08-99-03
4-8-1999
Nevillewood 12, Phase 4-D (Sherwood Estates area)
05-13-99-01
5-13-1999
Dorrington Road — from Nevillewood in and along Dorrington Road to Robinson Run interceptor line
05-13-99-02
5-13-1999
Nevillewood 15, Phase 5-A-3 and 5-A-4 (Oakhill area)
12-09-99-01
12-9-1999
1263 Washington Pike extension
02-10-00-01
2-10-2000
Beechmont Farms, Phase I
02-10-00-02
2-10-2000
Nevillewood 16, Phase 5-A-1 (Breckenridge area)
02-10-00-03
2-10-2000
Hilltop Road Lift Station #2
08-10-00-01
8-10-2000
Nevillewood 17 (Turnberry area)
09-10-01-1
9-10-2001
Upper Scotts Run
11-14-02-02
11-14-2002
Maclaine Manor
12-12-02-01
12-12-2002
Baymont at Nevilleside
12-12-02-02
12-12-2002
Walkers Ridge
03-13-03-01
3-13-2003
Baymont at Nevilleside
05-08-03-01
5-8-2003
Summerfield Estates
08-11-05-02
8-11-2005
Charlton extension
09-14-06-01
9-14-2006
Cowan/Upper McMichael Road area, Phase 1-B
08-09-07-01
8-9-2007
Bryna Ridge extension
09-13-07-01
9-13-2007
Colonial Ridge-Vanek extension
10-11-07-01
10-11-2007
Cowan/South Cowan extension, Phase 1-C
10-11-07-02
10-11-2007
Mancini-Ewing Road extension
01-10-08-02
1-10-2008
K.P. Hollow line — Tuscany Ridge
12-11-08-02
12-11-2008
Neville Manor extension
07-10-09-01
7-10-2009
Cowan McMichael extension, Phase II
05-13-10-01
5-13-2010
Centennial Point Pump Station (Baldwin Road near Scotts Run Road)
12-09-10-01
12-9-2012
Upper Scotts Run
04-14-11-01
4-14-2011
Baldwin Road East/West extension, Phase I
06-14-12-01
6-14-2012
Walkers Ridge II
06-14-12-02
6-14-2012
Prestley Heights Phase I
02-14-13-01
2-14-2013
Rattenni Plan of Lots No. 2
02-14-13-02
2-14-2013
Summit Ridge, Phase III
02-14-13-03
2-14-2013
Baldwin Sewer Extension at Centennial Point Pump Station
04-11-13-01
4-11-2013
Centennial Pointe Phase I
04-11-13-02
4-11-2013
Ewing Farms Plan of Lots on Ewing Road
11-14-13-01
11-14-2013
Hilltop Road Phase 1
06-12-14-01
6-12-2014
Centennial Pointe Phase 1A
07-10-14-01
7-10-2014
Hilltop Road Sanitary Sewer Phase 1
05-14-15-01
5-14-2015
Washington Pike and Vanadium Road areas
08-13-15-01
8-13-2015
Steen Hollow Sanitary Sewer Extension, Beccari Extension, also referred to as the Boy Home Extension
08-13-15-02
8-13-2015
Centennial Pointe Phase 1-B
02-11-16-01
2-11-2016
Prestley Heights Phase 3
05-12-16-01
5-12-2016
Revised Nevilleside PRD
07-14-16-01
7-14-2016
Settlers Pointe Phase 1
09-08-16-01
9-8-2016
Centennial Pointe Phase 1-C
12-08-16-01
12-8-2016
Moretti Extension to Lot 3 Mullen Mountain Manor
02-09-2017-01
2-9-2017
Forza Collier Plan of lots
04-13-2017-01
4-13-2017
Amalfi Ridge Phase 1
06-08-2017-01
6-8-2017
FAA site along Nike Site Road
10-12-2017-01
10-12-2017
The southern side of Baldwin Road from Scotts Run Road to Ewing Road
03-08-2018-02
3-08-2018
Amalfi Ridge Phase 2
03-08-2018-01
3-8-2018
Apexis Parkside Plan of lots
05-10-2018-01
5-10-2018
Southern side of Baldwin Road from Scotts Run Road to Ewing Road
10-11-2018-01
10-11-2018
Parcel I.D. No. 331-H-7 (1274 Noblestown Road) to and including Parcel I.D. No. 331-M-3 (1242 Noblestown Road)
10-11-2018-02
10-11-2018
Existing residential dwellings located on Summer Drive and several adjoining residential properties that have rear lots that adjoin the properties located on Summer Drive
06-13-2019-01
7-11-2019
Upper Scotts Run sanitary sewer extension
2019-09-12-01
9-12-2019
Settlers Pointe Phase II
2020-02-13-01
2-13-2020
Noblestown Road sanitary sewer extension
2020-02-13-02
2-13-2020
Summer Drive sanitary sewer extension
2020-02-13-03
2-13-2020
Summer Drive force main sanitary sewer extension
2020-02-13-04
2-13-2020
Noblestown Road area
2020-02-13-05
2-13-2020
Southern side of Baldwin Road from Scotts Run Road to Ewing Road
06-11-2020-01
6-11-2020
Amalfi Ridge Phase 3