The developer shall completely install all stormwater management facilities in accordance with the stormwater management site plan prior to unconditional stormwater management site plan approval unless the developer submits proper financial security. The amount and type of financial security shall meet the requirements of Section 509 of the MPC.[1]
[1]
Editor's Note: See 53 P.S. § 10509.
A. 
The Township Engineer or his designated agent shall inspect phases of the installation of the permanent stormwater management facilities as deemed appropriate by the Township Engineer. The developer and/or owner shall be responsible to insure the Township Engineer or his designated agent are on site to review and inspect all stormwater management facilities at the time of construction. No BMP shall be covered until a final inspection has been conducted by the Township Engineer or Township staff to assure adequate construction and structural integrity of any portion of the BMP to be covered.
B. 
During any stage of the work, if the Township Engineer determines that the permanent stormwater management facilities are not being installed in accordance with the approved stormwater management site plan, the Township shall revoke any existing permits until a revised stormwater management site plan is submitted and approved, as specified in this chapter. The Township may withhold the issuance of any additional permits or certificates of occupancy until the stormwater management facilities for the project are brought into compliance with the stormwater management site plan or a revised stormwater management site plan is approved.
A. 
No work shall be commenced on the installation of stormwater management facilities until financial security for the completion of said facilities is posted in an amount and type as required by Section 509 of the MPC.[1]
[1]
Editor's Note: See 53 P.S. § 10509.
B. 
No dedication of any stormwater management facilities, if applicable, will be accepted by the Township until financial security for the maintenance of said facilities is posted in an amount and type as required by Section 509 of the MPC.
C. 
As work of installing the required stormwater management facilities proceeds, the developer may request the Board of Supervisors to release or authorize to release portions of the financial security. The Township shall process such requests in accordance with Article V of the MPC.[2]
[2]
Editor's Note: See 53 P.S. § 10501 et seq.
D. 
Final completion and full release of financial security shall not occur until the Township has been supplied with a final as-built survey signed by a licensed engineer or surveyor depicting all stormwater management facilities installed for the project.