Backfilling in any street opened or excavated pursuant to an excavation permit issued under this chapter shall be compacted to a degree equivalent to that of the undisturbed ground in which the trench was dug. Compacting shall be done by mechanical tappers or vibrators, by rolling in layers, or by water settling, as required by the soil in question and sound engineering practices generally recognized in the construction industry. The decision as to whether a trench shall be backfilled by water settling shall be based upon sound engineering practices. When water is taken from a fire hydrant, the permittee shall assign one man to operate the hydrant and shall make certain that such man had been instructed by the town in the operation of the hydrant. The town shall likewise be notified at both the beginning and the end of the job so that the condition of the fire hydrant can be checked on both occasions. Any damage done to the hydrant during the excavation shall be the responsibility of the permittee. Water shall be paid for by the permittee on the terms agreed upon with the town.
(1981 Code, sec. 18-87; Ordinance 97-51, sec. 1, adopted 1997)