No land shall be occupied or used, and no building which is hereafter constructed, altered, added to, modified, repaired, rebuilt, or replaced shall be occupied until a certificate of compliance is issued by the Zoning Administrator, except where no permit is required, subject to the following:
A.
The certificate of compliance shall show that the building or premises or part thereof, and the proposed use, conform to the provisions of this chapter.
B.
Application for such certificate shall be concurrent with the application for a permit.
C.
If all ordinance provisions are met, the certificate of compliance shall be issued within 10 days after written notification that the permitted work is completed.
D.
The applicant shall submit a certificate signed by a registered professional engineer, architect, or land surveyor that the fill, lowest floor, and floodproofing elevations are in compliance with the permit issued.