A. 
Fees shall be established by the Board by resolution, which may be amended from time to time to cover the expenses incurred by the Township listed in § 270-40A. The fee schedule may include an escrow deposit to secure the payment of the expenses. All fees shall be paid by the applicant, and the required escrow shall be deposited by the applicant, at the time of SWM site plan submission.
B. 
The fee schedule shall be based on the size of the regulated activity and based on the Township's costs for reviewing SWM site plans, O&M plans and agreements, and as-built plans, and conducting inspections pursuant to § 270-37. The Township shall periodically update the review and inspection fee schedule to ensure that review costs are adequately reimbursed.
A. 
The fees and escrow deposit required of the applicant by this chapter shall at a minimum cover:
(1) 
Administrative costs;
(2) 
The review of the SWM site plan by the Township, the Township Engineer, the Solicitor and other municipal consultants;
(3) 
Coordination and meetings with the applicant;
(4) 
The inspection of erosion and sediment control measures, BMPs, conveyances and other related improvements during construction;
(5) 
Review of project communications, reports, and additional supporting information;
(6) 
Other site inspections;
(7) 
The final inspection upon completion of the BMPs, conveyances, and other stormwater management facilities and related improvements presented in the SWM site plan; and
(8) 
Review of final as-built plan submission and revised calculations, and inspections as needed.
B. 
The applicant shall also reimburse all expenses incurred by the Township for any additional work or Township Solicitor or consultant fees in the course of reviewing the SWM site plan, or required to enforce any permit provisions regulated by this chapter, correct violations, and ensure proper completion of remedial actions.